DRAFT CDRL - Actuator Test Stand.docx
DOCX document 67 KB Posted
- Solicitation number
- N68520-23-RFPREQ-613000K-0103
About this file
This document package includes a draft statement of work and contract data requirements list for the procurement of one depot-level rotary electro-mechanical actuator system. The Naval Air Systems Command intends to award a firm-fixed price contract to provide manufacture, testing, reliability inspection, and documentation services. The place of performance will be Fleet Readiness Center Southwest in Coronado, California, with an anticipated period of performance from September 2023 to September 2024. Interested parties should submit capability statements by February 15, 2023 highlighting relevant experience, technical skills, and past performance for similar efforts within the last five years. The statement of work and contract data requirements list specify requirements for acceptance testing, inspection reports, calibration certificates, parts lists, technical manuals, and program management documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Actuator Test Stand DRAFT SOW.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Contract Data Requirements List (DD 1423s)
Actuator Test Stand
FRCSW, Building 378
November 2022
CONTRACT DATA REQUIREMENTS LIST
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Actuator Test Stand |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A001 |
| Acceptance Test Plan |
| None |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-QCIC-80553A |
| SOW paragraphs 4.12, 4.14.2 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
SS
| A |
| OTIME |
5DATC
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
The Contractor shall submit the First Article Test (FAT) five (5) days after test completion at the source to the TPOC.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 11/02/2022 |
| William Fields |
| 11/02/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 2 |
| of |
| 7 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Actuator Test Stand |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A002 |
| Test/Inspection Report |
| None |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-NDTI-80809B |
| SOW paragraph 4.13.4 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
DD
| A |
| OTIME |
5DATC
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
The Contractor shall perform inspection at source and at destination.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 11/02/2022 |
| William Fields |
| 11/02/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 3 |
| of |
| 7 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Actuator Test Stand |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A003 |
| Calibration Certificate/Report |
| None |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-TMSS-81675 A |
| SOW paragraphs 4.14.7, 4.14.8 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| OTIME |
| EOC |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
The Contractor shall submit with the Calibration Certificate the certificates for the prescribed maintenance, software and operational training.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 11/02/2022 |
| William Fields |
| 11/02/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 4 |
| of |
| 7 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Actuator Test Stand |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A004 |
| Parts List |
| None |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-SESS-81359B |
| SOW paragraphs 4.14.8, 4.18.7, 4.14.9 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| OTIME |
| DFDEL |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
The Contractor shall submit a list of all parts that require calibration along with a complete list of all materials, chemicals, substances, and parts used for the calibration 120 days prior to equipment installation.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 11/02/2022 |
| William Fields |
| 11/02/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 5 |
| of |
| 7 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Actuator Test Stand |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A005 |
| Equipment Technical Manual (Sanitized) |
| None |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-TMSS-81675 |
| SOW paragraphs 4.14.4, 4.15.2, 4.17, 4.17.1, 4.18, 4.18.5, 4.18.6, 4.18.7 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| OTIME |
| DFDEL |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
The Contractor shall submit the COTS manuals forty-five (45) days after contract award.
The Contractor shall also include in this submittal the following:
· Test procedures
· As-built drawings, schematics
· Training materials
· Training manuals
· Maintenance manuals
· Calibration manuals
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 11/02/2022 |
| William Fields |
| 11/02/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 6 |
| of |
| 7 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Actuator Test Stand |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A006 |
| Major Milestone Commonality and Configuration |
| None |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-82022 |
| SOW paragraphs 5.0, 5.1, 5.2, 5.3 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| OTIME |
| DFDEL |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
The Contractor shall submit the POA&M forty-five (45) days after contract award.
The POA&M shall consist of:
· Milestones
· Program Scheduling
· Program Review (engineering documentation, system documentation, validation report, system user’s manuals, calibration procedures (if required), maintenance/corrective manuals, provisioning technical documents)
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 11/02/2022 |
| William Fields |
| 11/02/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 7 |
| of |
| 7 |
| Pages |
File details come from the government source that posted it. Updated .