DRAFT CDRL Pkg C-130H FPS Procurement DD1423Pkg_04132026.pdf
PDF 4 MB Posted
- Attached to
- C-130H Formation Position System Draft RFP
- Solicitation number
- FPS2026130
About this file
This is a Contract Data Requirements List (CDRL) package for the C-130H Formation Positioning System (FPS) Replacement Program, establishing 89 distinct data deliverables across multiple categories throughout the contract lifecycle. The CDRL specifies detailed requirements for technical documentation, software deliverables, test reports, logistics data, and program management materials, each with assigned data item numbers (C-series through V-series), required formats, approval authorities, distribution statements, and submission schedules tied to program milestones including System Requirements Review (SRR), Preliminary Design Review (PDR), Critical Design Review (CDR), First Flight Readiness Review (FFRR), and Physical Configuration Audit (PCA).
Key deliverable categories include systems engineering and design documentation (specifications, interface control documents, design descriptions), software development artifacts (software design descriptions, test plans, requirements specifications, version descriptions), reliability and maintainability analyses, safety and airworthiness assessments, electromagnetic compatibility and environmental testing data, human factors engineering documentation, cybersecurity and vulnerability assessments, manufacturing and quality assurance plans, logistics and sustainment data packages, training system requirements and courseware, and comprehensive program management reports including earned value management data and integrated master schedules. All deliverables require electronic submission in specified formats, with approval authority primarily vested in AFLCMC/WLNM (Air Force Life Cycle Management Center), distribution restricted to Department of Defense and DoD contractors under Distribution Statement D, and most draft submissions due 30-60 days prior to respective technical reviews with final submissions following approval or milestone completion. The CDRL applies to both Engineering and Manufacturing Development (EMD) and Production and Deployment (P&D) phases of the FPS replacement program for C-130H aircraft.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4/13/2026 CDRL Table of Contents C-130H FPS PROCUREMENT
CONTRACT #: TBD
CONTRACTOR: TBD
SET NAME: C-130H FPS Procurement SYSTEM ITEM: C-130H FORMATION
POSITIONING SYSTEM/
PROGRAM: C-130H FPS Replacement Program STATION KEEPING EQUIPMENT
(FPS/SKE)
DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH
C001 AFLCMC/WLN DI-MGMT-81453C SOW Para 3.5.2
DATA ACCESSION LIST (DAL)
C002 AFLCMC/WLN DI-SESS-80858D SOW Para 3.5.1
SUPPLIERS CONFIGURATION MANAGMENT PLAN (SCMP)
C003 AFLCMC/WLN DI-MISC-81454D SOW Para 3.5.1
COMPUTER PROGRAM IDENTIFICATION NUMBER (CPIN) CATALOG
INFORMATION
C004 AFLCMC/WLNM DI-ADMN-81401C/T SOW Para 3.5.1 CONTRACT CHANGE PROPOSALS (CCPs)
C005 AFLCMC/WLNM DI-SESS-80640E/T SOW Para 3.5.1
REQUEST FOR VARIANCE (RFV)
C006 AFLCMC/WLNM DI-SESS-80639E/T SOW Paras 3.5.1, 3.6.3, 3.6.4, 5.7.1
ENGINEERING CHANGE PROPOSALS (ECP)
C007 AFLCMC/WLNM DI-PSSS-82046 SOW Para 3.5.2.1
SOFTWARE LICENSE REQUIREMENTS LIST (SLRL)
E001 AFLCMC/WLNM DI-SESS-81785B SOW Paras 4.1.1.2, 4.1.3.6
SYSTEMS ENGINEERING MANAGEMENT PLAN (SEMP)
E002 AFLCMC/WLNM DI-IPSC-81431A/T SOW Para 4.1.3.1
SYSTEM/SUBSYSTEM SPECIFICATION (S/SS)
E003 AFLCMC/WLNM DI-IPSC-81432A SOW Para 4.1.3.1
SYSTEM/SUBSYSTEM DESIGN DESCRIPTION (SSDD)
E004 AFLCMC/WLNM DI-SESS-81248B SOW Para 4.1.3.3
INTERFACE CONTROL DOCUMENT (ICD)
E005 AFLCMC/WLNM DI-SESS-82380 SOW Para 4.1.3.5
MODEL BASED SYSTEMS ENGINEERING (MBSE) DEVELOPMENT
PLAN (MDP)
E006 AFLCMC/WLNM DI-MISC-80711A SOW Para 4.1.3.7.1
SCIENTIFIC AND TECHNICAL REPORTS
STRESS AND LOAD ANALYSIS REPORT
E007 AFLCMC/WLNM DI-SESS-81983 SOW Para 4.1.3.7.2
DURABILITY AND DAMAGE TOLERANCE (DADT) ANALYSIS
E008 AFLCMC/WLNM DI-MISC-80711A SOW Para 4.1.3.7.3
SCIENTIFIC AND TECHNICAL REPORTS
ELECTRICAL LOAD ANALYSIS (ELA) REPORT
E009 AFLCMC/WLNM DI-MISC-80711A SOW Para 4.1.3.7.4
SCIENTIFIC AND TECHNICAL REPORTS
ANTENNA CO-SITE ANALYSIS REPORT
E010 AFLCMC/WLNM DI-MISC-80711A SOW Para 4.1.3.7.5
SCIENTIFIC AND TECHNICAL REPORTS
ENVIRONMENTAL GAP ANALYSIS REPORT
DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH
E011 Deleted
E012 AFLCMC/WLNM DI-MISC-80711A SOW Para 4.1.3.7.7
SCIENTIFIC AND TECHNICAL REPORTS
THERMAL ANALYSIS REPORT
E013 AFLCMC/WLNM DI-IPSC-81427B SOW Para 4.1.4.1
SOFTWARE DEVELOPMENT PLAN (SDP)
E014 AFLCMC/WLNM DI-QCIC-81794A SOW Paras 4.1.4.1, 4.1.4.3, 4.1.5.2
QUALITY ASSURANCE PROGRAM PLAN (QAPP)
E015 AFLCMC/WLNM DI-IPSC-81442A/T SOW Para 4.1.4.2
SOFTWARE VERSION DESCRIPTION (SVD)
E016 AFLCMC/WLNM DI-IPSC-81433A/T SOW Paras 4.1.4.2, 4.1.4.3
SOFTWARE REQUIREMENTS SPECIFICATION (SRS)
E017 AFLCMC/WLNM DI-IPSC-81435B SOW Paras 4.1.4.2, 4.1.4.3
SOFTWARE DESIGN DESCRIPTION (SDD)
E018 AFLCMC/WLNM DI-IPSC-81438A/T SOW Para 4.1.4.2
SOFTWARE TEST PLAN (STP)
E019 AFLCMC/WLNM DI-IPSC-81439A/T SOW Para 4.1.4.2
SOFTWARE TEST DESCRIPTION (STD)
E020 AFLCMC/WLNM DI-IPSC-81440A/T SOW Para 4.1.4.2
SOFTWARE TEST REPORT (STR)
E021 AFLCMC/WLNM DI-IPSC-81434A/T SOW Para 4.1.4.2
INTERFACE REQUIREMENTS SPECIFICATION (IRS)
E022 AFLCMC/WLNM DI-IPSC-81441A/T SOW Para 4.1.4.2
SOFTWARE PRODUCT SPECIFICATION (SPS)
E023 AFLCMC/WLNM DI-QCIC-81795 SOW Para 4.1.4.3
SOFTWARE QUALITY ASSURANCE REPORT (SQAR)
E024 AFLCMC/WLNM DI-AVCS-80700A/T SOW Para 4.1.4.4
COMPUTER SOFTWARE PRODUCT END ITEM (CSPEI)
E025 AFLCMC/WLNM DI-MGMT-80004A/T SOW Para 4.1.5.1
MANAGEMENT PLAN
MANUFACTURING MANAGEMENT PLAN (MMP)
E026 Deleted
E027 AFLCMC/WLNM DI-SESS-81974 SOW Para 4.1.5.3
ASSESSMENT OF MANUFACTURING RISK AND READINESS
E028 AFLCMC/WLNM DI-MISC-80508B/T SOW Para 4.1.5.4
TECHNICAL REPORT - STUDY/SERVICES
QUALITY AND MANUFACTURING METRICS
E029 AFLCMC/WLNM DI-NDTI-81307A SOW Para 4.1.5.5
FIRST ARTICLE QUALIFICATION TEST PLAN AND PROCEDURES
E030 AFLCMC/WLNM DI-QCIC-80125B SOW Para 4.1.5.6
GIDEP ALERT/SAFE-ALERT REPORT
E031 AFLCMC/WLNM DI-QCIC-80126B SOW Para 4.1.5.6
GIDEP ALERT/SAFE-ALERT RESPONSE
E032 AFLCMC/WLNM DI-SESS-81613A SOW Para 4.1.6.1
RELIABILITY AND MAINTAINABILITY PROGRAM PLAN
E033 AFLCMC/WLNM DI-SESS-81497B SOW Para 4.1.6.2
RELIABILITY AND MAINTAINABILITY PREDICTIONS REPORT
E034 AFLCMC/WLNM DI-SESS-81496B SOW Para 4.1.6.3
RELIABILITY AND MAINTAINABILITY (R&M) BLOCK DIAGRAMS AND
MATHEMATICAL MODELS REPORT
E035 AFLCMC/WLNM DI-SESS-81495C SOW Para 4.1.6.4
FAILURE MODES, EFFECTS, AND CRITICALITY ANALYSIS (FMECA)
REPORT
REPORT
E036 AFLCMC/WLNM DI-SESS-80255B SOW Para 4.1.6.5
FAILURE SUMMARY AND ANALYSIS REPORT
E037 AFLCMC/WLNM DI-NDTI-80566A/T SOW Para 4.1.6.6
TEST PLAN
FAILURE MODES AND EFFECTS TESTING (FMET) TEST PLAN
E038 AFLCMC/WLNM DI-MISC-80508B/T SOW Para 4.1.6.6
TECHNICAL REPORT - STUDY/SERVICES
FAILURE MODES AND EFFECTS TESTING (FMET) TEST REPORT (TR)
E039 AFLCMC/WLNM DI-MISC-80508B/T SOW Para 4.1.6.8
TECHNICAL REPORT - STUDY/SERVICES
SAFETY CRITICAL FUNCTION THREAD ANALYSIS (SCFTA) REPORT
E040 AFLCMC/WLNE DI-MISC-80508B/T SOW Para 4.1.6.9
TECHNICAL REPORT – STUDY/SERVICES
SAFETY INTERLOCK ANALYSIS AND TEST (SIAT) REPORT
E041 AFLCMC/WLNE DI-SESS-81000F/T SOW Para 4.1.7.1
PRODUCT DRAWINGS AND ASSOCIATED LISTS
E042 AFLCMC/WLNM DI-MISC-80711A SOW Para 4.1.8.1.1
SCIENTIFIC AND TECHNICAL REPORTS
CRITICALITY ANALYSIS REPORT
E043 AFLCMC/WLNM DI-MISC-81832 SOW Para 4.1.8.2
COUNTERFEIT PREVENTION PLAN
E044 AFLCMC/WLNM DI-IPSC-82252A SOW Para 4.1.8.4
SOFTWARE VULNERABILITY ASSESSMENT REPORT (SVAR)
E045 AFLCMC/WLNM DI-MISC-80711A SOW Para 4.1.8.4
SCIENTIFIC AND TECHNICAL REPORTS
CYBERSECURITY ASSESSMENT REPORT
E046 AFLCMC/WLNM DI-MGMT-82191 SOW Para 4.1.8.4.1
CYBERSECURITY VULNERABILITY REPORT
E047 AFLCMC/WLNM DI-MGMT-81844/T SOW Para 4.1.8.4.2
INFORMATION ASSURANCE (IA) TEST PLAN
CYBERSECURITY TEST PLAN
E048 AFLCMC/WLNM DI-MGMT-81843/T SOW Para 4.1.8.4.2
INFORMATION ASSURANCE (IA) TEST REPORT
CYBERSECURITY TEST REPORT
E049 AFLCMC/WLNM DI-MGMT-82001A/T SOW 4.1.8.4.3
DoD Risk Management Framework (RMF) Package Deliverables
RMF DELIVERABLES
E050 AFLCMC/WLNM DI-MISC-80508B/T SOW Para 4.1.8.5
TECHNICAL REPORT - STUDY/SERVICES
SYSTEMS SECURITY WORKING GROUP (SSWG)
E051 AFLCMC/WLNM DI-EMCS-81827/T SOW Paras 4.1.8.6, 4.1.8.7
SPECTRUM CERTIFICATION SPECTRAL CHARACTERISTICS DATA
E052 AFLCMC/WLNM DI-MISC-80508B/T SOW Para 4.1.8.8
TECHNICAL REPORT - STUDY/SERVICES
COMMUNICATION, NAVIGATION, SURVEILLANCE/AIR TRAFFIC
MANAGEMENT (CNS/ATM) COMPLIANCE DATA
E053 AFLCMC/WLNM DI-MGMT-80004A/T SOW Para 4.1.9.1
MANAGEMENT PLAN
AIRWORTHINESS PLAN
E054 AFLCMC/WLNM DI-SESS-81766A SOW Para 4.1.9.2
AIRWORTHINESS CERTIFICATION BASIS
AIRWORTHINESS SPECIFICATION
E055 AFLCMC/WLNM DI-SESS-81768A SOW Para 4.1.9.2
AIRWORTHINESS COMPLIANCE REPORT
AIRWORTHINESS CERTIFICATION CRITERIA REPORT
E056 AFLCMC/WLNM DI-HFAC-80746C SOW Para 4.1.10.1
HUMAN ENGINEERING DESIGN APPROACH DOCUMENT
OPERATOR (HEDAD-O)
E057 AFLCMC/WLNM DI-MGMT-81398D SOW Para 4.1.11.1
HAZARDOUS MATERIALS MANAGEMENT PROGRAM PLAN
E058 AFLCMC/WLNM DI-MISC-81397D/T SOW Para 4.1.11.1
HAZARDOUS MATERIALS MANAGEMENT PROGRAM (HMMP)
REPORT
E059 AFLCMC/WLNM DI-SAFT-81626 SOW Para 4.1.11.2.1
SYSTEM SAFETY PROGRAM PLAN (SSPP)
E060 AFLCMC/WLNM DI-SAFT-80101C SOW Para 4.1.11.2.2
SYSTEM SAFETY HAZARD ANALYSIS REPORT (SSHAR)
FUNCTIONAL HAZARD ANALYSIS REPORT
E061 AFLCMC/WLNM DI-SAFT-80101C SOW Para 4.1.11.2.3
SYSTEM SAFETY HAZARD ANALYSIS REPORT (SSHAR)
SYSTEM SAFETY ASSESSMENT REPORT (SSAR)
E062 AFLCMC/WLNM DI-SESS-81770 SOW Para 4.1.12.1
SIL DEVELOPMENT AND MANAGEMENT PLAN
E063 AFLCMC/WLNM DI-SESS-81253E SOW Para 4.1.12.1
CONFIGURATION STATUS ACCOUNTING (CSA) INFORMATION
SIL CSA
E064 AFLCMC/WLNM DI-MSSM-81751 SOW Para 4.1.12.1
DOD M&S VERIFICATION AND VALIDATION (V&V) PLAN
E065 AFLCMC/WLNM DI-MSSM-81752 SOW Para 4.1.12.1
DOD M&S VERIFICATION AND VALIDATION REPORT
E066 AFLCMC/WLNM DI-EMCS-81540B/T SOW Para 4.1.13
E3 INTEGRATION AND ANALYSIS REPORT (E3IAR)
E067 AFLCMC/WLNM DI-EMCS-81541B SOW Para 4.1.13.1
E3 VERIFICATION PROCEDURES (E3VP)
E068 AFLCMC/WLNM DI-EMCS-81542B SOW Para 4.1.13.1
E3 VERIFICATION REPORT (E3VR)
E069 AFLCMC/WLNM DI-EMCS-80201C SOW Para 4.1.13.1
ELECTROMAGNETIC INTERFERENCE TEST PROCEDURES
E070 AFLCMC/WLNM DI-EMCS-80200C SOW Para 4.1.13.1
ELECTROMAGNETIC INTERFERENCE TEST REPORT (EMITR)
E071 AFLCMC/WLNE DI-SESS-81704 SOW Para 4.1.14
TEST PLANS/TEST PROCEDURES
ENVIRONMENTAL TEST PLANS/PROCEDURES
E072 AFLCMC/WLNM DI-QCIC-81890 SOW Para 4.1.14
QUALIFICATION TEST REPORT (QTR)
ENVIRONMENTAL QUALIFICATION TEST REPORT
E073 AFLCMC/WLNE DI-MGMT-81501A SOW Para 5.4.3.2
WEIGHT AND BALANCE REPORT FOR AIRCRAFT
E075 AFLCMC/WLNM DI-MISC-81356A/T SOW Para 5.6.4.1
CERTIFICATE OF COMPLIANCE
MEMORANDUM OF AIRWORTHINESS
E076 AFLCMC/WLNM DI-SESS-80255B SOW Para 5.6.5.3
FAILURE SUMMARY AND ANALYSIS REPORT
FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT (FACAR)
E077 AFLCMC/WLNM DI-MISC-80711A SOW Para 5.6.8.3
SCIENTIFIC AND TECHNICAL REPORTS
ARCHITECTURE ANALYSIS DATA
E078 AFLCMC/WLNM DI-IPSC-81429A/T SOW Para 5.6.9 SOFTWARE TRANSITION PLAN (STrP)
E079 AFLCMC/WLNM DI-IPSC-81428A/T SOW Para 5.6.9
SOFTWARE INSTALLATION PLAN (SIP)
E080 AFLCMC/WLNM DI-SESS-82364/T SOW Para 4.1.3.5
DIGITAL SYSTEM MODEL
E081 AFLCMC/WLNM DI-SESS-82045/T SOW Para 4.1.4.6
FIRMWARE DEVELOPMENT PLAN
E082 AFLCMC/WLNM DI-TMSS-80527D/T SOW Para 4.1.7.4
COMMERCIAL OFF-THE-SHELF (COTS) MANUALS AND
ASSOCIATED SUPPLEMENTAL DATA
E083 AFLCMC/WLNM DI-DRPR-81961C SOW Para 4.1.7.1
ACQUISITION AND SUSTAINMENT DATA PACKAGE (ADSP)
ENGINEERING DRAWING TREE
E084 AFLCMC/WLNM DI-MISC-80711A SOW Paras 3.2.1, 5.6.8.1
SCIENTIFIC AND TECHNICAL REPORTS
PROGRAM PROTECTION IMPLEMENTATION PLAN (PPIP)
E085 AFLCMC/WLNM DI-HFAC-81399B/T SOW Para 4.1.10.3
CRITICAL TASK ANALYSIS REPORT (CTAR)
E086 AFLCMC/WLNM DI-HFAC-80747C SOW Para 4.1.10.4
HUMAN ENGINEERING DESIGN APPROACH DOCUMENT
MAINTAINER (HEDAD-M)
E087 AFLCMC/WLNM DI-HFAC-81742B SOW Para 4.1.10.1
HUMAN ENGINEERING PROGRAM PLAN
E088 AFLCMC/WLNM DI-MGMT-82253A SOW Para 4.1.8.9
SOFTWARE BILL OF MATERIALS (SBOM)
E089 AFLCMC/WLNM DI-SESS-81785B/T SOW Para 4.1.3.4
SYSTEMS ENGINEERING MANAGEMENT PLAN (SEMP)
TCAS INTEGRATION PLAN
F001 AFLCMC/WLNM DI-MGMT-81468B SOW Para 3.4.2
CONTRACT FUNDS STATUS REPORT (CFSR)
F002 AFLCMC/WLNM DI-MGMT-81861C SOW Para 3.4.2
INTEGRATED PROGRAM MANAGEMENT DATA AND ANALYSIS
REPORT (IPMDAR)
EARNED VALUE MANAGEMENT (EVM)
L001 AFLCMC/WLNM TM-86-01R/T
4.3.1.3., 4.3.1.4., 5.2.1.3., 5.6.2., 5.7.1.
TECHNICAL MANUAL CONTRACT REQUIREMENTS (TMCR)
L002 AFLCMC/WLNM DI-MGMT-82273 SOW Para 3.6
DIMINISHING MANUFACTURING SOURCES AND MATERIAL
SHORTAGES (DMSMS) HEALTH ASSESSMENT REPORT
L003 AFLCMC/WLNM DI-MGMT-81949 SOW Paras 3.6, 3.6.1
DMSMS IMPLEMENTATION PLAN
L004 AFLCMC/WLNM DI-TMSS-80067C SOW Para 4.3.1.1
TECHINCAL MANUAL (TM) CONTRACTOR FURNISHED
AERONAUTICAL EQUIPMENT OR CONTRACTOR FURNISHED
EQUIPMENT (CFAE/CFE) NOTICE
L005 AFLCMC/WLNM DI-MGMT-81803A SOW Para 4.3.2
ITEM UNIQUE IFENDITFICATION (IUID) MARKING PLAN
L006 AFLCMC/WLNM DI-MGMT-81804A SOW Para 4.3.2
ITEM UNIQUE IFENDITFICATION (IUID) MARKING ACTIVITY,
VALIDATION AND VERIFICATION REPORT
L007 AFLCMC/WLNM DI-SESS-81759A/T SOW Para 4.3.3.2
LOGISTICS PRODUCT DATA SUMMARIES
SUPPORT EQUIPMENT (SE) RECOMMENDATION DATA
(SERD)/STANDARD
MODIFIED HAND TOOLS LIST (SMHTL)
L008 AFLCMC/WLNM DI-MGMT-80259/T SOW Para 4.3.5.1
PHYSICAL INVENTORIES REPORT
L009 AFLCMC/WLNM DI-MGMT-81238A SOW Para 4.1.1, 5.7.3
CONTRACT FIELD SERVICE REPORT
L010 AFLCMC/WLNM DI-SESS-81758A/T SOW Para 5.1.1
LOGISTICS PRODUCT DATA
RETROFIT KIT LISTING
L011 AFLCMC/WLNM DI-SESS-81874 SOW Para 4.3.3.1
ENGINEERING DATA FOR PROVISIONING (EDFP)
L012 AFLCMC/WLNM DI-SESS-81758A/T SOW Para 4.3.3.1
LOGISTICS PRODUCT DATA
PROVISIONING
L013 AFLCMC/WLNM DI-MGMT-82276 SOW Para 3.6.5
DMSMS OPERATIONS TRANSFER PLAN
L014 AFLCMC/WLNM DI-ILSS-80095/T SOW Paras 5.7.3, 5.7.4
INTEGRATED LOGISTICS SUPPORT PLAN (ILSP)
M001 AFLCMC/WLNM DI-ADMIN-81249C
3.1.3.4, 4.1.1.3, 4.1.7.2, 4.1.7.3, 4.1.10.2, 4.1.10.3, 4.4.9.2
CONFERENCE AGENDA
M002 AFLCMC/WLNM DI-ADMN-81250C/T
3.1.3.4, 4.1.1.3, 4.1.7.2, 4.1.7.3, 4.1.10.2, 4.1.10.3, 4.4.9.2
CONFERENCE MINUTES
M003 AFLCMC/WLNM DI-ADMN-81373/T 4.4.9.2
PRESENTATION MATERIAL
M004 AFLCMC/WLNM DI-MGMT-81797 SOW Para 3.1.1
PROGRAM MANAGEMENT PLAN
INTEGRATED MASTER PLAN (IMP)
M005 AFLCMC/WLNM DI-MGMT-81861C SOW Paras 3.1.1, 5.7.1.
INTEGRATED PROGRAM MANAGEMENT DATA AND ANALYSIS
REPORT (IPMDAR)
INTEGRATED MASTER SCHEDULE (IMS)
M006 AFLCMC/WLNM DI-MGMT-81808/T SOW Para 3.1.2
CONTRACTOR'S RISK MANAGEMENT PLAN
M007 AFLCMC/WLNM DI-MGMT-80368A/T SOW Para 3.1.4
STATUS REPORT
MONTHLY STATUS REPORT (MSR)
M008 AFLCMC/WLNM DI-MGMT-81642 SOW Para 3.1.5
SMALL BUSINESS SUBCONTRACTOR REPORT
M009 AFLCMC/WLNM DI-MGMT-81334D SOW Para 3.4.1
CONTRACT WORK BREAKDOWN STRUCTURE (CWBS)
T001 AFLCMC/WLNE DI-MISC-80508B/T SOW Para 4.4.1
TECHNICAL REPORT-STUDY/SERVICES
TRAINING SYSTEM REQUIREMENTS ANALYSIS
T002 AFLCMC/WLNE DI-MISC-81520B/T SOW Para 4.4.2.a
INSTRUCTIONAL MEDIA DESIGN PACKAGE
T003 AFLCMC/WLNE DI-ADMN-81373 SOW Paras 4.4.2.f, 4.4.3
PRESENTATION MATERIALS
AIRCREW TRAINING COURSEWARE
T004 AFLCMC/WLNE DI-PSSS-81522D/T SOW Para 4.4.2.g
COURSE CONDUCT INFORMATION PACKAGE
AIRCREW COURSE COMPLETION REPORT
T005 AFLCMC/WLNE DI-MISC-80508B/T SOW Para 4.4.5
TECHNICAL REPORT-STUDY/SERVICES
AIRCREW TRAINING SYSTEM (ATS) SEGMENT SPECIFICATIONS
T006 AFLCMC/WLNE DI-IPSC-81435B SOW Para 4.4.7
SOFTWARE DESIGN DESCRIPTION (SDD)
AIRCREW TRAINING SYSTEMS SDD
T007 AFLCMC/WLNE DI-IPSC-81436A/T SOW Para 4.4.7
INTERFACE DESIGN DESCRIPTION (IDD)
AIRCREW TRAINING SYSTEMS IDD
T008 AFLCMC/WLNE DI-IPSC-81441A/T SOW Para 4.4.7
SOFTWARE PRODUCT SPECIFICATION (SPS)
AIRCREW TRAINING SYSTEMS SPS
T009 AFLCMC/WLNE DI-IPSC-81442A/T SOW Para 4.4.7
SOFTWARE VERSION DESCRIPTION (SVD)
AIRCREW TRAINING SYSTEMS SVD
T010 AFLCMC/WLNE DI-SESS-80776B SOW Para 4.4.8
TECHNICAL DATA PACKAGE (TDP)
TRAINING DEVICES TDP
T011 AFLCMC/WLNE DI-SESS-81248B SOW Para 4.4.9
INTERFACE CONTROL DOCUMENT (ICD)
AIRCREW TRAINING SYSTEMS ICD
T012 AFLCMC/WLNE DI-MISC-80508B/T SOW Para 4.4.9.4
TECHNICAL REPORT-STUDY/SERVICES
TRAINING SYSTEM TEST PLAN (TSTP)
T013 AFLCMC/WLNE DI-PSSS-80134B SOW Paras 4.4.9.5, 5.8.7
PROPOSED SPARE PARTS LIST (PSPL)
AIRCREW TRAINING DEVICE PROPOSED SPARE PARTS LIST (PSPL)
V001 AFLCMC/WLNE DI-PSSS-81535B SOW Paras 4.1.2.1, 4.2.5.3
ACQUISITION AND SUSTAINMENT DATA PACKAGE (ASDP)
DEFICIENCY REPORT (DR)
V002 AFLCMC/WLNE DI-SESS-81704 SOW Para 4.2.2
TEST PLANS/TEST PROCEDURES
V003 AFLCMC/WLNE DI-QCIC-81536A/T SOW Para 4.2.2
TEST INFORMATION SHEETS (TIS)
V004 AFLCMC/WLNE DI-NDTI-80809B/T SOW Para 4.2.5.1
TEST/INSPECTION REPORT
QUICK LOOK REPORT
V005 AFLCMC/WLNE DI-NDTI-80809B SOW Paras 4.2.5.2, 4.2.5.3
TEST/INSPECTION REPORT
ENGINEERING VERIFICATION REPORT (EVR)
V006 AFLCMC/WLNM DI-NDTI-80809B/T SOW Para 4.2.5.3
TEST/INSPECTION REPORT
SYSTEM PROBLEM REPORT (SPR)
V007 AFLCMC/WLNE DI-QCIC-80553A SOW Para 4.2.10
ACCEPTANCE TEST PLAN
V008 AFLCMC/WLNM DI-QCIC-81891 SOW Para 5.4.3.1
ACCEPTANCE TEST REPORT (ATR)
V009 AFLCMC/WLNM DI-NDTI-80809B SOW Para 5.1.1
TEST/INSPECTION REPORT
ACCEPTANCE TEST REPORT FOR HARDWARE
PREVIOUS EDITION MAY BE USED.
DD FORM 1423, FEB 2024 Page 1 of 2
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
C001
2. TITLE OF DATA ITEM
Data Accession List (DAL)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81453C
5. CONTRACT REFERENCE
SOW 3.5.2
6. REQUIRING OFFICE
AFLCMC/WLN
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
QTRLY
11. AS OF DATE
As Req
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 4: Data Item Description (DID) is clarified as follows:
a. Paragraph 3.2 only applies to non-commercial technical data and non-commercial computer software.
For non-commercial technical data and non-commercial computer software requested Data Accession List (DAL) data, data rights assertions will be identified on the requested data and released in accordance with those restrictions.
b. Procuring Contracting Officer Letter (PCOL) requests for five (5) or less DAL data items shall be processed within five (5) working days after receipt. For PCOL requests for more than five (5) data items;
the response date, and impact, will be as agreed upon by the Government and the Contractor. Contractor responses to DAL requests will be submitted by a Contractor Letter to the Procuring Contracting Officer (PCO) as a non-CDRL submittal.
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.
Blocks 12 and 13:
a. First submittal shall be due no later than ninety (90) calendar days after Contract Award.
b. Quarterly submissions shall contain only new information created during the quarter, with complete reissue on every fourth quarter submission.
Block 14:
Per submittal.
AFLCMC/WLN 0 1 0
15.TOTAL 1
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
C-130H FPS Program Manager
J. SIGNATURE
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
C002
2. TITLE OF DATA ITEM
SUPPLIER'S CONFIGURATION MANAGEMENT PLAN (SCMP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80858D
5. CONTRACT REFERENCE
SOW 3.5.1.
6. REQUIRING OFFICE
AFLCMC/WLN
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
See Blk 16
11. AS OF DATE
As Req
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
As Req
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 4: The Data Item Description (DID) is clarified as follows:
Paragraph 2. Format.: The Supplier's Configuration Management Plan (SCMP) shall be submitted in electronic format.
Block 5: Specific requirements for SCMP, specified in Statement of Work (SOW) Paragraph 3.5.1 Configuration Management shall be included in the SCMP deliverable.
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.
For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson, AFB, OH.
Blocks 10 and 12:
a. First submittal shall be due no later than ninety (90) calendar days after Contract Award.
b. Subsequent submittals shall be due as significant updates are made, minor annual updates, or as directed during Government approval.
Block 14:
Per submittal.
AFLCMC/WLN 1 1 0
15.TOTAL 1 1
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Management
H. SIGNATURE I. APPROVED BY
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
C003
2. TITLE OF DATA ITEM
See Blk 16
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81454D
5. CONTRACT REFERENCE
SOW 3.5.1.
6. REQUIRING OFFICE
AFLCMC/WLN
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
See Blk 16
11. AS OF DATE
As Req
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
As Req
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 2: Title of Data Item: COMPUTER PROGRAM IDENTIFICATION NUMBER (CPIN)
CATALOG INFORMATION
Block 4: Data Item Description (DID) is clarified as follows:
Paragraph 2. Format.: AF IMT 1243 shall be submitted in electronic format.
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.
For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.
Blocks 10 and 12:
a. Draft submittals shall be due no later than Critical Design Review (CDR).
b. Final submittals shall be due no later than thirty (30) calendar days after Trial Kit Installation (TKI).
completion.
AFLCMC/WLN 1 1 0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER ADMN
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
C004
2. TITLE OF DATA ITEM
CONTRACT CHANGE PROPOSALS (CCPs)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81401C/T
5. CONTRACT REFERENCE
SOW 3.5.1
6. REQUIRING OFFICE
AFLCMC/WLNM
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
As Req
11. AS OF DATE
See Blk 16
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 4: Data Item Description (DID) is clarified as follows:
Paragraph 2. Format. The Contract Change Proposals (CCPs) shall be submitted in electronic format.
Block 4: DID is tailored as follows:
Paragraph 3.1. Control number and date of preparation: Contractor format is acceptable.
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
a. Approval shall be via the Government Configuration Control Board (CCB) decision.
b. Authorization will be provided by the Procuring Contracting Officer (PCO) in a Procuring Contracting Officer Letter (PCOL) or upon issuance of a contract modification.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson, AFB, OH.
Blocks 11, 12, and 13:
As required per individual CCP submittal.
Per submittal
AFLCMC/WLNM 1 1 0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
C005
2. TITLE OF DATA ITEM
REQUEST FOR VARIANCE (RFV)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80640E/T
5. CONTRACT REFERENCE
SOW 3.5.1
6. REQUIRING OFFICE
AFLCMC/WLNM
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
See Blk 16
11. AS OF DATE
As Req
12. DATE OF FIRST SUBMISSION
As Req
13. DATE OF SUBSEQUENT
SUBMISSION
As Req
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 4: Data Item Description (DID) is clarified as follows:
Paragraph 2a. DD Form 1694 shall be submitted in electronic format.
Block 4: DID is tailored as follows:
a. Paragraph 2a. DD Form 1694 Block 2 RFV Number: Contractor format acceptable.
b. Paragraphs 2b. and 2c.: Delete.
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
a. Approval shall be via the Government Configuration Control Board (CCB) decision.
b. Authorization will be provided by the Procuring Contracting Officer (PCO) by Procuring Contracting Officer Letter (PCOL) or upon issuance of a contract modification.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.
Blocks 10 and 12:
a. A final Request for Variance (RFV) submittal shall be required for every Engineering Change Proposal (ECP) submittal requiring a change to approved technical documentation and/or approved baseline configuration item(s).
b. A final RFV submittal with no scope changes shall be due no later than thirty (30) calendar days from receipt of the Government request.
c. A final RFV submittal with scope changes shall be due within a time frame mutually agreed.
Block 14:
Per submittal.
AFLCMC/WLNM 1 1 0
15.TOTAL 1 1
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
C006
2. TITLE OF DATA ITEM
ENGINEERING CHANGE PROPOSALS (ECP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80639E/T
5. CONTRACT REFERENCE
SOW 3.5.1; 3.6.3; 3.6.4; 5.7.1
6. REQUIRING OFFICE
AFLCMC/WLNM
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
See Blk 16
11. AS OF DATE
See Blk 16
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 4: Data Item Description (DID) is clarified as follows:
Paragraph 2a. DD Form 1692 shall be submitted in electronic format.
Block 4: DID is tailored as follows:
a. Paragraphs 2b. and 2c.: Delete.
b. Paragraph 3. Content. DD Form 1692:
Block 3. DODAAC: FA8625.
Block 8d. ECP NO.: Contractor Format Acceptable.
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
a. Approval shall be via the Government Configuration Control Board (CCB) decision.
b. Authorization will be provided by the Procuring Contracting Officer (PCO) in a Procuring Contracting Officer Letter (PCOL) or upon issuance of a contract modification.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson, AFB, OH.
Blocks 10, 11, 12, and 13:
As required per individual ECP submittal.
Block 14:
Per submittal.
AFLCMC/WLNE 1 1 0
AFLCMC/WLNC 1 1 0
AFLCMC/WLNM 1 1 0
15.TOTAL 3 3
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER PSSS
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
C007
2. TITLE OF DATA ITEM
SOFTWARE LICENSE REQUIREMENTS LIST (SLRL)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-PSSS-82046
5. CONTRACT REFERENCE
SOW 3.5.2.1
6. REQUIRING OFFICE
AFLCMC/WLNM
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
Annually
11. AS OF DATE
As Req
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
As Req
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.
For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright-Patterson, AFB, OH.
Block 12:
Submittal shall be due no later than thirty (30) calendar days following Government request and annually thereafter.
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
E001
2. TITLE OF DATA ITEM
SYSTEMS ENGINEERING MANAGEMENT PLAN (SEMP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81785B
5. CONTRACT REFERENCE
SOW 4.1.1.2, 4.1.3.6
6. REQUIRING OFFICE
AFLCMC/WLNM
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
See Blk 16
11. AS OF DATE
See Blk 16
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 5:
Requirements for Cybersecurity and system security requirements shall be identified, traceable and documented in the SEMP.
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.
For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within thirty (30) calendar days after notification of rejection, unless otherwise directed by the Government.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson, AFB, OH.
Blocks 10, 11, 12, and 13:
a. Draft submittal shall be due no later than thirty (30) calendar days prior to the System Requirements Review (SRR).
b. Final submittal shall be due no later than thirty (30) calendar days after receipt of Government comments.
Block 14:
Per submittal.
AFLCMC/WLNE 1 1 0
15.TOTAL 1 1
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER IPSC
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
E002
2. TITLE OF DATA ITEM
SYSTEM/SUBSYSTEM SPECIFICATION (S/SS)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81431A/T
5. CONTRACT REFERENCE
SOW 4.1.3.1
6. REQUIRING OFFICE
AFLCMC/WLNM
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
See Blk 16
11. AS OF DATE
As Req
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
As Req
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 4: The Data Item Description (DID) is clarified as follows:
Paragraph 3. Format.: The System/Subsystem Specification (SSS) shall be submitted in electronic format.
Block 4: DID is tailored as follows:
a. Paragraph 3. Format.: Delete "The CDRL...a traditional document."
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.
For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson, AFB, OH.
Blocks 10 and 12:
a. Draft submittal shall be due no later than sixty (60) calendar days after Contract Award.
b. Final submittal shall be due no later than thirty (30) calendar days prior to Critical Design Review
(CDR).
Block 14:
Per submittal.
AFLCMC/WLNE 1 1 0
15.TOTAL 1 1
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER IPSC
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
E003
2. TITLE OF DATA ITEM
SYSTEM/SUBSYSTEM DESIGN DESCRIPTION (SSDD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81432A
5. CONTRACT REFERENCE
SOW 4.1.3.1
6. REQUIRING OFFICE
AFLCMC/WLNM
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
See Blk 16
11. AS OF DATE
As Req
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
As Req
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 4: The Data Item Description (DID) is clarified as follows:
a. Paragraph 3. Format. Contractor format is acceptable.
b. Paragraph 3. Format. The System/Subsystem Design Description (SSDD) shall be submitted in electronic format.
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.
For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.
Blocks 10 and 12:
a. Draft submittal shall be due no later than thirty (30) calendar days prior to Preliminary Design Review (PDR) and Critical Design Review (CDR). (Note: SSSD summary presented in Microsoft (MS) Power Point for all reviews).
b. Final submittal shall be due no later than thirty (30) calendar days after Government approval.
AFLCMC/WLNC 1 1 0
15.TOTAL 2 2
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
C-130H Program Manager
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
E004
2. TITLE OF DATA ITEM
INTERFACE CONTROL DOCUMENT (ICD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81248B
5. CONTRACT REFERENCE
SOW 4.1.3.3
6. REQUIRING OFFICE
AFLCMC/WLNE
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
See Blk 16
11. AS OF DATE
As Req
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
As Req
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 4: Data Item Description (DID) is clarified as follows:
Paragraph 2. Format.: The Interface Control Document (ICD) shall be submitted in electronic format.
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.
For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.
Blocks 10 and 12:
a. Draft submittal shall be due no later than thirty (30) calendar days after Preliminary Design Review
(PDR).
b. Final submittal shall be due no later than sixty (60) calendar days after Critical Design Review (CDR).
AFLCMC/WLNE 1 1 0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
E005
2. TITLE OF DATA ITEM
See Blk 16
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-82380
5. CONTRACT REFERENCE
SOW 4.1.3.5
6. REQUIRING OFFICE
AFLCMC/WLNM
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
See Blk 16
11. AS OF DATE
See Blk 16
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
As Req
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 2: MODEL BASED SYSTEMS ENGINEERING (MBSE) DEVELOPMENT PLAN (MDP)
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.
For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.
Blocks 10, 11, and 12:
a. Draft submittal shall be due no later than thirty (30) calendar days prior to the System Requirements Review (SRR).
b. Final submittal shall be due no later than thirty (30) calendar days after receipt of Government comments.
Block 14:
Per submittal.
AFLCMC/WLNM 1 1 0
15.TOTAL 1 1
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
E006
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
STRESS AND LOAD ANALYSIS REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A
5. CONTRACT REFERENCE
SOW 4.1.3.7.1
6. REQUIRING OFFICE
AFLCMC/WLNM
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
See Blk 16
11. AS OF DATE
As Req
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
As Req
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 4: Data Item Description (DID) is clarified as follows:
a. Paragraph 10.2: The Stress and Load Analysis Report shall be submitted in electronic format.
b. Paragraph 10.2: Contractor format is acceptable.
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified. For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.
Blocks 10 and 12:
a. Draft submittal shall be due no later than thirty (30) calendar days after Preliminary Design Review
(PDR).
b. Final submittal shall be due no later than sixty (60) calendar days after Critical Design Review (CDR).
Block 14:
Per submittal.
AFLCMC/WLNM 1 1 0
15.TOTAL 1 1
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
E007
2. TITLE OF DATA ITEM
DURABILITY AND DAMAGE TOLERANCE (DADT) ANALYSIS
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81983
5. CONTRACT REFERENCE
SOW 4.1.3.7.2
6. REQUIRING OFFICE
AFLCMC/WLNM
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
See Blk 16
11. AS OF DATE
As Req
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
As Req
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 4: Data Item Description (DID) is clarified as follows:
a. Paragraph 2. Format. The Durability and Damage Tolerance (DADT) Analysis Report shall be submitted in electronic format.
b. Paragraph 3.e.: "... durability test findings, and service discrepancies." The final DADT Analysis Report shall be updated to account for design changes implemented during Trial Kit Installation (TKI), Verification Kit Installation (VKI), Low Rate Initial Production (LRIP), and Full Rate Production (FRP).
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.
For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.
Blocks 10 and 12:
a. Draft submittal shall be due no later than thirty (30) calendar days after Preliminary Design Review
(PDR).
b. Final submittal shall be due no later than sixty (60) calendar days after Critical Design Review (CDR).
Block 14:
Per submittal.
AFLCMC/WLNM 1 1 0
15.TOTAL 1 1
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
E008
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
ELECTRICAL LOAD ANALYSIS (ELA) REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A
5. CONTRACT REFERENCE
SOW 4.1.3.7.3
6. REQUIRING OFFICE
AFLCMC/WLNM
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
See Blk 16
11. AS OF DATE
As Req
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
As Req
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 4: Data Item Description (DID) is clarified as follows:
a. Paragraph 10.2: Contractor format is acceptable.
b. Paragraph 10.2: The Electrical Load Analysis (ELA) Report shall be submitted in electronic format.
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified. For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.
Blocks 10 and 12:
a. Draft submittal shall be due no later than thirty (30) calendar days prior to Preliminary Design Review (PDR) and Critical Design Review (CDR).
b. Final submittal shall be due no later than sixty (60) calendar days prior to Trial Kit Installation (TKI).
Block 14:
Per submittal.
AFLCMC/WLNM 1 1 0
15.TOTAL 1 1
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
E009
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
ANTENNA CO-SITE ANALYSIS REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A
5. CONTRACT REFERENCE
SOW 4.1.3.7.4
6. REQUIRING OFFICE
AFLCMC/WLNM
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
See Blk 16
11. AS OF DATE
As Req
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
As Req
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 4: Data Item Description (DID) is clarified as follows:
a. Paragraph 10.2: The Antenna Co-Site Analysis Report shall be submitted in electronic format.
b. Paragraph 10.2: Contractor format is acceptable.
Block 7:
One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified. For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.
Blocks 10 and 12:
a. Draft submittal shall be due no later than thirty (30) calendar days after Preliminary Design Review
(PDR).
b. Final submittal shall be due no later than thirty (30)) calendar days after Critical Design Review (CDR).
Block 14:
Per submittal.
AFLCMC/WLNM 1 1 0
15.TOTAL 1 1
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Configuration/Data Manager
H. SIGNATURE I. APPROVED BY
UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
C-130H FPS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
E010
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
ENVIRONMENTAL GAP ANALYSIS REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A
5. CONTRACT REFERENCE
SOW 4.1.3.7.5
6. REQUIRING OFFICE
AFLCMC/WLNM
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
See Blk 16
11. AS OF DATE
As Req
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
As Req
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block 4: Data Item Description (DID) is clarified as follows:
a. Paragraph 10.2: Contractor format is acceptable.
b. Paragraph 10.2: The Environmental Gap Analysis Report shall be submitted in electronic format.
Block 7 One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.
Block 8:
Approval is…
This is the start of the file's text. The full file is on GovTribe.