DRAFT Agenda.pdf

PDF 88 KB Posted

Attached to
AFNWC VLF Industry Day Jan 2026
Solicitation number
VLFJAN2026
Issued by

About this file

This document is a two-day conference agenda for a VLF (Very Low Frequency) project, scheduled for January 14-15, 2026. Day 1 features a comprehensive overview of the VLF mission, including presentations from multiple organizations such as MITRE, VLF EPO, JHU, NSA, CCSD, and AFNWC/NCN. Key topics include safety and security, acquisition strategy, program risks, technical considerations, system certifications, and detailed technical discussions on areas like survivability, waveforms, platform integration, and KGV-363 capabilities.

Day 2 is structured as a series of seven 45-minute one-on-one session slots for contractors, with 15-minute breaks between each session and a longer 75-minute break/lunch period. The agenda is marked as a draft and appears to be part of an acquisition or project planning process involving multiple technical and military organizations. Presenters represent various agencies including MITRE, VLF EPO, JHU, NSA, and CCSD, suggesting a complex, multi-stakeholder technical project likely related to communications or defense technology.

View the file

Other files

File Type Posted
2025 MITRE Bedford Visitor Package.pptx PPTX presentation

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Day 1 - January 14, 2026 Start Subject OPR Presenter

7:30-8:00 Check-in

VLF OVERVIEW

8:00 Safety/Security: devices, restrooms, emergency exits MITRE 8:05 Opening Remarks VLF EPO Mr. Hardiman 8:20 OCI Mitigation VLF EPO JA 8:30 VLF Mission Overview & Acquisition Strategy VLF EPO Lt Col Thornton 8:45 Integrated Master Plan VLF EPO Ken Bell 9:00 SCG and (physical) security requirements VLF EPO Matt Cosano 9:15 Candidate Platforms VLF EPO AFGSC 9:40 Intel Brief VLF EPO Caryn Frederick 9:55 EVM, IMS Expectations VLF EPO Bob Buche

10:20 BREAK

Program Risks and Key Performance Parameters

10:30 PCMR, Ao, Reliability VLF EPO Ken Bell VLF Environment and Modeling

11:00 MASSC Overview JHU

PCMR Coverage methodology JHU

Interference Mitigation requirement definition study JHU Digital Acquisition

11:45 Digital Acquisition & IDE AFNWC/NCN NCW

12:15 LUNCH

Technical Considerations 1:00 Survivability MITRE Paul Alcorn 1:15 OMS/UCI and WSI MITRE Lee Tatistcheff 1:55 Waveforms MITRE Dr. Matt Lowe 2:25 Platform Integration, GSA MITRE Juan Arango

3:05 BREAK

3:15 Mechanical and Environmental MITRE Paul Kelley 3:30 KGV-363 Capabilities CCSD Luke Garcia 3:45 KGV-363 Schedule & Status CCSD Luke Garcia

System Certifications 4:00 NSA Certification process and timeline NSA NSA

KGV363 Embedment Concerns

SERD Overview

HAEDDESR

CM2

5:00 Adjourn

DRAFT

Day 2 - January 15, 2026

Start Subject Contractor # of Contractor Attendees Duration (min)

9:00 1:1 Session Slot #1 45 9:45 Break 15 10:00 1:1 Session Slot #2 45 10:45 Break 15 11:00 1:1 Session Slot #3 45 11:45 Break 15 12:00 1:1 Session Slot #4 45 12:45 Break / Lunch 75 2:00 1:1 Session Slot #5 45 2:45 Break 15 3:00 1:1 Session Slot #6 45 3:45 Break 15 4:00 1:1 Session Slot #7 45 4:45 Adjourn

File details come from the government source that posted it. Updated .