This is a Contract Data Requirements List (CDRL) package for the C-130H Formation Positioning System (FPS) Replacement Program, establishing 89 distinct data deliverables across multiple categories throughout the contract lifecycle. The CDRL specifies detailed requirements for technical documentation, software deliverables, test reports, logistics data, and program management materials, each with assigned data item numbers (C-series through V-series), required formats, approval authorities, distribution statements, and submission schedules tied to program milestones including System Requirements Review (SRR), Preliminary Design Review (PDR), Critical Design Review (CDR), First Flight Readiness Review (FFRR), and Physical Configuration Audit (PCA).

Key deliverable categories include systems engineering and design documentation (specifications, interface control documents, design descriptions), software development artifacts (software design descriptions, test plans, requirements specifications, version descriptions), reliability and maintainability analyses, safety and airworthiness assessments, electromagnetic compatibility and environmental testing data, human factors engineering documentation, cybersecurity and vulnerability assessments, manufacturing and quality assurance plans, logistics and sustainment data packages, training system requirements and courseware, and comprehensive program management reports including earned value management data and integrated master schedules. All deliverables require electronic submission in specified formats, with approval authority primarily vested in AFLCMC/WLNM (Air Force Life Cycle Management Center), distribution restricted to Department of Defense and DoD contractors under Distribution Statement D, and most draft submissions due 30-60 days prior to respective technical reviews with final submissions following approval or milestone completion. The CDRL applies to both Engineering and Manufacturing Development (EMD) and Production and Deployment (P&D) phases of the FPS replacement program for C-130H aircraft.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4/13/2026 CDRL Table of Contents C-130H FPS PROCUREMENT

CONTRACT #: TBD

CONTRACTOR: TBD

SET NAME: C-130H FPS Procurement SYSTEM ITEM: C-130H FORMATION

POSITIONING SYSTEM/

PROGRAM: C-130H FPS Replacement Program STATION KEEPING EQUIPMENT

(FPS/SKE)

DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH

C001 AFLCMC/WLN DI-MGMT-81453C SOW Para 3.5.2

DATA ACCESSION LIST (DAL)

C002 AFLCMC/WLN DI-SESS-80858D SOW Para 3.5.1

SUPPLIERS CONFIGURATION MANAGMENT PLAN (SCMP)

C003 AFLCMC/WLN DI-MISC-81454D SOW Para 3.5.1

COMPUTER PROGRAM IDENTIFICATION NUMBER (CPIN) CATALOG

INFORMATION

C004 AFLCMC/WLNM DI-ADMN-81401C/T SOW Para 3.5.1 CONTRACT CHANGE PROPOSALS (CCPs)

C005 AFLCMC/WLNM DI-SESS-80640E/T SOW Para 3.5.1

REQUEST FOR VARIANCE (RFV)

C006 AFLCMC/WLNM DI-SESS-80639E/T SOW Paras 3.5.1, 3.6.3, 3.6.4, 5.7.1

ENGINEERING CHANGE PROPOSALS (ECP)

C007 AFLCMC/WLNM DI-PSSS-82046 SOW Para 3.5.2.1

SOFTWARE LICENSE REQUIREMENTS LIST (SLRL)

E001 AFLCMC/WLNM DI-SESS-81785B SOW Paras 4.1.1.2, 4.1.3.6

SYSTEMS ENGINEERING MANAGEMENT PLAN (SEMP)

E002 AFLCMC/WLNM DI-IPSC-81431A/T SOW Para 4.1.3.1

SYSTEM/SUBSYSTEM SPECIFICATION (S/SS)

E003 AFLCMC/WLNM DI-IPSC-81432A SOW Para 4.1.3.1

SYSTEM/SUBSYSTEM DESIGN DESCRIPTION (SSDD)

E004 AFLCMC/WLNM DI-SESS-81248B SOW Para 4.1.3.3

INTERFACE CONTROL DOCUMENT (ICD)

E005 AFLCMC/WLNM DI-SESS-82380 SOW Para 4.1.3.5

MODEL BASED SYSTEMS ENGINEERING (MBSE) DEVELOPMENT

PLAN (MDP)

E006 AFLCMC/WLNM DI-MISC-80711A SOW Para 4.1.3.7.1

SCIENTIFIC AND TECHNICAL REPORTS

STRESS AND LOAD ANALYSIS REPORT

E007 AFLCMC/WLNM DI-SESS-81983 SOW Para 4.1.3.7.2

DURABILITY AND DAMAGE TOLERANCE (DADT) ANALYSIS

E008 AFLCMC/WLNM DI-MISC-80711A SOW Para 4.1.3.7.3

SCIENTIFIC AND TECHNICAL REPORTS

ELECTRICAL LOAD ANALYSIS (ELA) REPORT

E009 AFLCMC/WLNM DI-MISC-80711A SOW Para 4.1.3.7.4

SCIENTIFIC AND TECHNICAL REPORTS

ANTENNA CO-SITE ANALYSIS REPORT

E010 AFLCMC/WLNM DI-MISC-80711A SOW Para 4.1.3.7.5

SCIENTIFIC AND TECHNICAL REPORTS

ENVIRONMENTAL GAP ANALYSIS REPORT

DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH

E011 Deleted

E012 AFLCMC/WLNM DI-MISC-80711A SOW Para 4.1.3.7.7

SCIENTIFIC AND TECHNICAL REPORTS

THERMAL ANALYSIS REPORT

E013 AFLCMC/WLNM DI-IPSC-81427B SOW Para 4.1.4.1

SOFTWARE DEVELOPMENT PLAN (SDP)

E014 AFLCMC/WLNM DI-QCIC-81794A SOW Paras 4.1.4.1, 4.1.4.3, 4.1.5.2

QUALITY ASSURANCE PROGRAM PLAN (QAPP)

E015 AFLCMC/WLNM DI-IPSC-81442A/T SOW Para 4.1.4.2

SOFTWARE VERSION DESCRIPTION (SVD)

E016 AFLCMC/WLNM DI-IPSC-81433A/T SOW Paras 4.1.4.2, 4.1.4.3

SOFTWARE REQUIREMENTS SPECIFICATION (SRS)

E017 AFLCMC/WLNM DI-IPSC-81435B SOW Paras 4.1.4.2, 4.1.4.3

SOFTWARE DESIGN DESCRIPTION (SDD)

E018 AFLCMC/WLNM DI-IPSC-81438A/T SOW Para 4.1.4.2

SOFTWARE TEST PLAN (STP)

E019 AFLCMC/WLNM DI-IPSC-81439A/T SOW Para 4.1.4.2

SOFTWARE TEST DESCRIPTION (STD)

E020 AFLCMC/WLNM DI-IPSC-81440A/T SOW Para 4.1.4.2

SOFTWARE TEST REPORT (STR)

E021 AFLCMC/WLNM DI-IPSC-81434A/T SOW Para 4.1.4.2

INTERFACE REQUIREMENTS SPECIFICATION (IRS)

E022 AFLCMC/WLNM DI-IPSC-81441A/T SOW Para 4.1.4.2

SOFTWARE PRODUCT SPECIFICATION (SPS)

E023 AFLCMC/WLNM DI-QCIC-81795 SOW Para 4.1.4.3

SOFTWARE QUALITY ASSURANCE REPORT (SQAR)

E024 AFLCMC/WLNM DI-AVCS-80700A/T SOW Para 4.1.4.4

COMPUTER SOFTWARE PRODUCT END ITEM (CSPEI)

E025 AFLCMC/WLNM DI-MGMT-80004A/T SOW Para 4.1.5.1

MANAGEMENT PLAN

MANUFACTURING MANAGEMENT PLAN (MMP)

E026 Deleted

E027 AFLCMC/WLNM DI-SESS-81974 SOW Para 4.1.5.3

ASSESSMENT OF MANUFACTURING RISK AND READINESS

E028 AFLCMC/WLNM DI-MISC-80508B/T SOW Para 4.1.5.4

TECHNICAL REPORT - STUDY/SERVICES

QUALITY AND MANUFACTURING METRICS

E029 AFLCMC/WLNM DI-NDTI-81307A SOW Para 4.1.5.5

FIRST ARTICLE QUALIFICATION TEST PLAN AND PROCEDURES

E030 AFLCMC/WLNM DI-QCIC-80125B SOW Para 4.1.5.6

GIDEP ALERT/SAFE-ALERT REPORT

E031 AFLCMC/WLNM DI-QCIC-80126B SOW Para 4.1.5.6

GIDEP ALERT/SAFE-ALERT RESPONSE

E032 AFLCMC/WLNM DI-SESS-81613A SOW Para 4.1.6.1

RELIABILITY AND MAINTAINABILITY PROGRAM PLAN

E033 AFLCMC/WLNM DI-SESS-81497B SOW Para 4.1.6.2

RELIABILITY AND MAINTAINABILITY PREDICTIONS REPORT

E034 AFLCMC/WLNM DI-SESS-81496B SOW Para 4.1.6.3

RELIABILITY AND MAINTAINABILITY (R&M) BLOCK DIAGRAMS AND

MATHEMATICAL MODELS REPORT

E035 AFLCMC/WLNM DI-SESS-81495C SOW Para 4.1.6.4

FAILURE MODES, EFFECTS, AND CRITICALITY ANALYSIS (FMECA)

REPORT

REPORT

E036 AFLCMC/WLNM DI-SESS-80255B SOW Para 4.1.6.5

FAILURE SUMMARY AND ANALYSIS REPORT

E037 AFLCMC/WLNM DI-NDTI-80566A/T SOW Para 4.1.6.6

TEST PLAN

FAILURE MODES AND EFFECTS TESTING (FMET) TEST PLAN

E038 AFLCMC/WLNM DI-MISC-80508B/T SOW Para 4.1.6.6

TECHNICAL REPORT - STUDY/SERVICES

FAILURE MODES AND EFFECTS TESTING (FMET) TEST REPORT (TR)

E039 AFLCMC/WLNM DI-MISC-80508B/T SOW Para 4.1.6.8

TECHNICAL REPORT - STUDY/SERVICES

SAFETY CRITICAL FUNCTION THREAD ANALYSIS (SCFTA) REPORT

E040 AFLCMC/WLNE DI-MISC-80508B/T SOW Para 4.1.6.9

TECHNICAL REPORT – STUDY/SERVICES

SAFETY INTERLOCK ANALYSIS AND TEST (SIAT) REPORT

E041 AFLCMC/WLNE DI-SESS-81000F/T SOW Para 4.1.7.1

PRODUCT DRAWINGS AND ASSOCIATED LISTS

E042 AFLCMC/WLNM DI-MISC-80711A SOW Para 4.1.8.1.1

SCIENTIFIC AND TECHNICAL REPORTS

CRITICALITY ANALYSIS REPORT

E043 AFLCMC/WLNM DI-MISC-81832 SOW Para 4.1.8.2

COUNTERFEIT PREVENTION PLAN

E044 AFLCMC/WLNM DI-IPSC-82252A SOW Para 4.1.8.4

SOFTWARE VULNERABILITY ASSESSMENT REPORT (SVAR)

E045 AFLCMC/WLNM DI-MISC-80711A SOW Para 4.1.8.4

SCIENTIFIC AND TECHNICAL REPORTS

CYBERSECURITY ASSESSMENT REPORT

E046 AFLCMC/WLNM DI-MGMT-82191 SOW Para 4.1.8.4.1

CYBERSECURITY VULNERABILITY REPORT

E047 AFLCMC/WLNM DI-MGMT-81844/T SOW Para 4.1.8.4.2

INFORMATION ASSURANCE (IA) TEST PLAN

CYBERSECURITY TEST PLAN

E048 AFLCMC/WLNM DI-MGMT-81843/T SOW Para 4.1.8.4.2

INFORMATION ASSURANCE (IA) TEST REPORT

CYBERSECURITY TEST REPORT

E049 AFLCMC/WLNM DI-MGMT-82001A/T SOW 4.1.8.4.3

DoD Risk Management Framework (RMF) Package Deliverables

RMF DELIVERABLES

E050 AFLCMC/WLNM DI-MISC-80508B/T SOW Para 4.1.8.5

TECHNICAL REPORT - STUDY/SERVICES

SYSTEMS SECURITY WORKING GROUP (SSWG)

E051 AFLCMC/WLNM DI-EMCS-81827/T SOW Paras 4.1.8.6, 4.1.8.7

SPECTRUM CERTIFICATION SPECTRAL CHARACTERISTICS DATA

E052 AFLCMC/WLNM DI-MISC-80508B/T SOW Para 4.1.8.8

TECHNICAL REPORT - STUDY/SERVICES

COMMUNICATION, NAVIGATION, SURVEILLANCE/AIR TRAFFIC

MANAGEMENT (CNS/ATM) COMPLIANCE DATA

E053 AFLCMC/WLNM DI-MGMT-80004A/T SOW Para 4.1.9.1

MANAGEMENT PLAN

AIRWORTHINESS PLAN

E054 AFLCMC/WLNM DI-SESS-81766A SOW Para 4.1.9.2

AIRWORTHINESS CERTIFICATION BASIS

AIRWORTHINESS SPECIFICATION

E055 AFLCMC/WLNM DI-SESS-81768A SOW Para 4.1.9.2

AIRWORTHINESS COMPLIANCE REPORT

AIRWORTHINESS CERTIFICATION CRITERIA REPORT

E056 AFLCMC/WLNM DI-HFAC-80746C SOW Para 4.1.10.1

HUMAN ENGINEERING DESIGN APPROACH DOCUMENT

OPERATOR (HEDAD-O)

E057 AFLCMC/WLNM DI-MGMT-81398D SOW Para 4.1.11.1

HAZARDOUS MATERIALS MANAGEMENT PROGRAM PLAN

E058 AFLCMC/WLNM DI-MISC-81397D/T SOW Para 4.1.11.1

HAZARDOUS MATERIALS MANAGEMENT PROGRAM (HMMP)

REPORT

E059 AFLCMC/WLNM DI-SAFT-81626 SOW Para 4.1.11.2.1

SYSTEM SAFETY PROGRAM PLAN (SSPP)

E060 AFLCMC/WLNM DI-SAFT-80101C SOW Para 4.1.11.2.2

SYSTEM SAFETY HAZARD ANALYSIS REPORT (SSHAR)

FUNCTIONAL HAZARD ANALYSIS REPORT

E061 AFLCMC/WLNM DI-SAFT-80101C SOW Para 4.1.11.2.3

SYSTEM SAFETY HAZARD ANALYSIS REPORT (SSHAR)

SYSTEM SAFETY ASSESSMENT REPORT (SSAR)

E062 AFLCMC/WLNM DI-SESS-81770 SOW Para 4.1.12.1

SIL DEVELOPMENT AND MANAGEMENT PLAN

E063 AFLCMC/WLNM DI-SESS-81253E SOW Para 4.1.12.1

CONFIGURATION STATUS ACCOUNTING (CSA) INFORMATION

SIL CSA

E064 AFLCMC/WLNM DI-MSSM-81751 SOW Para 4.1.12.1

DOD M&S VERIFICATION AND VALIDATION (V&V) PLAN

E065 AFLCMC/WLNM DI-MSSM-81752 SOW Para 4.1.12.1

DOD M&S VERIFICATION AND VALIDATION REPORT

E066 AFLCMC/WLNM DI-EMCS-81540B/T SOW Para 4.1.13

E3 INTEGRATION AND ANALYSIS REPORT (E3IAR)

E067 AFLCMC/WLNM DI-EMCS-81541B SOW Para 4.1.13.1

E3 VERIFICATION PROCEDURES (E3VP)

E068 AFLCMC/WLNM DI-EMCS-81542B SOW Para 4.1.13.1

E3 VERIFICATION REPORT (E3VR)

E069 AFLCMC/WLNM DI-EMCS-80201C SOW Para 4.1.13.1

ELECTROMAGNETIC INTERFERENCE TEST PROCEDURES

E070 AFLCMC/WLNM DI-EMCS-80200C SOW Para 4.1.13.1

ELECTROMAGNETIC INTERFERENCE TEST REPORT (EMITR)

E071 AFLCMC/WLNE DI-SESS-81704 SOW Para 4.1.14

TEST PLANS/TEST PROCEDURES

ENVIRONMENTAL TEST PLANS/PROCEDURES

E072 AFLCMC/WLNM DI-QCIC-81890 SOW Para 4.1.14

QUALIFICATION TEST REPORT (QTR)

ENVIRONMENTAL QUALIFICATION TEST REPORT

E073 AFLCMC/WLNE DI-MGMT-81501A SOW Para 5.4.3.2

WEIGHT AND BALANCE REPORT FOR AIRCRAFT

E075 AFLCMC/WLNM DI-MISC-81356A/T SOW Para 5.6.4.1

CERTIFICATE OF COMPLIANCE

MEMORANDUM OF AIRWORTHINESS

E076 AFLCMC/WLNM DI-SESS-80255B SOW Para 5.6.5.3

FAILURE SUMMARY AND ANALYSIS REPORT

FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT (FACAR)

E077 AFLCMC/WLNM DI-MISC-80711A SOW Para 5.6.8.3

SCIENTIFIC AND TECHNICAL REPORTS

ARCHITECTURE ANALYSIS DATA

E078 AFLCMC/WLNM DI-IPSC-81429A/T SOW Para 5.6.9 SOFTWARE TRANSITION PLAN (STrP)

E079 AFLCMC/WLNM DI-IPSC-81428A/T SOW Para 5.6.9

SOFTWARE INSTALLATION PLAN (SIP)

E080 AFLCMC/WLNM DI-SESS-82364/T SOW Para 4.1.3.5

DIGITAL SYSTEM MODEL

E081 AFLCMC/WLNM DI-SESS-82045/T SOW Para 4.1.4.6

FIRMWARE DEVELOPMENT PLAN

E082 AFLCMC/WLNM DI-TMSS-80527D/T SOW Para 4.1.7.4

COMMERCIAL OFF-THE-SHELF (COTS) MANUALS AND

ASSOCIATED SUPPLEMENTAL DATA

E083 AFLCMC/WLNM DI-DRPR-81961C SOW Para 4.1.7.1

ACQUISITION AND SUSTAINMENT DATA PACKAGE (ADSP)

ENGINEERING DRAWING TREE

E084 AFLCMC/WLNM DI-MISC-80711A SOW Paras 3.2.1, 5.6.8.1

SCIENTIFIC AND TECHNICAL REPORTS

PROGRAM PROTECTION IMPLEMENTATION PLAN (PPIP)

E085 AFLCMC/WLNM DI-HFAC-81399B/T SOW Para 4.1.10.3

CRITICAL TASK ANALYSIS REPORT (CTAR)

E086 AFLCMC/WLNM DI-HFAC-80747C SOW Para 4.1.10.4

HUMAN ENGINEERING DESIGN APPROACH DOCUMENT

MAINTAINER (HEDAD-M)

E087 AFLCMC/WLNM DI-HFAC-81742B SOW Para 4.1.10.1

HUMAN ENGINEERING PROGRAM PLAN

E088 AFLCMC/WLNM DI-MGMT-82253A SOW Para 4.1.8.9

SOFTWARE BILL OF MATERIALS (SBOM)

E089 AFLCMC/WLNM DI-SESS-81785B/T SOW Para 4.1.3.4

SYSTEMS ENGINEERING MANAGEMENT PLAN (SEMP)

TCAS INTEGRATION PLAN

F001 AFLCMC/WLNM DI-MGMT-81468B SOW Para 3.4.2

CONTRACT FUNDS STATUS REPORT (CFSR)

F002 AFLCMC/WLNM DI-MGMT-81861C SOW Para 3.4.2

INTEGRATED PROGRAM MANAGEMENT DATA AND ANALYSIS

REPORT (IPMDAR)

EARNED VALUE MANAGEMENT (EVM)

L001 AFLCMC/WLNM TM-86-01R/T

4.3.1.3., 4.3.1.4., 5.2.1.3., 5.6.2., 5.7.1.

TECHNICAL MANUAL CONTRACT REQUIREMENTS (TMCR)

L002 AFLCMC/WLNM DI-MGMT-82273 SOW Para 3.6

DIMINISHING MANUFACTURING SOURCES AND MATERIAL

SHORTAGES (DMSMS) HEALTH ASSESSMENT REPORT

L003 AFLCMC/WLNM DI-MGMT-81949 SOW Paras 3.6, 3.6.1

DMSMS IMPLEMENTATION PLAN

L004 AFLCMC/WLNM DI-TMSS-80067C SOW Para 4.3.1.1

TECHINCAL MANUAL (TM) CONTRACTOR FURNISHED

AERONAUTICAL EQUIPMENT OR CONTRACTOR FURNISHED

EQUIPMENT (CFAE/CFE) NOTICE

L005 AFLCMC/WLNM DI-MGMT-81803A SOW Para 4.3.2

ITEM UNIQUE IFENDITFICATION (IUID) MARKING PLAN

L006 AFLCMC/WLNM DI-MGMT-81804A SOW Para 4.3.2

ITEM UNIQUE IFENDITFICATION (IUID) MARKING ACTIVITY,

VALIDATION AND VERIFICATION REPORT

L007 AFLCMC/WLNM DI-SESS-81759A/T SOW Para 4.3.3.2

LOGISTICS PRODUCT DATA SUMMARIES

SUPPORT EQUIPMENT (SE) RECOMMENDATION DATA

(SERD)/STANDARD

MODIFIED HAND TOOLS LIST (SMHTL)

L008 AFLCMC/WLNM DI-MGMT-80259/T SOW Para 4.3.5.1

PHYSICAL INVENTORIES REPORT

L009 AFLCMC/WLNM DI-MGMT-81238A SOW Para 4.1.1, 5.7.3

CONTRACT FIELD SERVICE REPORT

L010 AFLCMC/WLNM DI-SESS-81758A/T SOW Para 5.1.1

LOGISTICS PRODUCT DATA

RETROFIT KIT LISTING

L011 AFLCMC/WLNM DI-SESS-81874 SOW Para 4.3.3.1

ENGINEERING DATA FOR PROVISIONING (EDFP)

L012 AFLCMC/WLNM DI-SESS-81758A/T SOW Para 4.3.3.1

LOGISTICS PRODUCT DATA

PROVISIONING

L013 AFLCMC/WLNM DI-MGMT-82276 SOW Para 3.6.5

DMSMS OPERATIONS TRANSFER PLAN

L014 AFLCMC/WLNM DI-ILSS-80095/T SOW Paras 5.7.3, 5.7.4

INTEGRATED LOGISTICS SUPPORT PLAN (ILSP)

M001 AFLCMC/WLNM DI-ADMIN-81249C

3.1.3.4, 4.1.1.3, 4.1.7.2, 4.1.7.3, 4.1.10.2, 4.1.10.3, 4.4.9.2

CONFERENCE AGENDA

M002 AFLCMC/WLNM DI-ADMN-81250C/T

3.1.3.4, 4.1.1.3, 4.1.7.2, 4.1.7.3, 4.1.10.2, 4.1.10.3, 4.4.9.2

CONFERENCE MINUTES

M003 AFLCMC/WLNM DI-ADMN-81373/T 4.4.9.2

PRESENTATION MATERIAL

M004 AFLCMC/WLNM DI-MGMT-81797 SOW Para 3.1.1

PROGRAM MANAGEMENT PLAN

INTEGRATED MASTER PLAN (IMP)

M005 AFLCMC/WLNM DI-MGMT-81861C SOW Paras 3.1.1, 5.7.1.

INTEGRATED PROGRAM MANAGEMENT DATA AND ANALYSIS

REPORT (IPMDAR)

INTEGRATED MASTER SCHEDULE (IMS)

M006 AFLCMC/WLNM DI-MGMT-81808/T SOW Para 3.1.2

CONTRACTOR'S RISK MANAGEMENT PLAN

M007 AFLCMC/WLNM DI-MGMT-80368A/T SOW Para 3.1.4

STATUS REPORT

MONTHLY STATUS REPORT (MSR)

M008 AFLCMC/WLNM DI-MGMT-81642 SOW Para 3.1.5

SMALL BUSINESS SUBCONTRACTOR REPORT

M009 AFLCMC/WLNM DI-MGMT-81334D SOW Para 3.4.1

CONTRACT WORK BREAKDOWN STRUCTURE (CWBS)

T001 AFLCMC/WLNE DI-MISC-80508B/T SOW Para 4.4.1

TECHNICAL REPORT-STUDY/SERVICES

TRAINING SYSTEM REQUIREMENTS ANALYSIS

T002 AFLCMC/WLNE DI-MISC-81520B/T SOW Para 4.4.2.a

INSTRUCTIONAL MEDIA DESIGN PACKAGE

T003 AFLCMC/WLNE DI-ADMN-81373 SOW Paras 4.4.2.f, 4.4.3

PRESENTATION MATERIALS

AIRCREW TRAINING COURSEWARE

T004 AFLCMC/WLNE DI-PSSS-81522D/T SOW Para 4.4.2.g

COURSE CONDUCT INFORMATION PACKAGE

AIRCREW COURSE COMPLETION REPORT

T005 AFLCMC/WLNE DI-MISC-80508B/T SOW Para 4.4.5

TECHNICAL REPORT-STUDY/SERVICES

AIRCREW TRAINING SYSTEM (ATS) SEGMENT SPECIFICATIONS

T006 AFLCMC/WLNE DI-IPSC-81435B SOW Para 4.4.7

SOFTWARE DESIGN DESCRIPTION (SDD)

AIRCREW TRAINING SYSTEMS SDD

T007 AFLCMC/WLNE DI-IPSC-81436A/T SOW Para 4.4.7

INTERFACE DESIGN DESCRIPTION (IDD)

AIRCREW TRAINING SYSTEMS IDD

T008 AFLCMC/WLNE DI-IPSC-81441A/T SOW Para 4.4.7

SOFTWARE PRODUCT SPECIFICATION (SPS)

AIRCREW TRAINING SYSTEMS SPS

T009 AFLCMC/WLNE DI-IPSC-81442A/T SOW Para 4.4.7

SOFTWARE VERSION DESCRIPTION (SVD)

AIRCREW TRAINING SYSTEMS SVD

T010 AFLCMC/WLNE DI-SESS-80776B SOW Para 4.4.8

TECHNICAL DATA PACKAGE (TDP)

TRAINING DEVICES TDP

T011 AFLCMC/WLNE DI-SESS-81248B SOW Para 4.4.9

INTERFACE CONTROL DOCUMENT (ICD)

AIRCREW TRAINING SYSTEMS ICD

T012 AFLCMC/WLNE DI-MISC-80508B/T SOW Para 4.4.9.4

TECHNICAL REPORT-STUDY/SERVICES

TRAINING SYSTEM TEST PLAN (TSTP)

T013 AFLCMC/WLNE DI-PSSS-80134B SOW Paras 4.4.9.5, 5.8.7

PROPOSED SPARE PARTS LIST (PSPL)

AIRCREW TRAINING DEVICE PROPOSED SPARE PARTS LIST (PSPL)

V001 AFLCMC/WLNE DI-PSSS-81535B SOW Paras 4.1.2.1, 4.2.5.3

ACQUISITION AND SUSTAINMENT DATA PACKAGE (ASDP)

DEFICIENCY REPORT (DR)

V002 AFLCMC/WLNE DI-SESS-81704 SOW Para 4.2.2

TEST PLANS/TEST PROCEDURES

V003 AFLCMC/WLNE DI-QCIC-81536A/T SOW Para 4.2.2

TEST INFORMATION SHEETS (TIS)

V004 AFLCMC/WLNE DI-NDTI-80809B/T SOW Para 4.2.5.1

TEST/INSPECTION REPORT

QUICK LOOK REPORT

V005 AFLCMC/WLNE DI-NDTI-80809B SOW Paras 4.2.5.2, 4.2.5.3

TEST/INSPECTION REPORT

ENGINEERING VERIFICATION REPORT (EVR)

V006 AFLCMC/WLNM DI-NDTI-80809B/T SOW Para 4.2.5.3

TEST/INSPECTION REPORT

SYSTEM PROBLEM REPORT (SPR)

V007 AFLCMC/WLNE DI-QCIC-80553A SOW Para 4.2.10

ACCEPTANCE TEST PLAN

V008 AFLCMC/WLNM DI-QCIC-81891 SOW Para 5.4.3.1

ACCEPTANCE TEST REPORT (ATR)

V009 AFLCMC/WLNM DI-NDTI-80809B SOW Para 5.1.1

TEST/INSPECTION REPORT

ACCEPTANCE TEST REPORT FOR HARDWARE

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024 Page 1 of 2

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

C001

2. TITLE OF DATA ITEM

Data Accession List (DAL)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81453C

5. CONTRACT REFERENCE

SOW 3.5.2

6. REQUIRING OFFICE

AFLCMC/WLN

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

QTRLY

11. AS OF DATE

As Req

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) is clarified as follows:

a. Paragraph 3.2 only applies to non-commercial technical data and non-commercial computer software.

For non-commercial technical data and non-commercial computer software requested Data Accession List (DAL) data, data rights assertions will be identified on the requested data and released in accordance with those restrictions.

b. Procuring Contracting Officer Letter (PCOL) requests for five (5) or less DAL data items shall be processed within five (5) working days after receipt. For PCOL requests for more than five (5) data items;

the response date, and impact, will be as agreed upon by the Government and the Contractor. Contractor responses to DAL requests will be submitted by a Contractor Letter to the Procuring Contracting Officer (PCO) as a non-CDRL submittal.

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.

Blocks 12 and 13:

a. First submittal shall be due no later than ninety (90) calendar days after Contract Award.

b. Quarterly submissions shall contain only new information created during the quarter, with complete reissue on every fourth quarter submission.

Block 14:

Per submittal.

AFLCMC/WLN 0 1 0

15.TOTAL 1

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

C-130H FPS Program Manager

J. SIGNATURE

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

C002

2. TITLE OF DATA ITEM

SUPPLIER'S CONFIGURATION MANAGEMENT PLAN (SCMP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80858D

5. CONTRACT REFERENCE

SOW 3.5.1.

6. REQUIRING OFFICE

AFLCMC/WLN

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

See Blk 16

11. AS OF DATE

As Req

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

As Req

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: The Data Item Description (DID) is clarified as follows:

Paragraph 2. Format.: The Supplier's Configuration Management Plan (SCMP) shall be submitted in electronic format.

Block 5: Specific requirements for SCMP, specified in Statement of Work (SOW) Paragraph 3.5.1 Configuration Management shall be included in the SCMP deliverable.

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.

For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson, AFB, OH.

Blocks 10 and 12:

a. First submittal shall be due no later than ninety (90) calendar days after Contract Award.

b. Subsequent submittals shall be due as significant updates are made, minor annual updates, or as directed during Government approval.

Block 14:

Per submittal.

AFLCMC/WLN 1 1 0

15.TOTAL 1 1

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Management

H. SIGNATURE I. APPROVED BY

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

C003

2. TITLE OF DATA ITEM

See Blk 16

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81454D

5. CONTRACT REFERENCE

SOW 3.5.1.

6. REQUIRING OFFICE

AFLCMC/WLN

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

See Blk 16

11. AS OF DATE

As Req

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

As Req

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 2: Title of Data Item: COMPUTER PROGRAM IDENTIFICATION NUMBER (CPIN)

CATALOG INFORMATION

Block 4: Data Item Description (DID) is clarified as follows:

Paragraph 2. Format.: AF IMT 1243 shall be submitted in electronic format.

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.

For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.

Blocks 10 and 12:

a. Draft submittals shall be due no later than Critical Design Review (CDR).

b. Final submittals shall be due no later than thirty (30) calendar days after Trial Kit Installation (TKI).

completion.

AFLCMC/WLN 1 1 0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

C004

2. TITLE OF DATA ITEM

CONTRACT CHANGE PROPOSALS (CCPs)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81401C/T

5. CONTRACT REFERENCE

SOW 3.5.1

6. REQUIRING OFFICE

AFLCMC/WLNM

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

As Req

11. AS OF DATE

See Blk 16

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) is clarified as follows:

Paragraph 2. Format. The Contract Change Proposals (CCPs) shall be submitted in electronic format.

Block 4: DID is tailored as follows:

Paragraph 3.1. Control number and date of preparation: Contractor format is acceptable.

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

a. Approval shall be via the Government Configuration Control Board (CCB) decision.

b. Authorization will be provided by the Procuring Contracting Officer (PCO) in a Procuring Contracting Officer Letter (PCOL) or upon issuance of a contract modification.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson, AFB, OH.

Blocks 11, 12, and 13:

As required per individual CCP submittal.

Per submittal

AFLCMC/WLNM 1 1 0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

C005

2. TITLE OF DATA ITEM

REQUEST FOR VARIANCE (RFV)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80640E/T

5. CONTRACT REFERENCE

SOW 3.5.1

6. REQUIRING OFFICE

AFLCMC/WLNM

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

See Blk 16

11. AS OF DATE

As Req

12. DATE OF FIRST SUBMISSION

As Req

13. DATE OF SUBSEQUENT

SUBMISSION

As Req

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) is clarified as follows:

Paragraph 2a. DD Form 1694 shall be submitted in electronic format.

Block 4: DID is tailored as follows:

a. Paragraph 2a. DD Form 1694 Block 2 RFV Number: Contractor format acceptable.

b. Paragraphs 2b. and 2c.: Delete.

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

a. Approval shall be via the Government Configuration Control Board (CCB) decision.

b. Authorization will be provided by the Procuring Contracting Officer (PCO) by Procuring Contracting Officer Letter (PCOL) or upon issuance of a contract modification.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.

Blocks 10 and 12:

a. A final Request for Variance (RFV) submittal shall be required for every Engineering Change Proposal (ECP) submittal requiring a change to approved technical documentation and/or approved baseline configuration item(s).

b. A final RFV submittal with no scope changes shall be due no later than thirty (30) calendar days from receipt of the Government request.

c. A final RFV submittal with scope changes shall be due within a time frame mutually agreed.

Block 14:

Per submittal.

AFLCMC/WLNM 1 1 0

15.TOTAL 1 1

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

C006

2. TITLE OF DATA ITEM

ENGINEERING CHANGE PROPOSALS (ECP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80639E/T

5. CONTRACT REFERENCE

SOW 3.5.1; 3.6.3; 3.6.4; 5.7.1

6. REQUIRING OFFICE

AFLCMC/WLNM

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

See Blk 16

11. AS OF DATE

See Blk 16

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) is clarified as follows:

Paragraph 2a. DD Form 1692 shall be submitted in electronic format.

Block 4: DID is tailored as follows:

a. Paragraphs 2b. and 2c.: Delete.

b. Paragraph 3. Content. DD Form 1692:

Block 3. DODAAC: FA8625.

Block 8d. ECP NO.: Contractor Format Acceptable.

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

a. Approval shall be via the Government Configuration Control Board (CCB) decision.

b. Authorization will be provided by the Procuring Contracting Officer (PCO) in a Procuring Contracting Officer Letter (PCOL) or upon issuance of a contract modification.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson, AFB, OH.

Blocks 10, 11, 12, and 13:

As required per individual ECP submittal.

Block 14:

Per submittal.

AFLCMC/WLNE 1 1 0

AFLCMC/WLNC 1 1 0

AFLCMC/WLNM 1 1 0

15.TOTAL 3 3

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER PSSS

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

C007

2. TITLE OF DATA ITEM

SOFTWARE LICENSE REQUIREMENTS LIST (SLRL)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-PSSS-82046

5. CONTRACT REFERENCE

SOW 3.5.2.1

6. REQUIRING OFFICE

AFLCMC/WLNM

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

Annually

11. AS OF DATE

As Req

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

As Req

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.

For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright-Patterson, AFB, OH.

Block 12:

Submittal shall be due no later than thirty (30) calendar days following Government request and annually thereafter.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

E001

2. TITLE OF DATA ITEM

SYSTEMS ENGINEERING MANAGEMENT PLAN (SEMP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81785B

5. CONTRACT REFERENCE

SOW 4.1.1.2, 4.1.3.6

6. REQUIRING OFFICE

AFLCMC/WLNM

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

See Blk 16

11. AS OF DATE

See Blk 16

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 5:

Requirements for Cybersecurity and system security requirements shall be identified, traceable and documented in the SEMP.

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.

For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within thirty (30) calendar days after notification of rejection, unless otherwise directed by the Government.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson, AFB, OH.

Blocks 10, 11, 12, and 13:

a. Draft submittal shall be due no later than thirty (30) calendar days prior to the System Requirements Review (SRR).

b. Final submittal shall be due no later than thirty (30) calendar days after receipt of Government comments.

Block 14:

Per submittal.

AFLCMC/WLNE 1 1 0

15.TOTAL 1 1

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER IPSC

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

E002

2. TITLE OF DATA ITEM

SYSTEM/SUBSYSTEM SPECIFICATION (S/SS)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81431A/T

5. CONTRACT REFERENCE

SOW 4.1.3.1

6. REQUIRING OFFICE

AFLCMC/WLNM

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

See Blk 16

11. AS OF DATE

As Req

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

As Req

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: The Data Item Description (DID) is clarified as follows:

Paragraph 3. Format.: The System/Subsystem Specification (SSS) shall be submitted in electronic format.

Block 4: DID is tailored as follows:

a. Paragraph 3. Format.: Delete "The CDRL...a traditional document."

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.

For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson, AFB, OH.

Blocks 10 and 12:

a. Draft submittal shall be due no later than sixty (60) calendar days after Contract Award.

b. Final submittal shall be due no later than thirty (30) calendar days prior to Critical Design Review

(CDR).

Block 14:

Per submittal.

AFLCMC/WLNE 1 1 0

15.TOTAL 1 1

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER IPSC

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

E003

2. TITLE OF DATA ITEM

SYSTEM/SUBSYSTEM DESIGN DESCRIPTION (SSDD)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81432A

5. CONTRACT REFERENCE

SOW 4.1.3.1

6. REQUIRING OFFICE

AFLCMC/WLNM

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

See Blk 16

11. AS OF DATE

As Req

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

As Req

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: The Data Item Description (DID) is clarified as follows:

a. Paragraph 3. Format. Contractor format is acceptable.

b. Paragraph 3. Format. The System/Subsystem Design Description (SSDD) shall be submitted in electronic format.

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.

For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.

Blocks 10 and 12:

a. Draft submittal shall be due no later than thirty (30) calendar days prior to Preliminary Design Review (PDR) and Critical Design Review (CDR). (Note: SSSD summary presented in Microsoft (MS) Power Point for all reviews).

b. Final submittal shall be due no later than thirty (30) calendar days after Government approval.

AFLCMC/WLNC 1 1 0

15.TOTAL 2 2

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

C-130H Program Manager

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

E004

2. TITLE OF DATA ITEM

INTERFACE CONTROL DOCUMENT (ICD)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81248B

5. CONTRACT REFERENCE

SOW 4.1.3.3

6. REQUIRING OFFICE

AFLCMC/WLNE

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

See Blk 16

11. AS OF DATE

As Req

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

As Req

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) is clarified as follows:

Paragraph 2. Format.: The Interface Control Document (ICD) shall be submitted in electronic format.

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.

For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.

Blocks 10 and 12:

a. Draft submittal shall be due no later than thirty (30) calendar days after Preliminary Design Review

(PDR).

b. Final submittal shall be due no later than sixty (60) calendar days after Critical Design Review (CDR).

AFLCMC/WLNE 1 1 0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

E005

2. TITLE OF DATA ITEM

See Blk 16

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-82380

5. CONTRACT REFERENCE

SOW 4.1.3.5

6. REQUIRING OFFICE

AFLCMC/WLNM

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

See Blk 16

11. AS OF DATE

See Blk 16

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

As Req

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 2: MODEL BASED SYSTEMS ENGINEERING (MBSE) DEVELOPMENT PLAN (MDP)

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.

For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.

Blocks 10, 11, and 12:

a. Draft submittal shall be due no later than thirty (30) calendar days prior to the System Requirements Review (SRR).

b. Final submittal shall be due no later than thirty (30) calendar days after receipt of Government comments.

Block 14:

Per submittal.

AFLCMC/WLNM 1 1 0

15.TOTAL 1 1

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

E006

2. TITLE OF DATA ITEM

SCIENTIFIC AND TECHNICAL REPORTS

3. SUBTITLE

STRESS AND LOAD ANALYSIS REPORT

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80711A

5. CONTRACT REFERENCE

SOW 4.1.3.7.1

6. REQUIRING OFFICE

AFLCMC/WLNM

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

See Blk 16

11. AS OF DATE

As Req

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

As Req

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) is clarified as follows:

a. Paragraph 10.2: The Stress and Load Analysis Report shall be submitted in electronic format.

b. Paragraph 10.2: Contractor format is acceptable.

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified. For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.

Blocks 10 and 12:

a. Draft submittal shall be due no later than thirty (30) calendar days after Preliminary Design Review

(PDR).

b. Final submittal shall be due no later than sixty (60) calendar days after Critical Design Review (CDR).

Block 14:

Per submittal.

AFLCMC/WLNM 1 1 0

15.TOTAL 1 1

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

E007

2. TITLE OF DATA ITEM

DURABILITY AND DAMAGE TOLERANCE (DADT) ANALYSIS

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81983

5. CONTRACT REFERENCE

SOW 4.1.3.7.2

6. REQUIRING OFFICE

AFLCMC/WLNM

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

See Blk 16

11. AS OF DATE

As Req

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

As Req

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) is clarified as follows:

a. Paragraph 2. Format. The Durability and Damage Tolerance (DADT) Analysis Report shall be submitted in electronic format.

b. Paragraph 3.e.: "... durability test findings, and service discrepancies." The final DADT Analysis Report shall be updated to account for design changes implemented during Trial Kit Installation (TKI), Verification Kit Installation (VKI), Low Rate Initial Production (LRIP), and Full Rate Production (FRP).

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified.

For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.

Blocks 10 and 12:

a. Draft submittal shall be due no later than thirty (30) calendar days after Preliminary Design Review

(PDR).

b. Final submittal shall be due no later than sixty (60) calendar days after Critical Design Review (CDR).

Block 14:

Per submittal.

AFLCMC/WLNM 1 1 0

15.TOTAL 1 1

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

E008

2. TITLE OF DATA ITEM

SCIENTIFIC AND TECHNICAL REPORTS

3. SUBTITLE

ELECTRICAL LOAD ANALYSIS (ELA) REPORT

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80711A

5. CONTRACT REFERENCE

SOW 4.1.3.7.3

6. REQUIRING OFFICE

AFLCMC/WLNM

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

See Blk 16

11. AS OF DATE

As Req

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

As Req

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) is clarified as follows:

a. Paragraph 10.2: Contractor format is acceptable.

b. Paragraph 10.2: The Electrical Load Analysis (ELA) Report shall be submitted in electronic format.

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified. For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.

Blocks 10 and 12:

a. Draft submittal shall be due no later than thirty (30) calendar days prior to Preliminary Design Review (PDR) and Critical Design Review (CDR).

b. Final submittal shall be due no later than sixty (60) calendar days prior to Trial Kit Installation (TKI).

Block 14:

Per submittal.

AFLCMC/WLNM 1 1 0

15.TOTAL 1 1

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

E009

2. TITLE OF DATA ITEM

SCIENTIFIC AND TECHNICAL REPORTS

3. SUBTITLE

ANTENNA CO-SITE ANALYSIS REPORT

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80711A

5. CONTRACT REFERENCE

SOW 4.1.3.7.4

6. REQUIRING OFFICE

AFLCMC/WLNM

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

See Blk 16

11. AS OF DATE

As Req

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

As Req

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) is clarified as follows:

a. Paragraph 10.2: The Antenna Co-Site Analysis Report shall be submitted in electronic format.

b. Paragraph 10.2: Contractor format is acceptable.

Block 7:

One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

Approval is per Procuring Contracting Officer Letter (PCOL). The Government may provide comments to identify minor or administrative issues, but such comments need not be addressed/ incorporated until the next scheduled delivery. The Government will disapprove the deliverable if major issues are identified. For disapproved deliverables, the contractor shall submit a revision that resolves all issues, with changes highlighted, within ten (10) workdays after notification of rejection, unless otherwise directed by the Government.

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operational use (30 August 2024). Other requests shall be referred to Air Force Life Cycle Management Center (AFLCMC) C-130H Branch AFLCMC/WLNM Wright- Patterson AFB, OH.

Blocks 10 and 12:

a. Draft submittal shall be due no later than thirty (30) calendar days after Preliminary Design Review

(PDR).

b. Final submittal shall be due no later than thirty (30)) calendar days after Critical Design Review (CDR).

Block 14:

Per submittal.

AFLCMC/WLNM 1 1 0

15.TOTAL 1 1

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Configuration/Data Manager

H. SIGNATURE I. APPROVED BY

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM

C-130H FPS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

E010

2. TITLE OF DATA ITEM

SCIENTIFIC AND TECHNICAL REPORTS

3. SUBTITLE

ENVIRONMENTAL GAP ANALYSIS REPORT

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80711A

5. CONTRACT REFERENCE

SOW 4.1.3.7.5

6. REQUIRING OFFICE

AFLCMC/WLNM

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Blk 16

10. FREQUENCY

See Blk 16

11. AS OF DATE

As Req

12. DATE OF FIRST SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

As Req

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) is clarified as follows:

a. Paragraph 10.2: Contractor format is acceptable.

b. Paragraph 10.2: The Environmental Gap Analysis Report shall be submitted in electronic format.

Block 7 One (1) original signature of the transmittal letter shall be provided to AFLCMC/WLNK.

Block 8:

Approval is…