This document is a Contract Data Requirements List (CDRL) for Air Force Research Laboratory (AFRL) contract FA2396-26-C-XXXX, related to the BOOM LAB System. The contract is in draft status with the contractor to be determined (TBD). The CDRL specifies 14 data items (A001 through A014) that the contractor must deliver throughout the contract performance period.
The required deliverables include: Technical and Management Work Plan (due 30 days after award); Contract Funds Status Report (quarterly, first due 15 days after close of first monthly accounting period); Monthly Status Reports (first due 30 days after award, then 15 days after close of each month); Presentation Materials (5 days before scheduled meetings/reviews); Operations Security Plan (30 days after award); Security Plan (30 days after award); Meeting Minutes (7 days after each meeting); Final Report (30 days before end of each Period of Performance); Interface Control Document (15 days before Critical Design Review); As-Built Drawings (30 days before end of Period of Performance); System Acceptance Test Plan (30 days before Final Acceptance Test); System Safety Program Plan (60 days after award); Safety Assessment Report (15 days before Final Acceptance Test); and Government Property Inventory Report (30 days before end of Period of Performance, with Final Report). All deliverables require submission to AFRL/RRD in contractor-selected formats compatible with Microsoft Office or Adobe Acrobat. Distribution Statement D applies to all items, with one copy each of draft and final versions required for most deliverables.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Boom Lab Statement of Objectives (SOO).pdf | ||
| Request for Information (RFI) Boom Lab.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
CONTRACT #: FA2396 – 26-C-XXXX
CONTRACTOR: TBD
SET NAME: AFRL/ RRD - BOOM LAB SYSTEM ITEM:
PROGRAM: AFRL NEW RFP
DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH
A001 AFRL/RRD DI-MGMT-81117A/T PWS Para:
Technical and Management Work Plan
A002 AFRL/RRD DI-MGMT-81468B/T PWS Para:
Contract Funds Status Report
CFSR
A003 AFRL/RRD DI-MGMT-80368A /T PWS Para:
Status Report
MSR
A004 AFRL/RRD DI-ADMN-81373 PWS Para:
Presentation Material
N/A
A005 AFRL/RRD DI-MGMT-80934D/T PWS Para:
Operations Security (OPSEC)Plan
OPSEC
A006 AFRL/RRD DI-MISC-80711A PWS Para:
Scientific and Technical Reports
Security Plan
A007 AFRL/RRD DI-ADMN-81250C PWS Para:
MEETING MINUTES
N/A
A008 AFRL /RRD DI-MISC-80711A/T PWS Para:
Scientific and Technical Reports
Final Report
A009 AFRL/RDD DI-SESS-81248B PWS Para:
INTERFACE CONTROL DOCUMENT
ICD
A010 AFRL/RRD DI-MISC-81489B PWS Para:
REAL PROPERTY FACILITIES AS-BUILT DRAWINGS
As-Built Drawing
8/3/2026 2:09:26 PM EDT
CDRL Table of Contents
BOOM LAB v2
A011 AFRL/RRD DI-NDTI-80603A/T PWS Para:
Test Procedure
System Acceptance Test Plan
A012 AFRL/RRD DI-SAFT-81626 PWS Para:
SYSTEM SAFETY PROGRAM PLAN
( SSPP )
A013 AFRL/RRD DI-SAFT-80102D PWS Para:
SAFETY ASSESSMENT REPORT
SAR
A014 AFRL/RRD DI-MGMT-80441D PWS Para:
Government Property (GP) Inventory Report
GP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
FA2396 - 26
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Technical and Management Work Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81117A/T
5. CONTRACT REFERENCE
PWS Para:
6. REQUIRING OFFICE
AFRL/RRD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
OTIME
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Final
Reg Repro
16. REMARKS
BLK 4: This DID is tailored as follows; Format plan shall be submitted in a contractor devised and Government approved electronic format.
DELETE PARAs: 3.3, 3.4, 3.7, & 3.9.
BLKS: 10, 11, 12 & 13:
Submittal due within 30 calendar days after Contract Award.
AFRL/RRD 1 1 0
15. TOTAL 1 1 0
G. PREPARED BY
Harry Dorton Configuration Data Manager
H. DATE
2026/08/03
I. APPROVED BY
Brent Richburg Program Manager
J. DATE
2026/08/03
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 3 of 16 Pages
17. PRICE GROUP
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Contract Funds Status Report
3. SUBTITLE
CFSR
DI-MGMT-81468B/T
6. REQUIRING OFFICE
AFRL/RRD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
QTRLY
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLK 4: This DID is tailored as follows: Tailored to allow contractor's format. Tailored so that the report contains forecasts by month for the next six (6) months, by quarter for the remaining fiscal year, and by year for the remaining fiscal years. CFSR data shall be reconciled to the Governments fiscal year end at 30 September if the Contractors fiscal year end does not coincide with the Governments fiscal year end.
Microsoft Office or Adobe Acrobat compatibility in an agreed to format by Government.
BLKs 10, 11, 12 & 13:
First submission of CFSR is 15 calendar days from close of Contractors first full monthly accounting period. with subsequent Contractor CFSR delivered quarterly 15 days from the close of Contractors monthly accounting period to reconcile with Governments Fiscal Year Quarters, ie:
FYQ1 Close December - Deliver 15 January
FYQ2 Close March - Deliver 15 April
FYQ3 Close June - Deliver 15 July
FYQ4 Close September - Deliver 15 October
AFRL/RRD 1
15. TOTAL 0 1 0
Harry Dorton Configuration Data Manager
H. DATE
2026/08/03
I. APPROVED BY
Brent Richburg Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 4 of 16 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
MSR
DI-MGMT-80368A /T
6. REQUIRING OFFICE
AFRL/RRD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
MTHLY
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLK 4: This DID is Tailored as follows: Delete Para - 3.2.3.
Microsoft Office or Adobe Acrobat compatibility in an agreed to format acceptable by government.
BLKS 10, 11, 12 & 13:
The first submission shall be 30 calendar days following contract award. Subsequent submission shall be delivered 15 calendar days following the close of the Contractor’s monthly accounting period.
AFRL/RRD 0 1 0
Harry Dorton Configuration Data Manager
H. DATE
2026/08/03
I. APPROVED BY
Brent Richburg Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 5 of 16 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Presentation Material
3. SUBTITLE
N/A
DI-ADMN-81373
6. REQUIRING OFFICE
AFRL/RRD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLK 4: Tailored Contractors format acceptable.
Microsoft Office or Adobe Acrobat compatibility in an agreed to format acceptable by the Government.
BLKs 10, 11, 12 & 13:
Submission shall be Five (5) - calendar days prior to scheduled meeting or event. Meeting / event include but not limited to: Kick-off meeting, Preliminary designs reviews, critical design reviews, technical readiness reviews, etc.
AFRL / RRD 0 1 0
Harry Dorton Configuration Data Manager
H. DATE
2026/08/03
I. APPROVED BY
Brent Richburg Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 6 of 16 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Operations Security (OPSEC)Plan
3. SUBTITLE
OPSEC
DI-MGMT-80934D/T
6. REQUIRING OFFICE
AFRL/RRD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
OTIME
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLK 4: Tailored contractor’s format acceptable
Microsoft Office or Adobe Acrobat compatibility in an agreed to format acceptable by the government.
BLKs 10, 11, 12 & 13:
Submission of this deliverable shall be 30 calendar days following contract award.
Harry Dorton Configuration Data Manager
H. DATE
2026/08/03
I. APPROVED BY
Brent Richburg Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 7 of 16 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
Security Plan
DI-MISC-80711A
6. REQUIRING OFFICE
AFRL/RRD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
OTIME
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLK 4: Tailored to allow contractor’s Format format acceptable by the government.
BLKs 10, 11, 12 AND 13: Submission of this deliverable due 30 calendar days following contract award.
Harry Dorton Configuration Data Manager
H. DATE
2026/08/03
I. APPROVED BY
Brent Richburg Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 8 of 16 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
MEETING MINUTES
3. SUBTITLE
N/A
DI-ADMN-81250C
6. REQUIRING OFFICE
AFRL/RRD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLK 4: This DID is Tailored as follows: Contractor’s Format acceptable.
BLKs 10, 11, 12 & 13:
Submission shall be submitted seven calendar days following scheduled meeting or event. Meeting/event include, but no limited to: Kick-off meeting, Preliminary design reviews. Critical design reviews, technical readiness reviews, etc.
Harry Dorton Configuration Data Manager
H. DATE
2026/08/03
I. APPROVED BY
Brent Richburg Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 9 of 16 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
Final Report
DI-MISC-80711A/T
6. REQUIRING OFFICE
AFRL /RRD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
OTIME
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLK4: This DID is Tailored as follows:
Document format shall minimally conform to guidance described in the attached ANSI-based AFRL Format Guidelines. Include a completed Standard Form (SP) 298. If the Final Report contains data that is being delivered with less-than-unlimited rights, the data shall be appropriately marked within the Final Report.
Microsoft Office or Adobe Acrobat compatibility in an agreed format acceptable by the government.
NOTE: When the sensitivity of STINFO in draft and final deliverable documents meets the requirements of Controlled Unclassified Information (CUI) as dictated by EO 13556, “Controlled Unclassified Information,” contractors must properly mark pages of their submitted documents with the acronym “CUI” at the top and bottom of each page and include the CUI designation indicator on the title page.
-This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C App 2401 et seq.
Violations of these export laws are subject to server criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
BLOCKS 10, 11, 12 &13:
Submission of this deliverable will be based on each Period of Performance (PoP).
Base Period: Submission shall be delivered 30 calendar days prior to the end of the Base PoP. If option 1 is awarded, this submission shall be delivered 30 calendar days prior to the end of the Option 1 PoP. If Option 2 is awarded, this submission shall be delivered 30 calendar days prior to the end of the Option 2 PoP.
Harry Dorton Configuration Data Manager
H. DATE
2026/08/03
I. APPROVED BY
Brent Richburg Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 10 of 16 P
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
INTERFACE CONTROL DOCUMENT
3. SUBTITLE
ICD
DI-SESS-81248B
6. REQUIRING OFFICE
AFRL/RDD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLK 4: Contractor Format acceptable.
BLKs 10, 11, 12 & 13:
Submittal due 15 calendar days prior to Critical Design Review (CDR) date.
Harry Dorton Configuration Data Manager
H. DATE
2026/08/03
I. APPROVED BY
Brent Richburg Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 11 of 16
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
REAL PROPERTY FACILITIES AS-BUILT DRAWINGS
3. SUBTITLE
As-Built Drawing
DI-MISC-81489B
6. REQUIRING OFFICE
AFRL/RRD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLK 4: This DID is tailored as follows: DELETE Para's 2.b & 2.c.
BLKs: 10, 11, 12 & 13:
Submittal will be delivered 30 calendar days prior to the end of the Period of Performance- PoP, in conjunction with the Final Report.
Harry Dorton Configuration Data Manager
H. DATE
2026/08/03
I. APPROVED BY
Brent Richburg Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 12 of 16
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
System Acceptance Test Plan
DI-NDTI-80603A/T
6. REQUIRING OFFICE
AFRL/RRD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLK 4: Contractor's format acceptable.
BLKs: 10, 11, 12 & 13:
Delivery due 30 calendar days Prior to Final Acceptance Test.
AFRL/RRD 1 1
Harry Dorton Configuration Data Manager
H. DATE
2026/08/03
I. APPROVED BY
Brent Richburg Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 13 of 16
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
SYSTEM SAFETY PROGRAM PLAN
3. SUBTITLE
( SSPP )
DI-SAFT-81626
6. REQUIRING OFFICE
AFRL/RRD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLK 4: Contractors Format acceptable.
BLKs 10, 11, 12 & 13:
Initial delivery due 60 Calendar days after contract award.
Harry Dorton Configuration Data Manager
H. DATE
2026/08/03
I. APPROVED BY
Brent Richburg Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 14 of 16
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
SAFETY ASSESSMENT REPORT
3. SUBTITLE
SAR
DI-SAFT-80102D
6. REQUIRING OFFICE
AFRL/RRD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLK 4: This DID is tailored as follows:
Contractor format is acceptable.
BLKs 10, 12 & 13:
Initial delivery due15 Calendar days prior to Final Acceptance Test.
After Government approval, contractor shall submit subsequent updates to address contractor's proposed changes.
AFRL/RRD 1 1
Harry Dorton Configuration Data Manager
H. DATE
2026/08/03
I. APPROVED BY
Brent Richburg Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 15 of 16
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
Government Property (GP) Inventory Report
3. SUBTITLE
GP
DI-MGMT-80441D
6. REQUIRING OFFICE
AFRL/RRD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
OTIME
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLKs 10, 11, 12 & 13:
Report will be delivered in conjunction with the Final Report, 30 calendar days prior to the end of the Period of Performance (POP).
AFRL/RRD 1
Harry Dorton Configuration Data Manager
H. DATE
2026/08/03
I. APPROVED BY
Brent Richburg Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 16 of 16
File details come from the government source that posted it. Updated .