DRAFT Attachments to RFP_IRES2_W912DY-21-R-0026_4MAY2021.pdf
PDF 2 MB Posted
- Attached to
- International Remediation Environmental Services - Generation Two (IRES2) Federal contract opportunity
- Solicitation number
- W912DY
About this file
This notice provides a draft request for proposal for the International Remediation Environmental Services - Generation Two (IRES2) multiple award task order contract. The U.S. Army Engineering and Support Center, Huntsville intends to award ID/IQ contracts to both large and small businesses with a total programmatic capacity of $750 million for services. Individual contract capacities will not be assigned. Task orders will be awarded as firm fixed price or cost-plus fixed fee. The base ordering period is thirty-six months with two twelve-month option periods. Contractors will perform military munitions response, environmental compliance and remediation, and other munitions-related services involving hazardous, toxic and radioactive waste, munitions constituents, and chemical and biological warfare materials to permit lands and waters to be safely used. Questions regarding the draft documents are due by May 11, 2021. The anticipated RFP issuance date is June 2021.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAFT Exhibit 4 IRES2 CDRL 3 of 3_4MAY2021.pdf | ||
| DRAFT Exhibit 4 IRES2 CDRL 2 of 3_4MAY2021.pdf | ||
| DRAFT Exhibit 4 IRES2 CDRL 1 of 3_4MAY2021.pdf | ||
| DRAFT RFP_IRES2_W912DY-21-R-0026_4MAY2021.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT ATTACHMENTS
A THROUGH G and
EXHIBITS 1, 2,3, 4 and 5
International Remediation and Environmental Services 2
Solicitation Number: W912DY-21-R-0026
Attachment A – Past Performance Questionnaire Attachment B – Project Experience Form Attachment C – Sample Task Order Attachment D – Sample Task Order Attachments Attachment E – Key Personnel Resume Attachment F – Letter of Commitment for Key Personnel Attachment G – Letter of Commitment for Key Subcontractors Exhibit 1 – HNC Data Item Description (HNC DIDS) Exhibit 2 – Performance Requirements Summary (PRS) Exhibit 3 – Quality Assurance Surveillance Plan (QASP) Exhibit 4 – Contract Data Requirements List (CDRLs) Exhibit 5 – Key Subs and Personnel
ATTACHMENT A
PAST PERFORMANCE RISK ASSESSMENT QUESTIONNAIRE
Please return this completed Questionnaire via e-mail to the Contract Specialist. Thank you for your assistance.
PAST PERFORMANCE QUESTIONNAIRE
Company/Agency Name Address Person Completing Survey Date Survey Completed Position Held in Reference to the Contract Length of Involvement in Contract Email Address Telephone Number Fax Number
Contractor Contract Title Contract Number Project Description Contract Type/Cost Award Date Original Contract Price Final Contract Price Explain Difference Percentage of Work Performed by Contractor Roles and Responsibilities as Sub or Prime
Expected Completion Date Actual Completion Date Explain Differences
DRAFT
(Presented for Information Only – Not to be completed by Offeror)
1. Quality of Work:
a) How was the contractor’s compliance with applicable safety standards to protect personnel and company/agency resources?
Unsatisfactory Marginal Satisfactory Very Good Excellent
b) How was the contractor’s compliance with applicable labor standards?
Unsatisfactory Marginal Satisfactory Very Good Excellent
c) Was the contractor’s effort in Quality Control successful in ensuring quality workmanship on your project?
Unsatisfactory Marginal Satisfactory Very Good Excellent
d) Was the contractor committed to customer satisfaction?
Unsatisfactory Marginal Satisfactory Very Good Excellent
e) Overall rating for Quality of Work
Unsatisfactory Marginal Satisfactory Very Good Excellent
2. Cost Controls:
a) Did the Contractor perform the required services at the contract price without adverse effect on performance?
Unsatisfactory Marginal Satisfactory Very Good Excellent
b) Did the contractor submit a fair and reasonable proposal when requested to perform additional work?
Unsatisfactory Marginal Satisfactory Very Good Excellent
c) If this contract is an indefinite delivery type contract (e.g., Multiple Award Environmental Contract, Task Order Contract, etc.), has the Contractor submitted competitive quotes on the individual orders issued under this contract?
Yes No N/A
d) Overall rating for Cost Controls
Unsatisfactory Marginal Satisfactory Very Good Excellent
3. Timeliness of Performance:
a) Was the contractor timely in submitting schedules, reports, billings and other contract submittals?
Always Usually Sometimes Never N/A
b) Was the contractor timely in responding to requests for proposals for additional work?
Always Usually Sometimes Never N/A
c) Did the contractor complete the contract on time taking into account all excusable delays?
Yes No N/A
d) Was the contractor assessed any liquidated damages or deductions for late or nonperformance of required work?
If yes, please explain.
Yes No
e) Did the contractor exceed contractual requirements in relation to Timeliness of Performance in a way that was deemed beneficial to your agency?
Yes No N/A
If you answered No, indicate your reason by checking one of the following:
Contractor met the requirements, but did not exceed them
Did not meet some of the requirements
Did not meet requirements and recovery is not likely
f) Overall rating for Timeliness of Performance
Unsatisfactory Marginal Satisfactory Very Good Excellent
4. Effectiveness of Management:
a) Did the contractor award subcontracts in a timely manner and properly manage them?
Always Usually Sometimes Never N/A
b) If applicable, did the contractor meet its small, small disadvantaged and women-owned business participation goals?
Yes No N/A
c) How would you rate the management of this firm as it relates to the completion of your contract and to the qualifications of its on-site personnel. Please explain.
Unsatisfactory Marginal Satisfactory Very Good Excellent
d) Describe the performance of the following personnel (if applicable)
1. Program Manger U M S VG E
2. Project Manager U M S VG E
3. Engineering/Technical U M S VG E
4. Quality Control Manager U M S VG E
5. Safety Officer U M S VG E
6. Superintendent U M S VG E
5. Customer Satisfaction:
a) Did the Contractor show reasonable and cooperative behavior and attention to customer satisfaction?
Yes No N/A
If you answered NO, please explain why:
6. Overall Rating of Contractor:
In summary, which of the following would you choose to best describe the overall quality of this firm’s past performance?
Unsatisfactory
Marginal
Satisfactory
Very Good
Excellent
7. Contact Information
Name of Person Completing Form
Position
Project Description
Role of Contractor
Phone No.
The information in this Questionnaire may be verified by Personnel from the U.S. Army Engineering and Support Center, Huntsville.
ATTACHMENT B
EXPERIENCE – PROJECT EXPERIENCE FORM
(May be modified/formatted as needed but offeror’s proposal shall contain at a minimum all the information below. This form is not included in the page count.)
SOLICITATION NO. W912DY-21-R-0026
Please provide a completed form for each project for which experience is being claimed (Offeror fills out this section).
Name of Offeror: __________________________________________________
Name of Project: __________________________________________________
Location of Project: ________________________________________________
Contract Number Project Performed Under: _______________________ Task Order Number: ________
Was the Project Firm-Fixed Price or Cost Reimbursable (including Time & Materials)?
Was the offeror the prime contractor or subcontractor? __________________________________________
Please explain primary role/duties performed as the prime or the subcontractor: ________________________
Brief Description of Project (Offeror can add attachment provided page count is not exceeded.)
Contract Amount at Award: _____________________________________________
Final Contract Amount: ________________________________________________
Amount added by Modification: _________________________________________
Explanation of any Cost Growth/Overruns: _____________________________________________________
Multiple Interim Schedule Milestones (to include scheduled start date): ___________________________
Original Contract Completion Date: ____________________________________
Final Contract Completion Date: _______________________________________
Actual Completion Date: ______________________________________________
Time added by Modification: ___________________________________________
Explanation of any Late Finish: _______________________________________________________________
Additional Project Information (Offeror can add attachment provided page count is not exceeded):
Was the project terminated early or were cure/show cause letters received? Yes No Explain early termination (default/convenience) or cure/show cause letters.
Safety record: ____ Accidents, ____ Incidents, ____Violations List and explain any customer concerns or dissatisfaction
What were the SDB, WOB and small business percent goals in the original contract, if any? N/A________SDB:______ WOB:
_____ Small Business: ______ HUBZONE: ______ SDVOSB: _______
What was the actual percent achieved at contract completion?
N/A______SDB: ______ WOB: _____ Small Business: _____ HUBZONE: ______ SDVOSB: _______
Was the project owner an agency of the federal government? Yes No
Name, address, email, and telephone number of the owner:
Name and telephone number of a representative of your firm who is knowledgeable of this project and can readily be contacted:
Name, address, email, and telephone number of a representative of the owner who is knowledgeable of this project and can be readily contacted:
Name, address, email, and telephone number of the Contracting Officer if project was for federal government:
_____________________________________________________________________________________________ DRAFT
ATTACHMENT C
IRES2 Sample Task Order
PERFORMANCE WORK STATEMENT
INTERNATIONAL REMEDIATION AND ENVIRONMENTAL SERVICES 2
February 1, 2021
1.0 PERFORMANCE OBJECTIVE. The objective of this Performance Work Statement (PWS) is for the Contractor under the International Remediation and Environmental Services 2 (IRES2) Multiple Award Task Order Contract (MATOC) to i) safely and efficiently conduct environmental footprint reduction operations and supporting activities throughout Afghanistan; ii) provide environmental support services to the U.S military throughout the Combined Joint Operational Area – Afghanistan (CJOA-A) for the establishment, sustainment, and closure of U.S. Military installations, forward operating bases, and other miscellaneous facilities throughout the CJOA-A; and iii) provide all Military Munitions Response Program (MMRP) services necessary to clear Munitions and Explosives of Concern (MEC) and Material Potentially Presenting an Explosive Hazard (MPPEH), to include munitions debris and range related debris from specified areas for the Muwaffaq Sulti Air Base (MSAB) Az Raq, Jordan.
2.0 INTRODUCTION AND GENERAL INFORMATION.
2.1 Site Locations. Information on the project locations is provided in Section 4.0 SPECIFIC TASKS.
2.2 Site Histories. Information on site history is provided in Section 4.0 SPECIFIC TASKS.
2.3 Chemical Warfare Materiel (CWM). The Contractor is not expected to encounter CWM at the project sites. However, during execution of this task order, if the Contractor identifies or suspects unknown liquid filled munitions, the Contractor shall perform the action specified by Section C, Paragraph 2.9 of the IRES2 Base Contract.
2.4 Improved Conventional Munitions/Sub-munitions (ICMs). ICMs may be encountered. If suspect ICM are encountered during any phase of site activities, the Contractor shall immediately take action to secure the area and contact the designated entity for disposition instructions. See also Section C, Paragraph 2.10 of the IRES2 Base Contract.
2.5 Quality Control.
2.5.1 Task Order Quality Management. The Contractor shall implement quality control (QC) processes as defined in a Quality Control Plan (QCP). The Contractor is responsible for ensuring that all work under the contract is of the quality that meets or exceeds contract requirements. The QCP shall be detailed and comprehensive and shall cover all aspects of the task order activities impacting quality of deliverables and services. The Contractor’s QCP shall be included in the Work Plan (WP) and be written IAW DID HNC-015.00. The Contractor shall ensure that QC documentation is maintained and provided in the Site Specific Final Report (SSFR).
2.5.2 Quality Assurance. The Government will perform quality assurance (QA) of the Contractor's performance under this task order using the method of surveillance specified in the Quality Assurance Surveillance Plan (QASP). The specific surveillance tasks performed under the surveillance plan will be defined following acceptance of the QCP. The Government reserves the right to modify the surveillance tasks in the QASP at any time. The Government reserves the right to perform QA inspections at any time. QA failure can be defined as workmanship or work products not complying with the WP Addendum, PWS, or not meeting project needs and/or objectives. Failure can also be defined as workmanship not complying with basic safety concepts and other industry safety practices. If any government QA review identifies a process failure or a work product failure, the Contractor will be issued a Corrective Action Request (CAR) or an Engineer Form 6048. The Contractor shall provide full documentation detailing the root cause of the failure, why it was not detected in the Contractor’s QC Program, and how the problem was corrected.
2.6 Performance Period. The period of performance of this task order will be comprised of a base performance period defined as 12 months (commencing upon task order award) or to termination of this task order, whichever occurs earlier, and three option years. It will be understood that any optional tasks beyond the base tasks will be exercised at the sole discretion of the Government, and as authorized by the KO.
2.7 Basis of Estimate. The Offeror shall provide a Basis of Estimate (BOE) in the technical volume of the proposal (Excel spreadsheet format preferred). The BOE is to include quantification of all resources required for the completion of each task/subtask. For example, information such as (but not limited to): number of teams, team size and make up, labor productivity/duration, labor hours, labor categories, equipment, materials, subcontractors and their level of effort (i.e. no lump quantities), number of meetings, etc. should be included.
2.8 General Conditions. See Section C, Paragraph 3.2 and subparagraphs of the Base Contract regarding pre-award site visits and General Conditions for task order proposals. The Contractor will be provided a MEC reconnaissance survey report for the sites as discussed above. See Paragraph 10.4 of Base Contract regarding Government provided data.
3.0 GENERAL REQUIREMENTS.
3.1 Performance Requirements Summary. This PWS serves to delineate desired outcomes and associated requirements for this task order. Inherent to performance-based work is the establishment of measurable performance standards.
Accordingly, PWS Attachment 1 - Performance Requirements Summary for Performance Assessment Record (PAR) summarizes specific performance objectives, standards and acceptable quality levels (AQL), monitoring methods and contractor incentives and disincentives for work of this PWS.
3.2 In-theater Coordination. The Contractor shall coordinate all activities with the CEHNC Project Manager (PM) and the in-theater designated authority(s) at the project site locations. The Contractor shall coordinate all aspects of work to be performed (i.e., work schedules, disposal activities, etc.) with the project location and in-theater designated authority(s), as applicable.
3.3 Country Entrance Requirements. The Contractor should confirm country entrance requirements for personnel and equipment, particularly the obtainment of Visa’s and lead time for such.
3.4 Laws and Regulation Compliance. The Contractor shall comply with all in theater regulations, clauses, and directives including U.S. and host nation agreements such as Status of Forces Agreement (SOFA), etc., as applicable. U.S. Central Command (CENTCOM) Clauses are included in Attachment 2.
3.5 CONUS Replacement Center (CRC). Contractor U.S. personnel newly deploying for work under this task order shall be required to in-process at the CRC located at Fort Bliss, Texas prior to deployment. Other Country Nationals (OCNs) do not have to attend the CRC prior to deployment to the project site and may deploy immediately. Permanent U.S.
employee departure from the OCONUS location, whether from completion of work or otherwise, shall require out processing through the CRC. All costs associated with CRC, medical procedures/requirements, travel from home of record to the project location and/or travel back to the home of record shall be included in all mobilization and demobilization costs. The KO will provide a Letter of Authorization (LOA) to Contractor personnel validating their contractual employment and authority to proceed to the CRC for processing. The Contractor shall coordinate directly with the CRC to schedule attendance. Presently Contractor personnel must process through the CRC as specified above;
however, if during the period of performance of this task order alternative deployment center(s) are available, a request may be sent to the KO for pre-approval, but attendance at the alternate deployment center would be at no additional cost to the Government. Processing at the CRC includes, but is not limited to, the following:
- Common Access Card (CAC) issuance.
- Meeting all applicable physical/medical/dental readiness requirements.
- Approval of all CONTRACTOR furnished personal protective equipment/individual protective equipment and gear.
3.6 Permits and Licenses. The Contractor is ultimately responsible for obtaining all required permits and licenses to complete the project in accordance with (IAW) the IRES2 Base Contract.
3.7 Antiterrorism/Operational Security (AT/OPSEC) Requirements. The Contractor shall comply with the following AT/OPSEC related requirements for work of this task order:
3.7.1 (AT/OPSEC #1) AT Level I Training. All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after task order start date or effective date of incorporation of this requirement into the task order, whichever is applicable. Upon request, the Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the Contracting Officer (KO) or KO’s Representative (COR), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the requiring activity (RA) organizational Antiterrorism Officer (ATO) in presentation form which will be documented via memorandum.
3.7.2 (AT/OPSEC #2) Access and General Protection/Security Policy and Procedures. All Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.
3.7.2.1 (AT/OPSEC #2a) For Contractors requiring a CAC. The contractor and all sub-contractors employees will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an interim CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
3.7.2.2 (AT/OPSEC #2b) For contractors who do not require CAC, but require access to a DoD facility or installation.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
3.7.3 (AT/OPSEC #3) AT Training for Contractor Personnel Traveling Overseas. All US based Contractor employees and associated sub-contractor employees traveling overseas will receive the Government provided AOR specific AT awareness training. The documentation of training completion must be provided to the COR prior to departure.
3.7.4 (AT/OPSEC #4) Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The Contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the PM, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
3.7.5 (AT/OPSEC #5) Contractor Employees Who Require Access to Government Information Systems. All contractor employees with access to a government info system must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the information systems and then annually thereafter in accordance with personnel security standards listed in AR 25-2 (Information Assurance), an appropriate background investigation will be conducted prior to accessing the government information systems.
3.7.6 (AT/OPSEC #6) For Contracts that Require an OPSEC Standing Operating Procedure/Plan. Not Applicable.
3.7.7 (AT/OPSEC #7) For Contracts that Require OPSEC Training. All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the KO or COR within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
3.7.8 (AT/OPSEC #8) For Information assurance (IA)/information technology (IT) training. Not Applicable.
3.7.9 (AT/OPSEC #9) For IA/IT certification. Not Applicable.
3.7.10 (AT/OPSEC #10) For Contractors Authorized to Accompany the Force. All contractor employees shall ensure the following AT/OPSEC requirements are met prior to deploying personnel authorized to accompany U.S. Armed Forces outside the United States; to include compliance with laws, regulations, pre-deployment requirements, and required training in accordance with combatant command guidance.
3.7.11 (AT/OPSEC #11) Performance or Delivery in a Foreign Country. All non-local contracting personnel shall comply with theater clearance requirements and allow the combatant commander to exercise oversight to ensure the Contractor's compliance with combatant commander and subordinate task force commander policies and directives.
3.7.12 (AT/OPSEC #12) For Contracts That Require Handling or Access to Classified Information. Not Applicable.
3.7.13 (AT/OPSEC #13) Will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas. Not Applicable.
3.7.14 (AT/OPSEC #14) (FOR CLASSIFIED CONTRACTS ONLY) Contractor Company to obtain a Facility Clearance and individual clearances at the appropriate level. Not Applicable.
3.7.15 (AT/OPSEC #15) Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 30 business days after the initial task order award.
3.7.16 (AT/OPSEC #16) For contract requiring armed security guards. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility policies and procedures on storing weapons and ammunition IAW AR 190-11 (provided by government representative).
3.7.17 (AT/OPSEC #17) Threat Awareness Reporting Program. All new contractor employees will complete annual Threat Awareness and Reporting Program (TARP) Training provided by a Counterintelligence Agent, IAW AR 381-12 .
The contractor shall submit certificates of completion for each affected contractor and subcontractor employee(s) or a memorandum for the record, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. Authorized web based TARP training for CAC card holders is available at the following website: https://www.us.army.mil/suite/page/655474.
3.8 Additional Training.
3.8.1 Suspicious Activity Reporting Training. The Contractor personnel shall receive a brief/training on the local suspicious activity reporting program. This locally developed training be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the Government PM, COR, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
3.8.2 Information Assurance (IA)/Information Technology (IT) Training: All Contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All Contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25- 2 within six months of employment.
3.9 Access.
3.9.1 Access and General Protection/Security Policy and Procedures: All Contractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in CONTRA Contractor CTOR security matters or processes.
3.9.2 Access to Government Information Systems: All Contractor employees with access to a government info system must successfully complete the DOD Information Assurance Awareness prior to access to the information systems and then annually thereafter in accordance with personnel security standards listed in AR 25-2 (Information Assurance), an appropriate background investigation will be conducted prior to accessing the government information systems.
3.10 Contractor Acquired Property (CAP). No CAP or Government Furnished Property (GFP) is initially anticipated to be provided to the Contractor; however, the Contractor may be required to purchase property to complete work under this task order that could become CAP. The Contractor shall be responsible for CAP accordingly. The Contractor shall establish and maintain an acceptable Property Management System for the purpose of managing CAP.
4.0 SPECIFIC TASKS.
4.1 TASK 1: ENVIRONMENTAL FOOTPRINT REDUCTION (EFR). This is a Firm Fixed Price (FFP), Cost-Plus Fixed Fee (CPFF), and Cost task.
4.1.0 Subtasks Breakdown. Task 1 is broken into the following subtasks:
Task 1.1 Work Plan (WP) and Accident Prevention Plan (APP), FFP.
Task 1.2 Property Management Plan (PMP), FFP.
Task 1.3 Site Specific Security Plan (SSSP), FFP.
Task 1.4 Mobilization/Demobilization Plan, FFP.
Task 1.5 EFR Team Operations Services (96 units), FFP per team-month.
Task 1.6 Personnel Mobilization, FFP Task 1.6.1 US Personnel Mobilization (1 unit), FFP.
Task 1.6.2 US Personnel Mobilization within Afghanistan (1 unit), FFP.
Task 1.6.3 OCN Personnel Mobilization (1 unit), FFP.
Task 1.6.4 OCN Personnel Mobilization within Afghanistan (1 unit), FFP.
Task 1.7 Personnel Demobilization, FFP.
Task 1.7.1 US Personnel Demobilization (1 unit), FFP.
Task 1.7.2 OCN Personnel Demobilization (1 unit), FFP.
Task 1.8 EFR Logistics and Additional Support, CPFF.
Task 1.9 SSFR, FFP.
Task 1.10 Project Management (12 units), FFP per month.
Task 1.11 Army Contractor Manpower Reporting, FFP.
Task 1.12 Defense Base Act Insurance and Reporting, Cost.
4.1.1 Performance Objective. The objective of Task 1 is for the Contractor to safely and efficiently conduct EFR operations and supporting activities throughout Afghanistan.
4.1.2 General Information.
4.1.2.1 As a result of the drawdown of military operations in Afghanistan a number of camps and bases throughout Afghanistan require downsizing and EFR. Additionally, the U.S. military has closed up to 700 facilities to date; however, many of the closures occurred without the disposing of the camp or base environmental footprint. The primary objective of Task 1 is for the Contractor to reduce the environmental footprint of specific facilities within Afghanistan as authorized by the KO. EFR may include, but shall not be limited to, the demilitarization of relocate-able buildings (RLB), Tension Fabric Structures (TFS), T-wall barriers, Hercules Engineering Solutions Consortium (HESCO) barriers, miscellaneous concrete and/or steel structures, and other regulated materials (ORM) (which may consist of black-water lagoons, petroleum products, petroleum tanks and tank farms, paints, burn pits, etc.). The Contractor may be required to consolidate, transport, or relocate facilities or items listed above. The Contractor shall dispose of all debris materials as necessary. Since originally constructed, the facilities have likely been modified several times. The description and condition of facilities will differ from camp-to-camp due to the nature of how the facilities were constructed and used.
4.1.2.1 Site Locations. The locations requiring environmental footprint reduction may be throughout Afghanistan in and around FOBs. Specific locations shall be as determined by the KO.
4.1.2.2 EFR Teams. It is envisioned that the Contractor would most efficiently and safely perform fieldwork (i.e., EFR operations and supporting activities) via EFR teams similar in size to a military platoon element, approximately 30 personnel, which includes Contractor provided security, medic, and safety personnel. The Contractor will receive task guidance in the form of work order requests from the various customers forward including USAFOR-A. The work order request will flow to through the Government PDT to be reviewed for appropriateness and for prioritization, and to the Contractor for execution. The Contractor shall then execute the requirement void of Government involvement other than QA inspections. The Contractor shall have the capability to decrease or increase the number of teams as dictated by the operational tempo (OPTEMPO), during the execution of Task 1, as authorized by the KO.
4.1.2.3 Potential for Explosive Remnants of War (ERW) and MEC Contamination. Many camp and base facilities constructed in Afghanistan to support military operations were constructed under high threat conditions without full consideration for MEC contamination at the locations. As a result, explosive remnants of war (ERW) including unexploded ordnance (UXO) as well as munitions debris (MD) may exist within the facility boundaries; however, any MEC to be encountered should be considered incidental to the EFR process. That is, the primary intent of EFR is not Battle Area Clearances or demining; however, the Contractor must be able to operate in potentially MEC contaminated areas. Normally, when they are available, Explosive Ordnance Disposal (EOD) assets will be used to dispose of MEC and ERW items that are encountered; however, the Contractor may be directed to dispose of MEC and ERW encountered should disposal by EOD not be possible. The potential for MEC contamination may vary tremendously from location to location, and within a single location itself. For example, MEC contamination within HESCO barriers or constructed berms may be significantly higher than surrounding areas, particularly those that have been inhabited and used over the years. Additionally, many facilities that have been in place for many years during ongoing military operations in Afghanistan have over time have taken indirect fire (IDF). The types of MEC that may be encountered also varies, most of which originating from previous training, but some from the Russian-Afghani War and other conflicts that have taken place in the region. Due to the history of the region encountering incidental landmines or ICM submunitions cannot be discounted; to date, no MEC have been encountered since EFR began in 2013. In summary, many facilities could still contain explosive hazards through primarily through UXO (a form of MEC) contamination.
4.1.2.4 Differential Premiums. All personnel in theater will receive danger and post differential premiums. Contractor proposed firm fixed prices shall account for all such pay. Labor not performed in theater shall not include these premiums. Post differential pay commences after 42 consecutive days in theater, and is retroactive. Local hire employees or local sub-contract employees will not qualify for pay premiums. The Contractor shall submit a salary pay scale that includes regular, overtime and all premium pay. The salary rate will be based on one year (365 days) and will be prorated for any part of a year worked. The use of a salary pay scale will eliminate the need to keep track of hours worked. The salary rate shall be clearly broken out showing how it was developed – to include the base rate, adjusting for the premiums and uplifts, and other indirect costs (which all shall be clearly identified/broken out in the cost proposal and how they were applied (additionally, the Contractor will provide what the indirect rate is based on and any additional documentation – i.e. approved forward pricing agreement, DCAA audit, etc.).
4.1.3 Government Provided Support.
4.1.3.1 Government Provided Support on Bagram Air Field (BAF). On BAF and Kandahar Air Field (KAF), the Contractor shall provide all management and logistical support with the exception of that is specifically listed below.
- Utilities: Prime power, potable water, wastewater disposal, trash disposal, western style field latrines and hand-washing stations,
- CAC and Afghanistan theater specific cards (note, the CAC and Afghanistan theater specific cards shall be returned by Contractor employees upon completion of project work, typically during out-processing in Afghanistan or at the CRC this item is rate-able in CPARS),
- Army & Air Force Exchange Service Facilities (Military Exchange) (including rationed items),
- Military Banking Facilities and Finance and Accounting Office (F&AO),
- Commissary (including rationed items),
- Morale, Welfare, and Recreational Facilities (i.e., clubs, theatres, gyms, etc.),
- Purchase of petroleum and oil products for rental and/or Government vehicles (See AR 215-8),
- Billets, if available,
- Messing facilities,
- Customs exemption,
- Emergency medical/dental services (the Contractor shall reimburse the Government for emergency medical/dental services provided),
- Military Postal Service (APO) (available to U.S. citizens only).
4.1.3.2 Government Provided Support on Other U.S. Installations in Afghanistan. Government provided support on other US installations in Afghanistan (i.e., other than BAF/KAF) will consist primarily of that provided by the US Army’s Logistics Civil Augmentation Program (LOGCAP), if any support is provided at all. The Contractor shall be completely self-sufficient when support is not available.
4.1.4 Contractor Provided Support.
4.1.4.1 Unless specified otherwise in this PWS herein, the Contractor shall provide all labor, equipment, material, and supplies needed to perform Task 1 requirements. Contractor provided equipment may include, but is not limited to, vehicles, security equipment and weapons, material handling equipment (MHE), heavy equipment (e.g., bulldozers, front-end loaders, tracked excavators, etc.), and other equipment to be utilized at the designated work locations. The Contractor shall provide for the maintenance and repair of the equipment in a manner which minimizes equipment downtime. Equipment procurement shall be subject to KO authorization as dictated by the needs of the project.
4.1.4.2 The Contractor shall coordinate logistics issues affecting safety and security as required.
4.1.4.3 The Contractor’s PM staff shall be located at BAF to manage the project and perform property control functions, unless directed otherwise.
4.1.4.4 The Project Management team forward, suggested to include the PM, Operations Manager, Resource Manager, Safety Officer, and at least one team leader per team, all personnel will maintain a valid security clearance, minimum of secret.
4.1.4.5 The Contractor shall field EFR teams with team composition as determined by the Contractor, subject to specific requirements contained herein, e.g., medical staffing, etc., and may be tailored for specific work or location subject to Government approval. OCN personnel may be proposed for the positions on the EFR teams. It is recommended that each EFR Team include the following personnel:
EFR Project Management Forward Suggested Staffing Quantity Description
1 PM (with minimum Secret Clearance) 1 Operations Manager (with minimum Secret Clearance) 1 Resource Manager (with minimum Secret Clearance) 1 Safety Officer (with minimum Secret Clearance)
Suggested EFR staffing and major equipment needs for each team is provided below. MHE/Heavy Equipment sizes are to be determined by the Contractor.
EFR Team Suggested Staffing, per Team
Min 1 Team Lead (with minimum Secret Clearance) 1 Medic/Paramedic 1 Safety Officer
12 MHE/Heavy Equipment Operator 12 Laborers 1 Driver 1 Mechanic 1 Security Personnel
EFR Team Suggested MHE/Heavy Equipment Levels
1 Bulldozer 2 Backhoes 1 Front-end loader 1 Crane, 120 ton, as needed
1 Lowbed trailer (lowboy) 1 Excavator 1 Grader 1 Water truck 2 20-ton Dump trucks 1 30-ton Forklift, as needed
4.1.4.6 Environmental Footprint Reduction Desktop Survey and Reduction Authorization. Prior to conducting reduction of facilities or other EFR activities the Contractor shall perform a desktop survey of the work to be conducted, and shall obtain written authorization to perform the reduction from the designated entity(s) having authority over the facilities. The desktop survey shall research the area and the facilities to be reduced utilizing available information and resources to include area/facility history, base master plans, aerial imagery and other maps, as-built drawings, etc. In conducting the survey consideration shall be made for the potential for MEC contamination and other environmental hazards. All EFR operations and activities shall be coordinated with base operations and local support facilities.
4.1.4.7 MEC Disposition. While conducting EFR team operations services any MEC encountered will be reported to the Base Operations Cell, or T-MAC, or other designated entity for disposal by military EOD teams, if available, or if required by the Base Operations Cell and authorized by the KO, the Contractor shall dispose of all MEC encountered in which case the Contractor shall plan on providing all donor explosives. The Contractor shall plan on being responsible for the storage of Class V materials on military installations where EOD support is not available. The Contractor will be responsible for accountability of Class V materials. The Contractor shall maintain a database that details all Class V ensuring accountability, receipts and dates of destruction. The database shall include the following data fields, but not limited to identification of each type, munitions received by DODIC (if military issued), date received, nomenclature, hazard code/division, United Nations organization serial number, net explosive weight, gross weight, date consumed/destroyed. In addition and upon completion of demolition operations, the Contractor shall be required to submit two demolition consumption reports (DA Form 5692-R and DA Form 4949) accounting for the Class V materials received within 24-hours.
4.1.4.8 The Contractor shall provide and maintain communication support for project activities to be supported by Task 1.
Communication support shall include, but not be limited to, providing any new equipment or systems, or infrastructure required to achieve reliable transfer of voice and data as required (VOIP with (256) area code (unlimited)). If new Contractor acquired data and voice communication equipment is required, it shall be subject to Government review and approval. In this regard, the Contractor shall coordinate with the Government prior to purchasing communication equipment. The Government shall provide communications security guidance and procedures, as required, to which the Contractor’s adherence shall be required. This is so the Government can ensure that the equipment will not interfere with the military’s equipment.
4.1.4.9 The Contractor shall provide all transportation for personnel to and from work sites. All non-tactical vehicles (NTV) operating on BAF LSA must be registered in accordance with prevailing registration requirements. Additionally, the Contractor shall provide general maintenance and services as required for government personnel use in support of Task 1 objectives. Due to vehicle congestion on BAF and Command directives the Contractor should assume that the maximum number of vehicles that the Contractor will be allowed to register on BAF will be limited to a maximum of 4 vehicles. Furthermore, the number of vehicles will go down as drawdown policies are implemented (scope of drawdown is TBD).
4.1.4.10 The Contractor shall provide qualified medical staff and medics/paramedics in support of EFR operations.
Contractor provided medical personnel shall be in compliance with applicable Afghanistan Mine Action Standards (AMAS) requirements because of the chance of encountering explosive hazards, i.e., landmines, UXO, etc.
4.1.4.11 All Contractor personnel in theater shall be equipped with individual body armor (IBA). The Contractor shall provide IBA to its employees unless otherwise provided for by the Government. The Contractor shall be responsible for providing its non-U.S. deploying personnel with Personal Protective Equipment (PPE) required for mine clearance work on Task 1 that is not issued by the CRC. For the purpose of Task 1 mine clearance PPE is not considered to be IBA. The Contractor may also be required to provide USACE personnel with IBA on a case by case basis.
4.1.4.12 The Contractor shall coordinate with the Government for the provision of emergency medical treatment and evacuation as required; however, the Contractor shall reimburse the Government for emergency medical treatment and evacuation services provided.
4.1.4.13 MilAir shall be used whenever available to travel within Afghanistan. In the event that MilAir is unavailable, the contractor may be authorized by the KO to utilize commercial air capabilities to accomplish their associated tasks. Use of commercial air within Afghanistan will be accounted for under Task 1.8: EFR Logistics and Additional Support.
4.1.4.14 The Contractor shall be responsible for processing personnel, equipment and supplies through customs in designated locations to allow expeditious travel to Afghanistan and/or other locations as required by the KO.
4.1.4.15While Contractor personnel are off BAF or other U.S. installations the Contractor shall be responsible for the safety and security of its personnel at all times (i.e., 24/7) including security from the point of entry into Afghanistan to the work site and throughout the life cycle of the project. The Contractor shall only utilize approved Private Security Companies (PSC) licensed to operate in Afghanistan or comply with the Afghanistan Personnel Protection Force (APPF) as required.
4.1.4.16 In the event that the Contractor is required to conduct MEC demolitions the Contractor shall provide security, transportation, storage and accounting for all donor explosives as required. The Contractor shall provide the means to re-supply Class V material to all worksites, as required.
4.1.4.17 The Contractor shall provide for the maintenance and repair of all equipment provided.
4.1.5 General Requirements.
4.1.5.1 Work will be undertaken in a highly dynamic environment. The Contractor will be expected to coordinate all activities with the CEHNC PM or the Government designated authority for remote locations, i.e., during EFR teams operations. While working on military installations, the Contractor shall coordinate all aspects of EFR team operations services, schedules, and disposal activities with the Base Operations Cell (Mayor’s Cell) or tenant or other units as required. The Contractor onsite management team should be staffed appropriately for the teams to handle the requirements of Task 1.
4.1.5.2 Afghanistan Workweek. For Contractor employees. The workweek for Contractor employees in Afghanistan is based on 6 days per week, 10 to12 hours per day. Unless directed otherwise, all employees shall be required to work a minimum of 6 days a week (i.e., 40 hours of straight time and, 32 hours of overtime, not to exceed 72 hours total per week), with one day of rest. For operations, the Contractor can assume that the work will start approximately at 0600 hours and will end approximately 1700 hours (during the winter, hours worked will be dependent on the hours of daylight for safe operations and thus the Contractor should assume approximately no more than 12 hours per day per employee).
The Afghanistan day off is usually Friday; therefore, normally, no training or operations should be planned on this day.
4.1.5.3 Ordnance and Explosives. All MEC, ERW, and UXO are all safety hazards and may constitute an imminent and substantial endangerment to military and contractor personnel. All activities involving work in areas potentially containing these hazards shall be conducted in full compliance with the most current AMAS, as applicable. The KO will direct which versions of AMAS govern. United Nations Mine Action Coordination Center Afghanistan (UNMACCA) clearance certificates may be available for specific areas that the Contractor may be working in. In some instances;
however, the Contractor may be required to obtain clearance certificates after confirming that all explosive hazards have been removed in the process of environmental footprint reduction.
4.1.5.4 Compensation for Mobilization and Demobilization of Contractor Personnel. Other than initial mobilization cost, only Contractor personnel that have been in theater a minimum of 6 months shall qualify for Government provided compensation for mobilization cost, and only Contractor personnel that have been in theater a minimum of 12 months shall qualify for Government provided compensation for demobilization cost unless these requirements cannot be meet due to Contractor employee illness, or other unavoidable situations subject to KO approval, or remaining task order performance period would prevent meeting the requirements.
4.1.5.5 Home Leave Policy: The Contractor’s Home Leave policy shall be at the Contractor’s discretion providing that the Contractor manages and maintains a 90% operational strength throughout the life of Task 1. Contractor Home Leave costs shall not be a billable expense and no mobilization or demobilization costs associated with Home Leave will be allowable.
4.1.5.6 Physical Security. For EFR team operations services on military installations the Government may be able to provide security. However, the Contractor shall provide security in the event that the Government cannot. Physical security may require APPF support as required by the Afghanistan Government.
4.1.5.6.1 The Contractor shall only utilize approved Private Security Companies (PSC) licensed to operate in Afghanistan when required. The Contractor shall provide a Security Manager that is in charge of the oversight of all security operations for work of Task 1. The Security Manager shall have a minimum SECRET security clearance and shall coordinate with the host base’s Force Protection Office, JDOC/BDOC/TOC, as required to adequately address physical security and to request QRF/MEDEVAC support as situations warrant. Contractor is responsible for providing all training and paperwork required to provide proof of and maintain required clearance levels.
4.1.5.6.2 A security clearance is required for Task 1. The clearance level required will be determined by the User Agency.