Draft_570-17-210.OPC.DWG.20221021Part-1.pdf
PDF 20 MB Posted
- Solicitation number
- 36C26123R0008
About this file
This document is a pre-solicitation announcement for solicitation number 36C26123R0008 to remodel the emergency department and upgrade utilities at the VA Central California Health Care System in Fresno, California. The project magnitude is estimated between $5 million and $10 million. The applicable NAICS code is 236220 for commercial and institutional building construction, with a small business size standard of $39.5 million. The PSC code is Z2DA for repair or alteration of hospitals and infirmaries. A draft solicitation and specifications will be available on January 20, 2023, with a pre-proposal conference scheduled for January 25, 2023 via Microsoft Teams. An in-person site visit will be held on January 26, 2023 at the VA Central California Health Care System. Questions regarding the announcement must be sent in writing to the specified points of contact by the given deadlines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft_570-17-210.OPC.DWG.20221021Part-2.pdf | ||
| 36C26123R0008_1.docx | DOCX document | |
| Draft_570-17-210.OPC.Specs.20221024.pdf | ||
| Draft_570-17-210.OPC.DWG.20221021Part-3.pdf | ||
| DRAFT_36C26123R0008_01062023.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E. SHIELDS AVE
E. CLINTON AVE
N
B L A
C K
S T
O N
E A
V E
E. SHIELDS AVE
E. MCKINLEY AVE
E. OLIVE AVE
N
F R
E S
N O
S T
N
F
IR
S T
S T
N
C E
D A
R A
V E
N
M A
P L E
A V
E
VACCHCS
PROJECT REVIEW
DATE: APPROVED: DIRECTOR
DATE: APPROVED: CHIEF OF STAFF
DATE: APPROVED: CHIEF, SAFETY SERVICE
DATE: APPROVED: CHIEF ENGINEER
DATE: APPROVED: ASSOCIATE DIRECTOR, PATIENT CARE SERVICES
DATE: APPROVED: CONTRACTING OFFICER
DATE: APPROVED: CONTRACTING OFFICER'S REPRESENTATIVE
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ELECTRICAL: MECHANICAL:
P2S ENGINEERING, INC.
5000 E. SPRING STREET, 8TH FLOOR
LONG BEACH, CA 90815-5218
562.497.2999
B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
A u to d e s k D o c s /5
-1
-2
E x p a n d
E D
B e d s
/5
-1
-2
.O P
C .A
R C
H .r v t
/2
/2
:4
:2
P
M
G-000
GENERAL COVER SHEET
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
09/11/2022 M. PERKINS N.
BLANCHARD
ISSUED FOR
CONSTRUCTION
ISSUED FOR CONSTRUCTION
09/11/2022
570-17-210 REMODEL ED BEDS FOR OBSERVATION BEDS - OPC
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM
VICINITY MAP
NOT TO SCALE THIRD-PARTY INSPECTIONS: COMPREHENSIVE THIRD-PARTY
INSPECTIONS, TESTING AND WRITTEN REPORTS FOR ALL
DIVISIONS ARE PAID BY THE GENERAL CONTRACTOR.
CONTRACTOR SHALL EMPLOY THIRD-PARTY INSPECTION
CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS
CONTRACT. THE VA HAS NO INSPECTION CAPABILITY. ANY
REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY
INSPECTOR QUALIFIED TO PERFORM THE WORK. CREDENTIALS
SHALL BE SUPPLIED TO THE VA/AE AS REQUIRED BY THIS
CONTRACT. ALL INSPECTIONS, TESTING CERTIFICATIONS, AND
PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR.
THE VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED
INSPECTIONS. VA INSPECTIONS ARE FOR VA USE ONLY, WHEN
PERFORMED, AND DO NOT REDUCE THE INSPECTION BURDEN ON
THE CONTRACTOR.
SCOPE OF WORK
Section 01 00 00
1. STATEMENT OF BID ITEM(S)
A. CLIN 0001 - ITEM I, GENERAL CONSTRUCTION: BASE BID: Work includes general construction, alterations, and necessary removal of existing systems and structures and construction or and certain other items. Project includes modifications to existing HVAC, electrical, and IT.
A new variable air volume air handling unit (AHU-3) will be installed in the basement mechanical room of Building OPC. The unit will be approximately 13,000 CFM and it will consist of an energy recovery wheel, an exhaust fan, a variable frequency drive, return air inlet plenum, a return air sound attenuator, a return/relief fan with fan wall technology and a variable frequency drive, a mixing box with an air side economizer, a MERV 7 pre-filter #1 , a MERV 11 pre-filter #2, a hot water reheat coil, a clean steam humidifier, a chilled water cooling coil, a heating hot water heating coil, a supply fan with fan wall technology and a variable frequency drive, a sound attenuator, final filters MERV 14, and a discharge plenum. Variable frequency drives will be provided for the supply, return, and exhaust air fans. The fixed minimum outside air will be pre-conditioned by the energy recovery ventilation section of the air handling unit. General exhaust will be provided for the toilet rooms, the soiled utility room, the soiled linen room, and the housekeeping closet as required and discharged to atmosphere via the energy recovery ventilation section exhaust air fan. The exhaust air discharge will be terminated a minimum of 25’-0” away from any outside air intakes and/or building opening and a minimum 10’ above the roof level. All spaces will be provided with outdoor air ventilation as required to maintain minimum design air changes per hour in compliance with ASHRAE, IMC, VA, and FGI medical facility design recommendations.
Provide new single duct terminal units with hospital grade liner, hot water reheat coil, valve actuator, airflow sensor, duct probe temperature sensor, and factory mounted Metasys controller shall be provided at each location identified on the mechanical plans and schedules. Additional items include a thermostat, a valve set, control wiring and conduit, and power wiring and conduit to provide a complete and operational system at each installation. Each valve set includes a stainless-steel hose with a Belimo or equal pressure independent control valve, strainer, and isolation valves on the HWS and HWR valve set. A network controller panel shall be provided to serve a maximum of 60 terminal units. Electrical 120V feeders shall be extended to each terminal unit with all associated conduit, mounting hardware, junction boxes and fittings. Each terminal unit shall be provided with a 120V/24V power supply to actuate the damper and valve controllers. New electrical feeders shall be supplied by new emergency power panels and circuit breakers as shown on the drawings.
In addition to sealing all new penetrations, Contractor is responsible for providing fire stopping for all existing, unprotected penetrations in the Area of Work. Contractor shall bid (100 penetrations and a deductive change order will be issued if the actual number is less than the estimated number.
All systems are to be commissioned as new with re-commissioning after one year from Government Acceptance. In addition provide seasonal commissioning per Specification 01 91 00 for all mechanical systems.
NO ACM (ASBESTOS CONTAINING MATERIAL) IS ALLOWED ON THIS PROJECT. NO
DUCT ADHESIVE OR ROOF ADHESIVE SHALL CONTAIN ACM. CONTRACTOR IS TO
SUBMIT ALL PRODUCT FOR REVIEW WITH A CERTIFICATE FROM THE PRODUCT
MANUFACTURER THAT NO ACM IS PRESENT IN THE PRODUCT.
Revisions: Date:
THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
SIGNATURE 09/11/2022 DATE
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
/11
/20
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
A u to d e s k D o c s /5
-1
-2
E x p a n d
E D
B e d s
/5
-1
-2
.O P
C .A
R C
H .r v t
/1
/2
:3
:4
A
M
G-001
GENERAL DRAWING INDEX
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
09/11/2022 M. PERKINS N.
BLANCHARD
ISSUED FOR
CONSTRUCTION
- DRAWING INDEX -
SHEET NUMBER SHEET NAME 35% SUBMITTAL 65% SUBMITTAL 95% SUBMITTAL
100% PRE-FINAL
SUBMITTAL
100% FINAL
SUBMITTAL
GENERAL
G-000 GENERAL COVER SHEET Yes Yes Yes Yes Yes
G-001 GENERAL DRAWING INDEX Yes Yes Yes Yes Yes
G-002 GENERAL VA PROJECT NOTES Yes Yes Yes Yes Yes
G-050 GENERAL TYPICAL FIXTURE MOUNTING HEIGHTS Yes Yes Yes Yes Yes
G-101 GENERAL LIFE SAFETY PLAN AND CODE DATA Yes Yes Yes Yes Yes
G-102 PHASING PLAN No No No No Yes
G-103 PHASING PLANS No No No No Yes
GI200 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY MEASURES Yes Yes Yes Yes Yes
GI201 GENERAL PRECONSTRUCTION INFECTION CONTROL RISK ASSESSMENT No No No Yes Yes
CIVIL
CD101 CIVIL DEMO PLAN Yes
CS101 CIVIL SITE PLAN Yes Yes Yes Yes Yes
CS501 CIVIL DETAIL SHEET 1 No No Yes Yes Yes
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES Yes
S-002 GENERAL STRUCTURAL NOTES CONTINUED Yes
S-350 FRAMING SECTION AND ENLARGED PLANS Yes
S-520 FRAMING DETAILS Yes
ARCHITECTURE
A-002 ARCHITECTURAL ABBREVIATIONS & SYMBOLS Yes Yes Yes Yes Yes
AD100 ARCHITECTURAL DEMO PLAN - LEVEL B - OVERALL Yes Yes Yes Yes Yes
AD100B ARCHITECTURAL DEMO PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
AD150 ARCHITECTURAL DEMO REFLECTED CEILING PLAN - LEVEL B - OVERALL Yes Yes Yes Yes Yes
AD150B ARCHITECTURAL DEMO REFLECTED CEILING PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
A-100 ARCHITECTURAL FLOOR PLAN - LEVEL B - OVERALL Yes Yes Yes Yes Yes
A-100B ARCHITECTURAL FLOOR PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
A-100B-1 ARCHITECTURAL DIMENSION PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
AC100 ARCHITECTURAL REFLECTED CEILING PLAN - LEVEL B - OVERALL Yes Yes Yes Yes Yes
AC100B ARCHITECTURAL REFLECTED CEILING PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
A-200 ARCHITECTURAL PROPOSED BUILDING ELEVATIONS Yes Yes Yes Yes Yes
A-350 EXTERIOR WALL SECTIONS & DETAILS No No Yes Yes Yes
A-351 EXTERIOR ENLARGED PLANS & DETAILS No No No No Yes
A-401 ARCHITECTURAL ENLARGED VIEWS Yes Yes Yes Yes Yes
A-402 ARCHITECTURAL ENLARGED VIEWS Yes Yes Yes Yes Yes
A-511 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes Yes
A-512 ARCHITECTURAL DETAILS No Yes Yes Yes Yes
A-601 ARCHITECTURAL DOOR SCHEDULE Yes Yes Yes Yes Yes
A-701 INTERIOR WALL TYPES Yes Yes Yes Yes Yes
A-721 HEAD-OF-WALL DETAILS Yes Yes Yes Yes Yes
A-722 PARTITION FRAMING DETAILS Yes Yes Yes Yes Yes
A-901 ARCHITECTURAL INTERIOR RENDERINGS No Yes Yes Yes Yes
SIGNAGE
AW100B ARCHITECTURAL SIGNAGE PLAN No No Yes Yes Yes
AW601 ARCHITECTURAL SIGNAGE NOTES AND SCHEDULE No No Yes Yes Yes
INTERIOR DESIGN
IN100B INTERIOR FINISH FLOOR PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
IN601 INTERIOR FINISH LEGEND & ROOM FINISH SCHEDULE Yes Yes Yes Yes Yes
IN701 INTERIOR FINISH COLOR BOARDS Yes Yes Yes Yes Yes
EQUIPMENT
Q-100B EQUIPMENT PLAN - LEVEL B - AREA B No Yes Yes Yes Yes
Q-600 EQUIPMENT SCHEDULE No Yes Yes Yes Yes
FIRE PROTECTION
FX001 FIRE PROTECTION LEGEND No No Yes Yes Yes
FXD100B FIRE PROTECTION DEMOLITION PLAN - LEVEL B - AREA B No No Yes Yes Yes
FX100B FIRE PROTECTION PLAN - LEVEL B - AREA B No No Yes Yes Yes
PLUMBING
P-001 PLUMBING LEGEND No No Yes Yes Yes
PD100B PLUMBING DEMOLITION PLAN - LEVEL B AREA B No No Yes Yes Yes
PD100D PLUMBING DEMOLITION PLAN - LEVEL B AREA D No No Yes Yes Yes
PP100B PLUMBING PLAN - LEVEL B AREA B No No Yes Yes Yes
PP100D PLUMBING PLAN - LEVEL B AREA D No No Yes Yes Yes
PG100B PLUMBING MEDICAL GAS PLAN - LEVEL B - AREA B No No Yes Yes Yes
P-701 PLUMBING SCHEDULES No No Yes Yes Yes
MECHANICAL
M-001 MECHANICAL LEGEND Yes Yes Yes Yes Yes
MS101 MECHANICAL TEMPORARY SITE PLAN Yes Yes Yes Yes Yes
MD100 MECHANICAL DEMO PLAN - OVERALL No No No No Yes
MD100A MECHANICAL DEMO PLAN -LEVEL B - AREA A Yes Yes Yes Yes Yes
MD100B MECHANICAL DEMO PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
MD100C MECHANICAL DEMO PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes
MD100D MECHANICAL DEMO PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes
MD102 MECHANICAL DEMO PLAN - ROOF LEVEL Yes Yes Yes Yes Yes
MH100 MECHANICAL DUCT PLAN - LEVEL B - OVERALL No No No No Yes
MH100A MECHANICAL DUCT PLAN - LEVEL B - AREA A Yes Yes Yes Yes Yes
MH100B MECHANICAL DUCT PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
MH100C MECHANICAL DUCT PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes
MH100D MECHANICAL DUCT PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes
MH102 MECHANICAL PLAN - ROOF LEVEL Yes Yes Yes Yes Yes
MP100A MECHANICAL PIPING PLAN - LEVEL B - AREA A No No Yes Yes Yes
MP100B MECHANICAL PIPING PLAN - LEVEL B - AREA B No No Yes Yes Yes
MP100C MECHANICAL PIPING PLAN - LEVEL B - AREA C No No Yes Yes Yes
MP100D MECHANICAL PIPING PLAN - LEVEL B - AREA D No No Yes Yes Yes
M-501 MECHANICAL DETAILS Yes Yes Yes Yes Yes
M-502 MECHANICAL DETAILS Yes Yes Yes Yes Yes
M-601 MECHANICAL AIR FLOW DIAGRAM - SUPPLY AIR Yes Yes Yes Yes Yes
M-602 MECHANICAL AIR FLOW DIAGRAM - RETURN & EXHAUST AIR Yes Yes Yes Yes Yes
M-701 MECHANICAL SCHEDULES Yes Yes Yes Yes Yes
M-702 MECHANICAL SCHEDULES Yes Yes Yes Yes Yes
M-703 MECHANICAL SCHEDULES Yes Yes Yes Yes Yes
M-704 MECHANICAL CUT SHEETS No Yes Yes Yes Yes
M-705 MECHANICAL CUT SHEETS No Yes Yes Yes Yes
M-801 MECHANICAL CONTROLS LEGEND Yes Yes Yes Yes Yes
M-802 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes Yes
M-803 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes Yes
M-804 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes Yes
M-805 MECHANICAL POINTS SCHEDULE Yes Yes Yes Yes Yes
M-901 MECHANICAL REFERENCES No No Yes Yes Yes
M-902 MECHANICAL REFERENCES No No Yes Yes Yes
ELECTRICAL
E-001 ELECTRICAL SYMBOL LEGEND AND ABBREVIATIONS Yes Yes Yes Yes Yes
ED100A ELECTRICAL DEMO PLAN -LEVEL B - AREA A Yes Yes Yes Yes Yes
ED100B ELECTRICAL DEMO PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
ED100C ELECTRICAL DEMO PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes
ED100D ELECTRICAL DEMO PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes
ED102 ELECTRICAL DEMO PLAN - ROOF LEVEL Yes Yes Yes Yes Yes
EL100B ELECTRICAL LIGHTING PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
EP100A ELECTRICAL POWER PLAN - LEVEL B - AREA A Yes Yes Yes Yes Yes
EP100B ELECTRICAL POWER PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
EP100C ELECTRICAL POWER PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes
EP100D ELECTRICAL POWER PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes
EP102 ELECTRICAL POWER PLAN - ROOF LEVEL Yes Yes Yes Yes Yes
ET100B ELECTRICAL SYSTEMS PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
E-601 PARTIAL ONE LINE DIAGRAM Yes Yes Yes Yes Yes
E-701 ELECTRICAL SCHEDULES AND DETAILS Yes Yes Yes Yes Yes
E-702 ELECTRICAL SCHEDULES Yes Yes Yes Yes Yes
Grand total: 108
Revisions: Date:
/11
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
A u to d e s k D o c s /5
-1
-2
E x p a n d
E D
B e d s
/5
-1
-2
.O P
C .A
R C
H .r v t
/1
/2
:3
:5
A
M
G-002
GENERAL VA PROJECT NOTES
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
09/11/2022 M. PERKINS N.
BLANCHARD
ISSUED FOR
CONSTRUCTION
GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTESGENERAL DIMENSIONING NOTES GENERAL PAINTING NOTES
GENERAL SEALANT / CAULKING NOTES
GENERAL DEMOLITION
1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK MUST BE INSPECTED AND APPROVED BY LOCAL AUTHORITIES.
3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR(S) PRIOR
TO FABRICATION AND CONSTRUCTION. IF INCONSISTENCIES, CONTRADICTIONS OR OMISSIONS
ARE DISCOVERED FOLLOW PROCEDURES LISTED IN SECTION 01 26 13 REQUESTS FOR
INFORMATION (RFI).
4. GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL DUCT SIZES
AND LOCATIONS.
5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL
KNOWLEDGE.
6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE INSTALLED LEVEL WITH EACH OTHER
AND PLUMB.
7. THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE FULL SCOPE OF WORK.
8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. IF DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN SECTION 01 26 13
REQUESTS FOR INFORMATION (RFI).
9. FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION, CONTRACTOR SHALL
VERIFY THAT ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT DOCUMENTS.
REPORT DISCREPANCIES TO ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING WORK
RELATED TO ANY DISCREPANCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION PRIOR TO BIDDING, THE
CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE MORE COSTLY TIME, METHOD, SYSTEM,
PRODUCT, SUBCONTRACT AND/OR MATERIAL.
11. VV: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS VV IS NOT IN THE CONTRACT.
HOWEVER, THE CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK INDICATED AS VV.
12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH COR, INCLUDING STAGING
AREAS, MATERIAL STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY OPERATIONS,
INTERRUPTION OF UTILITIES. SEE SPECIFICATIONS.
13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE PLACEMENT OF EACH TRADE'S
WORK SO THAT THERE ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR FUNCTION
IMPAIRED. IT IS ESPECIALLY IMPORTANT TO COORDINATE PENETRATIONS THROUGH
FOUNDATIONS, FLOORS, WALLS AND CEILING SPACES. SEE SPECIFICATIONS.
14. PROVIDE GALVANIC SEPARATION MATERIAL, BETWEEN DISSIMILAR METALS. SEE
SPECIFICATIONS.
15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE FIRE TREATED. SEE
SPECIFICATIONS. ALL SURFACE ATTACHED METAL SHALL BE SEPARATED FROM CONCRETE OR
MASONRY BY NON-METALLIC MATERIAL SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL
AS APPROVED BY ARCHITECT AND COR.
16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL EQUIPMENT, FIXTURES, DEVICES,
MECHANICAL, PLUMBING OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR, MECHANICAL
AND ELECTRICAL PLANS FOR ADDITIONAL ELEVATION COORDINATION.
17. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK PERMITS TO BE COORDINATED WITH
COR. SUBMIT CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.
1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI). IF DISCREPANCIES ARE DISCOVERED AFTER THE BID FOLLOW PROCEDURES LISTED IN SECTION 01 33 23 PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.
2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED BY THE DESIGNERS. THROUGH FIELD INVESTIGATION, SHOP DRAWINGS, AND COORDINATION DRAWINGS; CONTRACTOR SHALL VERIFY DIMENSIONS AND RECOMMEND DIMENSIONAL MODIFICATIONS AS
REQUIRED.
3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS, SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR ELEVATIONS AND EXTERIOR ELEVATIONS.
4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.
MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES MAY ALSO CONTAIN DIMENSIONAL INFORMATION
RELATED TO EQUIPMENT SIZES AND CLEARANCES.
5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X 4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE. (FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE SHOWN IN THE 16THS OF AN INCH, BUT STANDARD MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").
FLOOR PLAN DIMENSIONS
1. THE LOWEST FLOOR OVERALL BUILDING DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE FOUNDATION WALL TO THE OPPOSITE OUTSIDE FACE OF THE FOUNDATION WALL (OR, FROM OUTSIDE GRIDLINE TO OUTSIDE
GRIDLINE) AS SHOWN.
2. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE TO ONE FACE OF THE STUDS, BOTH FACES OF MASONRY
WALLS, OR BOTH FACES OF CONCRETE WALLS, ETC, UNLESS NOTED OTHERWISE.
3. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL (UNLESS NOTED AS "NOM").
4. DOOR OPENING DIMENSIONS IN FRAME CONSTRUCTION (WOOD OR STEEL STUDS) ARE TYPICALLY SHOWN AT THEIR CENTERLINES. HOWEVER, WHEN THE EDGE OF THE DOOR IS IMPORTANT, OR MAKES THE
PLACEMENT CLEARER, THE DIMENSION MAY BE TO THE ACTUAL FRAME EDGE.
5. DOOR DIMENSIONS IN LOAD-BEARING MASONRY AND CONCRETE WALLS ARE TO "ROUGH" OPENINGS (FACES OF MASONRY OR CONCRETE). TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE THE FRAME WIDTH PLUS 1/2"
(1/4" CLEARANCE EACH SIDE) AND PLUS 1/2" TOTAL FOR THE HEAD/SILL DIMENSIONS.
6. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS TO ADJACENT WALLS: BETWEEN FRAME FACES AND FACES OF STUDS, OR FACES OF MASONRY OR CONCRETE, AT NEARBY PERPENDICULAR WALLS ARE TYPICALLY 4", DEPENDING ON HARDWARE CLEARANCES AND FRAME REQUIREMENTS (2.5"-DOOR HANDLE PLUS
1" -WALL STOP PLUS 1/2" GB=4.0")
7. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR PREFABRICATED STAIR ENCLOSURES, ARE NOTED "CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES OF
FINISHES.
8. DIMENSIONS DESIGNATED WITH "MIN" INDICATE THE MINIMUM CLEARANCE OR SEPARATION REQUIRED.
ROOF PLAN DIMENSIONS
1. UN-DIMENSIONED LOCATIONS OF ROOFTOP EQUIPMENT AND CONSTRUCTION OFTEN MAY BE DETERMINED BY THE FLOOR PLAN BELOW, SUCH AS ROOF HATCH DETERMINED BY REFERENCE TO A FIXED WALL AND
LADDER, OR MECHANICAL EQUIPMENT DETERMINED BY DUCT PENETRATIONS BETWEEN JOISTS.
2. UN-DIMENSIONED ITEMS SUCH AS EQUIPMENT RAILS, HVAC EQUIPMENT, SCREEN WALLS, ANTENNAS, WALK PADS, LADDERS, SCUPPER LOCATIONS, ETC., MAY BE LOCATED FROM MECHANICAL AND ELECTRICAL DRAWINGS OR LOCATED BY SCALING. CONFIRM ALL ROOF ITEM DIMENSIONS WITH THE ARCHITECT AND COR
PRIOR TO CONSTRUCTION.
VERTICAL DIMENSIONS
1. UNLESS NOTED OTHERWISE, THE FIRST FLOOR REFERENCE ELEVATION IS 100'-0". THIS IS REFERENCED TO A GROUND ELEVATION ABOVE MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR STRUCTURAL DRAWINGS.
ELEVATIONS BELOW 0'-0" ARE "-" (PREFIXED WITH A MINUS SIGN).
2. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON ARCHITECTURAL DRAWINGS ARE TO TOP OF DECKING OR
SHEATING, BUT DO NOT INCLUDE FINISHES OR ROOFING MATERIAL.
3. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD- BEARING MASONRY OR CONCRETE WALLS, WHERE THEY ARE TO ROUGH OPENINGS). HEIGHT REFERENCES
SHOULD BE TO THE NEXT LOWER FINISH FLOOR ELEVATION
4. LIGHTING HEIGHTS ON WALLS ARE TO CENTERLINES OF THE ELECTRICAL BOXES, UNO. EQUIPMENT, VENT, PLUMBING AND FIXTURE ELEVATIONS ARE TO CENTERLINES OF THE WALL PENETRATIONS, UNO.
5. SOME VERTICAL DIMENSIONS ARE SHOWN ON PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND ELEVATION CHANGES. A PLAN ELEVATION CHANGE SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND INDICATES THE + OR - ELEVATION CHANGE IN INCHES FROM THE FINISHED FLOOR ELEVATION (FFE) NEXT TO IT.
FIRE ALARM
1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN ACCORDANCE WITH CLASS "a"
PROTECTION OF NFPA 101 LIFE SAFETY CODE.
2. SUBMIT PER SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES; AND SECTION 28
31 00 FIRE DETECTION AND ALARM FOR APPROVAL PRIOR TO THE INSTALLATION.
FIRE EXTINGUISHERS
1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY PORTABLE FIRE
EXTINGUISHERS AND SHALL MAINTAIN THEM DURING THE COURSE OF CONSTRUCTION. EACH
EXTINGUISHER SHALL BE 10 lb. CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C FIRES. ALL
EXTINGUISHERS SHALL BE U.L. LABELED AND SHALL BE DRY CHEMICAL TYPE.
EXIT AND EMERGENCY LIGHTING
1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING TO EXTERIOR WITH MINIMUM 6" HIGH
LETTERS AT REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR INTERSECTIONS AND
CHANGES OF DIRECTION. EXIT WAY; CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A
SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE WHEN NORMAL POWER IS INTERRUPTED.
EMERGENCY LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE POWER AT FLOOR LEVEL.
EXIT DOOR SHALL SWING IN THE DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2" BELOW
THE THRESHOLD.
2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH THE LOCAL AND CURRENT NEC
GUIDELINES.
FIRE SPRINKLER SYSTEM
1. EXISTING FIRE SPRIKLER MAIN PIPES AND BRANCH LINES TO BE RETAINED AND REUSED.
CONTRACTOR TO VERIFY THE EXACT SIZE AND LOCATION IN FIELD.
2. ALL NEW SPRINKLER HEADS, HANGERS AND RESTRAINTS TO BE INSTALLED IN ACCORDANCE
WITH 2016 NFPA 13.
3. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD PIPED, NO FLEXIBLE CONNECTIONS ARE
PERMISSIBLE.
FIRE & SMOKE DAMPERS
1. EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED AND REUSED.
2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM. THE BUILDING IS EQUIPPED WITH A FIRE
SPRINKLER AND FIRE ALARM SYSTEM.
FIRE STOPPING
1. FIRE STOPPING IS REQUIRED. SEE SECTION 07 84 00 FIRE STOPPING.
GENERAL
1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE OR FLAME-PROOFED IN AN APPROVED
MANNER.
2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS LOCATED IN BUILDINGS SHALL HAVE A
FLAME SPREAD OF NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF NOT MORE THAN 50
WHEN TESTED AS A COMPOSITE INSTALLATION, INCLUDING INSULATION, FACING MATERIALS, TAPES
AND ADHESIVES NORMALLY APPLIED.
3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-CEILING ASSEMBLIES, ROOF CEILING
ASSEMBLIES, WALLS SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25 AND A SMOKE
DENSITY NOT TO EXCEED 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84.
4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE CENTERED BETWEEN 30" AND 44"
ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING
HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS ABOVE IN EGRESS DIRECTION. DOOR
CLOSERS (EXCEPT FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM AN OPEN POSITION OF
70 DEGREES, THE DOOR WILL TAKE AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE
LATCH, MEASURED FROM THE LEADING EDGE OF THE DOOR.
5. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED:
A. INTERIOR DOORS - 5 lbs.
B. EXTERIOR DOORS - 8.5 lbs.
C. FIRE DOORS - 15 lbs.
8. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR PIPING, DUCTS, CONDUIT, ETC. SHALL BE
SEALED WITH A UL APPROVED METHOD AND MATERIAL.
1 HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION.
2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO MEET APPROVAL OF CODE AGENCIES. COORDINATE DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE COR RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING THE PRE-CONSTRUCTION WALK THROUGH.
4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR PENETRATIONS LEFT BY THE REMOVAL, INSTALLATION OR CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF THE
WALL, FLOOR, AND/OR ROOF ASSEMBLY.
5. THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-WAY OF THE PROJECT SITE WILL BE IMPACTED BY CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE WITH THE LATEST OSHA REQUIREMENTS. COORDINATE CONTRACTOR STAGING AREA AND PUBLIC
ACCESS WITH COR PRIOR TO CONSTRUCTION. PROTECT SIGNAGE WITHIN PROJECT AREA.
6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND DEMOLITION FOR RELATED DEMOLITION WORK.
7. SEE DRAWINGS FOR ADDITIONAL PROJECT RELATED UTILITY & DEMOLITION WORK AND PROJECT PHASING NOTES. COORDINATE UTILITY SYSTEM SHUTDOWNS WITH COR.
1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING SPECIFICATION MANUAL
FOR NEW WORK AND THE MPI MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR
REPAINTING WORK.
2. PAINTING WORK: INCLUDES TAPING, SURFACE PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD PAINTING AND FINISHING AS REQUIRED BY STANDARD PRACTICE, MANUFACTURER OR
SPECIFICATION. REQUIRED COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP PRIMING, SURFACE
TREATMENT AND FINISHING. THE WORK ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF
OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS MAY REQUIRE OTHER TYPES OF
PAINTING, INCLUDING, BUT NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND FACTORY
PRIMING.
3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED OTHERWISE, CONTRACTOR IS TO FIELD PAINT
INTERIOR AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES, WHETHER OR NOT
PREVIOUSLY PAINTED, AND ALL NEW ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL AND EXPOSED PIPING AND FITTINGS
(INCLUDING IRON AND PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE SHALL BE SEALED,
UNLESS NOTED OTHERWISE OR NOT RECOMMENDED BY MANUFACTURER. PAINTING SCOPE ITEMS
MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS, SPECIFICATIONS AND PAINTING GENERAL NOTES.
THESE SOURCES ARE COMPLEMENTARY, NOT MUTUALLY EXCLUSIVE.
4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD PAINTING OF INTERIOR AND EXTERIOR
EXPOSED PIPES, DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND PRIMED METAL
SURFACES OF EQUIPMENT IN EXPOSED AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL
WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF ELECTRICAL AND MECHANICAL WORK IN
ELECTRICAL AND MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED OTHERWISE IN THE
PROJECT MANUAL. COLOR-CODING OF PIPING FOR MECHANICAL AND PLUMBING WORK IS COVERED
IN THE MECHANICAL OR PLUMBING SPECIFICATIONS.
5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT AN EDGE, CORNER, CHANGE OF
MATERIALS OR CHANGE OF PAINT COLOR. COMPLETED PAINTING SHALL NOT IMPEDE THE INTENDED
OPERATION OF ANY ITEM, SUCH AS WINDOWS, DRAWERS, HINGES, DOORS, ETC.
6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA ON ONE SURFACE IS LARGER
THAN 1 SQUARE FOOT, OF IF TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE ENTIRE
SURFACE SHALL BE REPAINTED TO ENCLOSING EDGES OR CORNERS.
7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND EQUIPMENT, PRE- FINISHED MECHANICAL AND ELECTRICAL EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS, LIGHTING FIXTURES, SWITCHGEAR, MOTORS, DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO PAINT AN ITEM OR SURFACE, FOLLOW
PROCEDURES LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).
8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT METAL
SURFACES OF ANODIZED ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE, COPPER, BRASS, BRONZE AND SIMILAR FINISHED MATERIALS.
9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT SURFACES SUCH AS
WALLS AND CEILINGS IN CONCEALED AND GENERALLY INACCESSIBLE AREAS, INCLUDING FURRED
AREAS, UTILITY TUNNELS, PIPE SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL
CONCRETE IN PIPE SPACE.
10. OPERATING PARTS AND SENSING DEVICES: UNLESS OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF OPERATING UNITS SUCH AS VALVES, DAMPER OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT SENSING OR EMITTING DEVICES THAT MIGHT NOT FUNCTION PROPERLY IF
PAINTED.
11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-REQUIRED LABELS.
12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT COMPLETION OF WORK. NO EPOXY PAINT.
1. THE PRIMARY OBJECT OF APPLYING SEALANT IS TO FACILITATE WEATHER TIGHTNESS AT THE
EXTERIOR BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR WET\DAMP LOCATIONS.
PROPER PRIMING MUST BE USED WITH SEALANTS.
2. THE PRIMARY OBJECT OF APPLYING CAULKING IS TO ENHANCE APPEARANCE AND FINISH AT INTERIOR APPLICATIONS AND IN SOME SITUATIONS TO REDUCE AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER PENETRATIONS (FIRE CAULKING) AND TO DECREASE SOUND TRANSMISSION THROUGH WALLS AND CEILINGS. OTHER USES MAY BE NOTED IN THE SPECIFICATIONS AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING SHOULD BE USED, FOLLOW PROCEDURES
LISTED IN SECTION 01 33 23.
3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED) SHALL BE USED AT HORIZONTAL AND
VERTICAL CONCRETE JOINTS AND AS NOTED.
4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION JOINT MATERIAL, AS REQUIRED, SHALL
BE USED AT MASONRY AND CONCRETE CONTROL JOINTS.
5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF SEALANT BETWEEN PERIMETER SOLE
PLATES AND FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR THRESHOLDS IN SEALANT
UNLESS NOTED OTHERWISE.
6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND BOTH SIDES OF DOOR FRAMES.
7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND INTERIOR WALL MOUNTED
EQUIPMENT FRAMES AND EXPOSED SUPPORTS.
8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS BETWEEN DIFFERENT WALL MATERIALS
(TILE TO BRICK, CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL TO P-LAM, ETC).
9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL GAPS OR 1/16TH INCH OR MORE.
10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS THROUGH, FLOORS AND WALLS.
11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND CEILING PIPE PENETRATIONS. WHERE
ESCUTCHEONS ARE SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A BED OF SEALANT.
12. USE SPECIFIED CAULK OR SEALANT AROUND PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS, LIGHTING, VENTS, ETC.
PHASE 1:
PHASING NOTES:
1. SUBMIT AND OBTAIN APPROVALS FOR ALL
PRECONSTRUCTION SUBMITTALS.
2. SUBMIT AND OBTAIN APPROVALS ALL SUBMITTALS AND
COORDINATION DRAWINGS.
3. END OF PHASE 1.
PHASE 2:
TEMPORARY EMERGENCY DEPARTMENT MODULAR BUILDING &
ELEVATORS.
1. CONTRACTOR SHALL ACQUIRE THE RENTAL OF A
TEMPORARY EMERGENCY DEPARTMENT MODULAR
BUILDING & TEMPORARY ELEVATORS PER THE PROVIDED
DIAGRAMS IN THE CONTRACT DOCUMENTS.
2. PREPARE SITE TO RECEIVE TEMPORARY EMERGENCY
DEPARTMENT MODULAR BUILDING & ELEVATORS.
3. INSTALL TEMPORARY EMERGENCY DEPARTMENT MODULAR
BUILDING & ELEVATORS.
4. COMMISSION TEMPORARY EMERGENCY DEPARTMENT
MODULAR BUILDING& ELEVATORS .
5. TURN OVER TEMPORARY EMERGENCY DEPARTMENT
MODULAR & ELEVATORS TO VA FOR INSTALLATION OF FFE.
6. ALLOW 21 DAYS BETWEEN PHASE 2 & PHASE 3.
7. DO NOT MOVE ON TO PHASE 3 WITHOUT WRITTEN
PERMISSION FROM CO AND COR.
PRECONSTRUCTION PHASE
PHASE 3:
OBSERVATION BED RENOVATION & AHU REPLACEMENT.
1. RENOVATE OBSERVATION BED AREA.
2. INSTALL TEMPORARY AHU AND DUCTS.
3. REMOVE EXISTING AHU & TERMINAL UNITS.
4. INSTALL NEW AHU & NEW TERMINAL UNITS.
5. COMMISSION EXISTING AND NEW SYSTEMS.
6. TURN OVER RENOVATED AREA BACK TO VA FOR
INSTALLATION OF FFE.
7. ALLOW 21 DAYS BETWEEN PHASE 3 & PHASE 4.
8. DO NOT MOVE ON TO PHASE 4 WITHOUT WRITTEN
PERMISSION FROM CO AND COR.
PHASE 4:
SITE RESTORATION.
1. DISCONNECT UTILITIES FROM TEMPORARY EMERGENCY
DEPARTMENT MODULAR BUILDING & TEMPORARY
ELEVATORS.
2. REMOVE MODULAR BUILDING AND TEMPORARY ELEVATORS
FROM SITE.
3. REMOVE UTILITIES BACK TO SOURCES.
4. RESTORE SITE, PARKING LOT, RAILINGS, PLANTING AREAS
BACK TO ORIGINAL STATES.
4 MONTH WARRANTY WALK-THRU
9 MONTH WARRANTY WALK-THRU
PROJECT COMPLETE
Revisions: Date:
/11
EMERGENCY
EYEWASH
M
IN
6'
-8
M
IN
2'
-3
DIMENSION TO BOTTOM OF
KNEE SPACE
DIMENSION TO SPRAY HEAD
M A
X
3' -0
" M A
X 4'
-0
EMERGENCY
EYEWASH / SHOWER
DIMENSION TO
SPRAY HEAD
RECESSED OR SURFACE
MOUNTED F.E. CABINET
M A
X R
E A
C H
4' -0
" M A
X 5'
-0
M A
X
3' -3
ACCESSIBLE
ROBE HOOK
TOILET PAPER
HOLDER
TOILET
SANITARY
NAPKIN
DISPOSAL
N C
GRAB BARS
WALL
LAVATORY PAPER TOWEL
DISPENSER
SOAP DISPENSER
MIRROR, CENTER
OVER LAV
DIMENSION TO
COIN OPERATOR
SANITARY
NAPKIN
VENDOR
DIMENSION TO
BOTTOM OF
KNEE SPACE
DIMENSION
TO SPOUT
ELECTRIC
WATER
COOLER
TOWEL BAR
MIN
4'-0"
2' -1
2' -4
2' -9
M
IN
'-0
M
A X
4" 1'
-6
C L
C L
1' -6
3'-6" 1'-0"
2' -1
0"
MIN.
1'-6"
3' -5
3' -1
1"
C L
3' -7
M
IN
2'
-4
M A
X
3' -1
M A
X 4'
-0
CL CL
CL
C L
9" MAX
7" MIN
NOTE:
VERIFY ACCESORIES WITH TOILET SIZE
CL
5' -5
C L
ROBE HOOK
3'-4"
8"
1'-0"
GRAB BARS
3'-0" @ STF TLT
2'-0"
1' -6
2' -9
M
IN
'-0
M
A X
C L
16" MIN, 18" MAX
CL
1'-0" MIN.
CL
3'-0" CL
CLCL
SWING UP GRAB BAR,
OMIT AT STF TLT
2' -1
1"
C L
MIN.
1'-6"
1"
MARKER BOARD OR TACK
BOARD, 36" HIGH OR
HIGHER
TEMPERED GLASS MIRROR
WITH FRAME
MARKER BOARD OR TACK
BOARD, LESS THAN 36"
HIGH
7' -0
6' -0
M
IN
6' -2
1'-6"
(2) COAT HOOKS
ON PLAM STRIP
4' -6
C L
M A
X 4'
-0
C L
1'' BETWEEN CRASH RAILS
AND CORNER GUARD OR
DOOR FRAME
CRASH RAIL
CORNER GUARD
CRASH RAIL
PROTECTIVE WALL
COVERING
VERIFY W/
OWNER'S
FURNITURE 1'' BETWEEN HAND RAILS
AND CORNER GUARD OR
DOOR FRAME
CHAIR RAIL
CHAIRS (NIC)
HAND RAIL
CORNER GUARD
1' -0
3' -0
2' -6
2' -1
0"
C L
ADA AUTOMATIC DOOR
PUSH PAD
ROOM SIGNAGE MOUNT ON
LATCH SIDE OF DOOR
5' -0
2"
3' -4
C L
C L
COORDINATE LOW VOLTAGE AND HIGH VOLTAGE INSTALLATION WITH HARDWARE REQUIREMENTS. HARDWARE
INSTALLER TO CERTIFY POWER SOURCE IS SIZED FOR LEAF SIZE AND WEIGHT.
ENSURE ACCESSIBLE OPERATION IS ON UPS AND EMERGENCY POWER
1' -3
HEADWALL LEGEND
N POWER RECEPTACLE (NORMAL POWER)
C RED POWER RECEPTACLE (EMERGENCY POWER)
O OXYGEN
A MEDICAL AIR
V VACUUM
B BLANK
PH PHONE JACK
NC NURSE CALL
O
CB
AV
OAV
PH
C
B
C
C
CB
N
N
NC
O
CB
AV
OAV
PH
C
B
C
C
CB
N
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
A u to d e s k D o c s /5
-1
-2
E x p a n d
E D
B e d s
/5
-1
-2
.O P
C .A
R C
H .r v t
/2
/2
:4
:3
P
M
G-050
GENERAL TYPICAL FIXTURE MOUNTING
HEIGHTS
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
09/11/2022 M. PERKINS N.
BLANCHARD
ISSUED FOR
CONSTRUCTION
1/4" = 1'-0" D6
TYPICAL EMERGENCY FIXTURES MOUNTING HEIGHTS
1/4" = 1'-0" B4
TYPICAL FIXTURE MOUNTING HEIGHTS
1/4" = 1'-0" C6
TYPICAL WALL MOUNT EQUIPMENT MOUNTING HEIGHTS
*NOTE NOT ALL ITEMS ARE USED. SEE FLOOR
PLANS AND ELEVATIONS FOR EQUIPTMENT .
1/4" = 1'-0" B2
TYPICAL WALL PROTECTION MOUNTING HEIGHTS
1/4" = 1'-0" D4
TYPICAL SIGNAGE MOUNTING HEIGHTS
3/8" = 1'-0"
D9
TYPICAL HEADWALL DETAIL
Revisions: Date:
/11
E
N
F
F
E
N
S
S
S
S
F
DN
LIFE SAFETY SYMBOLS
XX PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES REFER
TO SCHEDULE)
FIRE ALARM PULL
EXIT LIGHTING
XXX
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHERS
FIRE HOSE CABINETS
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
WIDTH PROVIDED
P: XX"
R: XX" 1A
WIDTH REQUIRED
APPLICABLE BUILDING CODES
• 2018 NFPA 101 LIFE SAFETY CODE & 2016 NFPA 72 NATIONAL FIRE ALARM AND
SIGNALING CODE & 2016 NFPA 13 STANDARD FOR INSTALLATION OF SPRINKLER
SYSTEMS. EXCEPTION OF NFPA 5000 AND NFPA 900
• 2018 INTERNATIONAL MECHANICAL CODE (IPC)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2017 NATIONAL ELECTRICAL CODE (NEC)
• 2018 INTERNATIONAL PLUMBING CODE (IPC)
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN
CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF
STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW
FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS
AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:
MEMORANDUM OF UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL,
ENERGY, AND TRANSPORTATION MANAGEMENT
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE
GENERAL REQUIREMENTS SECTION 01 00 00 AND 01 35 26 OF THE VA MASTER
CONSTRUCTION SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD
62.1-2016; MEDICAL SPACES - ASHRAE 170-2013, NON-MEDICAL SPACES -
ASHRAE 62.1-2016
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD
15–2013
• 2018 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED BY VA
STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE STANDARD OR CODE
SHALL BE USED
APPLICABLE BUILDING GUIDES
• VA FIRE PROTECTION DESIGN GUIDE, 7TH EDITION (2015)
BUILDING CODE DATA
CONSTRUCTION TYPE:
TYPE III (200) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: RECONSTRUCTION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS:
STRUCTURAL FRAME 0 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 0 HOURS
ROOFS/ CEILINGS 0 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1/2 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS
MEDICAL GAS / HAZARDOUS
STORAGE 1 HOURS
CLASSIFICATION OF OCCUPANCY:
EXISTING: AMBULATORY HEALTH CARE Occupancy per Chapter 20.
EXISTING: HEALTH CARE Occupancy per Chapter 18/19 18/19.1.1.4.2 (3) Changes of Occupancy. A change from a hospital or nursing home to an ambulatory health care occupancy shall not be considered a change in occupancy or occupancy subclassification.
18/19.1.1.4.3 REHABILITATION (1) MAJOR REHABILIATION SHALL INVOLVE THE
MODIFICATION OF THAN 50%, OR MORE THAN 4500 FT2, OF THE AREA OF THE
SMOKE COMPARTMENT.
MIXED BUILDING OCCUPANCY TYPE:
PRIMARY - HEALTHCARE
SECONDARY - AMBULATORY HEALTH CARE OCCUPANCY
6.1.14.1.3 Where incidental to another occupanct, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) Mercantilre, BUSINESS, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or stucture, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section
8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
18.2.6.2.1 The travel distance between any point in a room and an exit shall not exceed 150 ft.
18.2.6.2.2 The maximum travel distance...shall be permitted to be increased by 50 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.
HEALTH CARE OCCUPANCY; PROTECTED = 200'-0"
OCCUPANT LOAD:
18.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
CALCULATED OCCUPANT LOADS
PROJECT AREA = 90 TOTAL OCCUPANTS
MEANS OF EGRESS:
18.2.3 Capacity of Means of Egress.
18.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.
18.2.3.2 The clear width of any corridor or passageway required for exit access shall not be less than 44 in. (1120 mm).
18.2.4 Number of Means of Egress.
18.2.4.3 Not les than two exits of the types described in 18.2.2 shall be accessible from each smoke compartment.
18.2.4.4 Egress from smoke compartments addressed in 18.2.4.3 shall be permitted through adjacent compartments provided that the two required egress paths are arranged so that both do not pass through the same adjacent smoke compartment.
PROTECTION OF VERTICAL OPENINGS:
18.3.1 Protection of Vertical Openings.
18.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
18.3.2 Protection from Hazards.
18.3.2.1 Hazardous Areas
18.3.2.1.1 Any hazardous areas shall be protected in accordance with Section 8.7, and the areas addressed in 18.3.2.1.2 and 18.3.2.1.3 shall be protected as indicated.
18.3.2.1.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:
(1) Boilder and fuel-fired heater rooms
(2) Central/bulk laundries larger than 100 ft2
(3) Paint Shops
(4) Physical plant maintenance shops
(5) Rooms with soiled linen in volume exceeding 64 gal
(6) Rooms with collected trashed in volume exceeding 64 gal.
(7) Storage rooms larger than 100 ft2 and storing combustible material
18.3.2.1.3The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:
(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.
(2) Storage rooms larger than 50ft2 but not exceeding 100 ft2 and storing combustible material.
18.3.2.4 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.
18.3.5.12 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
ENERGY CODE REQUIRMENTS:
CLIMATE ZONE 3B.
WALLS, ABOVE GRADE:
METAL FRAMED: R-13 + R-7.5CI
BOPC.1
A
BOPC.2 BOPC.3 4 5 65.A
A.1
B
B.1
C
D
E
BOPC.F
BOPC.G
CLINICAL
CHARTING
RM
B1C29B1C29
LOCKER
RM
B1C20AB1C20A
AREAWAY
103103
ELEVATOR
B-19B-19
VESTIBULE
106106
SOCIAL
WORK
OFFICE
B1C01B1C01
LINEN
CART
ALCOVE
TRANSFORMER
RM
B1C17AB1C17A
ON-CALL
RM
B1C18B1C18TOILET
B1C19B1C19
STAFF
LOUNGE
B1C20B1C20
STAIR
B1C21B1C21
TOILET
B1C08B1C08
TRAUMA
RM
SMALL
B1C06B1C06
TRAUMA
RM
LARGE
B1C07B1C07
X-RAY
ALCOVE
118118
CORRIDOR
B1C-4B1C-4
ELECTRIC
CLOSET
B1C16B1C16 TELEPHONE
CLOSET
B1C15B1C15
OBSERVATION/
TREATMENT
RM
B1C11B1C11
ENTRANCE
INTERVENTION
(SECLUSION)
ROOM
B1C28B1C28
TRIAGE
RM
B1C31B1C31
AOD/
CHECK-IN
B1C30B1C30
MECHANICAL
ROOM
B1C17B1C17
LINEN
CLOSET
B1C41B1C41
LINEN
CLOSET
B1C42B1C42
STAIR
NO.4
B1C43B1C43
ELEVATOR
EQUIP
RM
B1C40B1C40
LINEN
CLOSET
B1C39B1C39
CHIEF
OF ER
B1C35B1C35
HEAD
NURSE
B1C37B1C37
EMS
CLOSET
B1C36B1C36
CORRIDOR
B1C-1B1C-1
WAITING
B1C-1B1C-1
MALE
RR
B1C33B1C33
FEMALE
RR
B1C32B1C32
ELEVATOR
S-5S-5
PATIENT
COMFORT
ROOM
BC127BC127
CHARTING
ALCOVE
POLICE
DISPATCH
B1C02B1C02
CORRIDOR
B1C-5B1C-5
OBSERVATION/
TREATMENT
RM
B1C10B1C10
ELEV.
EQUIP/
SUMP
178178
OBSERVATION/
TREATMENT
RM
B1C12B1C12
OBSERVATION/
TREATMENT
RM
B1C13B1C13
OBSERVATION/
TREATMENT
RM
B1C09B1C09 OBSERVATION/
TREATMENT
RM
B1C14B1C14
C O
R R
ID
O
R B
C
-2 B
C
-2
PROCEDURE
RM
B1C05B1C05
WHEELCH.
SCALE
EXAM
AREA
B1C04B1C04
EXAM
AREA
B1C03B1C03
999 SF
651 SF
255 SF
181 SF
119 SF
177 SF
7126 SF
389 SF
178 SF
3500 SF
927 SF
VESTIBULE
154 SF
AREA TO BE RENOVATED
2,452 GSF
Occupancy Classification
(NFPA) HEALTH CARE
(NFPA) INDUSTRIAL
SMOKE COMPARTMENT 1
8,355 GSF
SMOKE COMPARTMENT 1
8,355 GSF
AREA TO BE RENOVATED
2,452 GSF
NEW
OBSERVATION
ROOM
B1C34KB1C34K
NEW
NURSES
STATION
B1C34FB1C34F
PAT TLT
B1C34JB1C34J
NEW
OBSERVATION
ROOM
BC24BC24
NEW
OBSERVATION
ROOM
B1C23B1C23
NEW
OBSERVATION
ROOM
B1C21B1C21
HAC
BC50BC50
SOILED
UTILITY
B1C53B1C53
CORRIDOR
B1C-9B1C-9
NURSE
STATION
B1C29AB1C29A
CORRIDOR
B1C-1AB1C-1A
SMOKE COMPARTMENT 2
7,263 GSF
OPC BUILDING 1
ELEVATOR
S-6S-6
B1
B1
B3
B12
SMOKE COMPARTMENT 2
7,263 GSF
B17
B17
B17
B17
B8
B10 B7
B6
B6
B6
B5
B4
B9
B19
B13B14
B15
CLEAN
UTILITY
B1C52B1C52
STF TLT
BC51BC51
P : 5
1/ 2"
R : 3
0"
P: 6' - 11" R: 3' - 0"
P : 6
R
: 3
0"
P : 2
1/ 2"
R : 3
0"
P : 3
1/ 2"
R : 3
0"
P: 3' - 8 1/2" R: 3' - 0"
P : 3
1/ 2"
R : 3
0"
P: 5' - 8" R: 3' - 0"
P: 7' - 8" R: 3' - 0"
CT
SCANNER
B1C46B1C46
EQUIP
STOR
B1C44B1C44
CONTROL
ROOM
B1C45B1C45
PAT
HOLDING
B1C47B1C47
HAC
B1C49B1C49
C O
R R
ID
O
R B
C
B C
PAT TLT
B1C25AB1C25A
CLEAN
UTILITY
BC26BC26
F E
C
FEC
F E
C
FE
F E
C
IPC TABLE 403.1
Classification Description
Water Closets Lavatories
BathTubs /Showers
Drinking Fountain OtherMale Female Male Female
Business
Buildings for the Transaction of business, professional services, other services involving merchandise, office buildings, banks, light industrial and similar uses
1 per 25 for the first 50 and 1 per 50 for the remainder exceeding 50
1 per 40 for the first 80 and 1 per 80 for the remainder exceeding 80
- 1 per 100 1 service sink
90 Occupants -
Required 3 3 - 2
Providing 3 2 2 2 2 2 1 service sink
1 service sink
Unisex
Unisex
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
A u to d e s k D o c s /5
-1
-2
E x p a n d
E D
B e d s
/5
-1
-2
.O P
C .A
R C
H .r v t
/1
/2
:3
:5
A
M
G-101
GENERAL LIFE SAFETY PLAN AND CODE DATA
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
09/11/2022 M. PERKINS C. LOWERY
ISSUED FOR
CONSTRUCTION
1/8" = 1'-0" F2
GENERAL CODE AND LIFE SAFETY PLAN - BASEMENT
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
HATCH PATTERNS.
Path ID Travel Distance
B1 96' - 3"
B3 5' - 6"
B4 6' - 2"
B5 49' - 8"
B6 123' - 5"
B7 33' - 6"
B8 28' - 7"
B9 92' - 1"
AREA SCHEDULE (occupancy area)
Area Style - occupancy classifications AREA SPACE USE
SF PER
OCCUPANT
OCCUPANCY
LOAD
CAPACITY
FACTOR -
STAIRWAYS
REQUIRED
STAIRWAY
WIDTH
CAPACITY
FACTOR - OTHER
REQUIRED
WIDTH - OTHER COMMENTS
00_BASEMENT_OPC
(NFPA) HEALTH CARE 10,221 SF Ambulatory health care 150 SF 74 0.3" 22.2" 0.2" 14.8"
(NFPA) HEALTH CARE 409 SF Business Use: (other than - Air traffic control tower observation levels) 150 SF 4 0.3" 1.2" 0.2" 0.8"
(NFPA) HEALTH CARE 0 SF In other than storage and mercantile ccupancies 500 SF 0 0.3" 0.0" 0.2" 0.0"
(NFPA) INDUSTRIAL 3,620 SF Special-purpose industrial 0 0.3" 0.0" 0.2" 0.0" N/A Refer to NFPA Occupant Load Factor table: 7.3.1.2
(NFPA) HEALTH CARE 999 SF Waiting spaces 100 SF 10 0.3" 3.0" 0.2" 2.0" Refer to NFPA 12.1.7.2 and 13.1.7.2
15,248 SF 88 26.4" 17.6"
Path ID Travel Distance
B10 4' - 11"
B12 43' - 11"
B13 72' - 2"
B14 44' - 3"
B15 93' - 1"
B17 273' - 9"
B18 234' - 0"
B19 47' - 3"
Revisions: Date:
/11
E
N
F
DN
BOPC.1
A
BOPC.2 BOPC.3 4 5 65.A
A.1
B
B.1
C
D
E
BOPC.F
BOPC.G
CLINICAL
CHARTING RM
B1C29B1C29
LOCKER RM
B1C20AB1C20A
AREAWAY
103103
Elevator B-19B-19
VESTIBLUE
SOCIAL WORK
OFFICE
B1C01B1C01
LINEN CART
ALCOVE
TRANSFORMER
RM
B1C17AB1C17A
ON-CALL RM
B1C18B1C18
TOILET
B1C19B1C19
STAFF
LOUNGE
B1C20B1C20
STAIR
B1C21B1C21
TOILET
B1C08B1C08
TRAUMA RM
SMALL
B1C06B1C06
TRAUMA RM
LARGE
B1C07B1C07
X-RAY
ALCOVE
B1C07AB1C07A
CORRIDOR
B1C-4B1C-4
ELECTRIC
CLOSET
B1C16B1C16 TELEPHONE
CLOSET
B1C15B1C15
OBSERVATION/
TREATMENT
RM
B1C11B1C11
ENTRANCE
TRIAGE RM
B1C28B1C28
TR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .