Summary

This is a Request for Documented Quotes (DQ) issued by the State of Colorado, Department of Natural Resources, on behalf of the Colorado Division of Parks and Wildlife (CPW), for the management of Aquatic Nuisance Species (ANS) boat inspection and decontamination stations at Green Mountain Reservoir within the White River National Forest. The project involves operating three boat ramp inspection stations—Heeney Marina, McDonald Flats, and Big Green—with varying operational schedules from May 22 through September 30, 2015. Heeney Marina and Big Green will operate from 7:00 AM to 7:00 PM daily throughout the season, while McDonald Flats will open June 16 and operate on the same schedule. The contractor must ensure all supervisors and inspectors obtain state certification as authorized agents in both inspection and decontamination prior to beginning work. The submission deadline was May 12, 2015 at 1:00 PM MST, with project award estimated for May 18, 2015, and project commencement on May 22, 2015. The contract term runs through December 30, 2015, with no renewal options specified.

Compensation will be provided on a time and materials basis according to the budget submitted by the contractor. The contractor must maintain a quality control rating of 70% or better throughout the season and submit monthly activity logs and data reports. Key responsibilities include hiring and supervising all staff, maintaining state certifications for all employees, operating decontamination units, managing equipment provided by CPW (including securing storage facilities), and conducting public education about aquatic invasive species. The contractor must maintain specified insurance coverage including worker's compensation, general liability ($1,000,000 limits), and automobile liability ($1,000,000 limits), with the State named as an additional insured. Equipment expenses are reimbursable, and the contractor is responsible for arranging temporary shelters for offices and equipment storage at each station. All monthly reports and documentation must be submitted to CPW's program office, and any mussel detections must be reported immediately to designated CPW staff.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR DOCUMENTED QUOTES

Management of the ANS Boat Inspection and Decontamination Stations of Green

Mountain Reservoir within the White River National Forest.

For the Division of Colorado Parks and Wildlife

DQ PMAA 2015001355

OVERVIEW

Issuing Office This Request for Documented Quotes (DQ) is issued by the State of Colorado, Department of Natural Resources, on behalf of the Colorado Division of Parks and Wildlife (CPW). All contact regarding this solicitation is to be directed to:

Brenda Hannu Department of Natural Resources Purchasing Office 1313 Sherman #423 Denver, CO 80203

(303) 866-3292 x8625 Fax: (303) 866-5575 Email: brenda.hannu@state.co.us

Purpose The purpose of this Request for Documented Quotes is to obtain competitive proposals from qualified individuals and firms for the Management of the ANS Boat Inspection and Decontamination Stations of Green Mountain Reservoir within the White River National Forest. The goal is to protect these reservoirs from Aquatic Nuisance Species (ANS) introductions, specifically zebra and quagga mussels, by inspecting trailered watercraft prior to entering and exiting the reservoir and decontaminating those watercraft that are observed to have “high risk standing water” or suspect/known ANS attached, according to State ANS Protocols.

Schedule of Activities:

Activity Date Time DQ posted on the Colorado Vendor Self-Service System

5/4/2015

Inquiry deadline for written questions 5/7/2015 1:00 p.m. MST Answers posted on Colorado Vendor Self-Service System

5/8/2015

Submission deadline 5/12/2015 1:00 p.m. MST Evaluation of Proposals (estimated) 5/13/2015 Project Award (estimate) 5/18/2015 Project start date 5/22/2015

Inquiries Prospective proposers may make written inquiries concerning the DQ1 to obtain clarification of requirements. No inquiries will be accepted after the date and time specified in the Schedule of Activities, “Inquiry deadline for written questions”.

Questions must be submitted in writing via email as an attachment that can be opened by Microsoft Word 2007. Please use the bid number in the subject line of your email and include your name, company name, address and contact information. Inquiries sent by fax will not be accepted. Send questions to Brenda Hannu at the contact information above.

An amendment will be posted on the Colorado Vendor Self-Service System, see below.

The amendment will respond to all questions submitted regarding the DQ1.

Amendments to Request for Documented Quotation In the event it should be necessary to revise any portion of this Request for Documented Quotation addenda will be posted on the ColoradoVSS website.

Bid Due Date The bid due date for this submittal of documented quotations is May 12, 2015 at 1:00 p.m. MST.

Bids will be accepted by mail, hand-carried or via email as a Word or .pdf file attachment, and must be sent to the Department of Natural Resources Purchasing Agent.

A responsive bid must include the submittal items outlined below under SUBMITTAL.

Hardcopy Submittals: Each submittal shall consist of one original (identified as such) and 3 copies of the consultant’s complete documented quotations (for a total of four [4] proposals) and include all submittal information outlined in the solicitation. It is the responsibility of the proposer to ensure that the quotation is received in the Procurement Office, prior to the deadline. Consultants mailing submittals should allow ample mail delivery time to ensure timely receipt of their quotations. Submissions received after the above date and time will not be considered!

Quotations must be clearly identified as a quotation for the DNR DQ1 PMAA 2015001355 and shall show such information on the outside of the documented quotation packet. Quotations will not be accepted by facsimile transmittal.

Email Submittals: Email submittals must be received prior to the bid due date and must include the bid number, DQ1 PMAA 2015001355 in the subject line of the email.

Bids may be submitted in adobe or Word format.

Colorado Vendor Self-Service Website

This solicitation is published using the Colorado Vender Self-Service System on the internet. Solicitation documents and information (including any amendments or modifications) will be updated with revisions on this site. Go to the Colorado VSS System at:

https://codpa-vss.hostams.com/webapp/PRDVSS1X1/AltSelfService.

Vendors can self register for this system free of charge, or click on Public Access in order to view documents and modifications without registering. Vendors are https://codpa-vss.hostams.com/webapp/PRDVSS1X1/AltSelfService encouraged to register prior to or at the same time as they submit their Proposal.

Search for the DQ Number (DQ1 2015001355)

Colorado Purchase Order/Contract A Purchase Order Contract will be issued to the awarded bidder. The Purchase Order Contract will include all documents associated with the bid including this Request for Documented Quotation, the bidder’s response and the Colorado Purchase Oder Terms and Conditions/Model Contract, which are attached to this solicitation.

Project Duration Project will terminate on or before 12/30/2015.

Measurement and Payment Payment for the project will be a time and materials based on the budget submitted.

Insurance Requirements Contractor and its Subcontractors shall obtain and maintain insurance as specified in this section at all times during the term of this Contract. All policies evidencing the insurance coverage required hereunder shall be issued by insurance companies satisfactory to the State.

Contractor Public Entities. If Contractor is a "public entity" within the meaning of the Colorado Governmental Immunity Act, CRS §24-10-101, et seq., as amended (the “GIA”), then Contractor shall maintain at all times during the term of this Contract such liability insurance, by commercial policy or self-insurance, as is necessary to meet its liabilities under the GIA. Contractor shall show proof of such insurance satisfactory to the State, if requested by the State. Contractor shall require each contract with a Subcontractor that is a public entity, to include the insurance requirements necessary to meet such Subcontractor’s liabilities under the GIA.

Non-Public Entities. If Contractor is not a "public entity" within the meaning of the GIA, Contractor shall obtain and maintain insurance coverage and policies meeting these requirements:

Contractors - Subcontractors Contractor and subcontractors shall carry insurance requirements substantially similar to the following:

a) Worker’s Compensation. Worker’s Compensation Insurance as required by State statute, and Employer’s Liability Insurance covering all of Contractor or subcontractor employees acting within the course and scope of their employment.

b) General Liability. Commercial General Liability Insurance written on ISO occurrence form CG 00 01 10/93 or equivalent, covering premises operations, fire damage, independent contractors, products and completed operations, blanket contractual liability, personal injury, and advertising liability with minimum limits as follows: (a) $1,000,000 each occurrence; (b) $1,000,000 general aggregate; (c) $1,000,000 products and completed operations aggregate; and (d) $50,000 any one fire.

c) If any aggregate limit is reduced below $1,000,000 because of claims made or paid, subcontractor shall immediately obtain additional insurance to restore the full aggregate limit and furnish to Contractor a certificate or other document satisfactory to Contractor showing compliance with this provision.

d) Automobile Liability. Automobile Liability Insurance covering any auto (including owned, hired and non-owned autos) with a minimum limit of $1,000,000 each accident combined single limit.

e) Additional Insured. The State shall be named as additional insured on all Commercial General Liability policies (leases and construction contracts require additional insured coverage for completed operations on endorsements CG 2010 11/85, CG 2037, or equivalent) required of Contractor and any subcontractors hereunder.

f) Primacy of Coverage. Coverage required of Contractor and subcontractor shall be primary over any insurance or self-insurance program carried by Contractor or the State.

g) Cancellation. The contractor shall notify the State of any cancellation or non-renewal without at least 30 days prior notice to Contractor and the State by certified mail.

h) Subrogation Waiver. All insurance policies in any way related to this Contract and secured and maintained by Contractor or its subcontractors as required herein shall include clauses stating that each carrier shall waive all rights of recovery, under subrogation or otherwise, against Contractor or the State, its agencies, institutions, organizations, officers, agents, employees, and volunteers.

Certificates Contractor and all subcontractors shall provide certificates showing insurance coverage required hereunder to the State within seven business days of the Effective Date of this Contract. No later than 15 days prior to the expiration date of any such coverage, Contractor and each subcontractors shall deliver to the State or Contractor certificates of insurance evidencing renewals thereof. In addition, upon request by the State at any other time during the term of this Contract or any sub-contract, Contractor and each subcontractors shall, within 10 days of such request, supply to the State evidence satisfactory to the State of compliance with these provisions.

Contractor Evaluation If the maximum amount payable to the winning vendor under this a State contract is $100,000 or greater, either on the Effective Date or at anytime thereafter, this section applies.

Contractor agrees to be governed, and to abide, by the provisions of CRS §24-102-205, §24-102-206, §24-103-601, §24-103.5-101 and §24-105-102 concerning the monitoring of vendor performance on state contracts and inclusion of contract performance information in a statewide contract management system.

Contractor’s performance shall be subject to Evaluation and Review in accordance with the terms and conditions of this Contract, State law, including CRS §24-103.5-101, and State Fiscal Rules, Policies and Guidance. Evaluation and Review of Contractor’s performance shall be part of the normal contract administration process and Contractor’s performance will be systematically recorded in the statewide Contract Management System. Areas of Evaluation and Review shall include, but shall not be limited to quality, cost and timeliness. Collection of information relevant to the performance of Contractor’s obligations under this Contract shall be determined by the specific requirements of such obligations and shall include factors tailored to match the requirements of Contractor’s obligations. Such performance information shall be entered into the statewide Contract Management System at intervals established herein and a final Evaluation, Review and Rating shall be rendered within 30 days of the end of the Contract term. Contractor shall be notified following each performance Evaluation and Review, and shall address or correct any identified problem in a timely manner and maintain work progress.

Should the final performance Evaluation and Review determine that Contractor demonstrated a gross failure to meet the performance measures established hereunder, the Executive Director of the Colorado Department of Personnel and Administration (Executive Director), upon request by the Colorado Department of Natural Resources, and showing of good cause, may debar Contractor and prohibit Contractor from bidding on future contracts. Contractor may contest the final Evaluation, Review and Rating by: (a) filing rebuttal statements, which may result in either removal or correction of the evaluation (CRS §24-105-102(6)), or (b) under CRS §24-105-102(6), exercising the debarment protest and appeal rights provided in CRS §§24-109-106, 107, 201 or 202, which may result in the reversal of the debarment and reinstatement of Contractor, by the Executive Director, upon showing of good cause.

Attachments

• Personal Services Model Contract template

SCOPE OF WORK

Background

Green Mountain Reservoir in the White River National Forest is managed by the U.S.

Forest Service (USFS). The Colorado Division of Parks and Wildlife, (CPW), entered into a partnership with the USFS to implement watercraft inspection and decontamination stations to protect these reservoirs from possible introduction of zebra mussels, quagga mussels, or other ANS.

The stations were operated by the former Colorado Division of Wildlife (DOW) previously, and it is now their intent to have them operated by a private contractor.

CPW is the sole party to this agreement with the Contractor. The contractor(s) will be trained and certified by CPW and will be provided with the necessary authorizations to operate at these reservoirs.

Site Specific Tasks

Staffing and Certification:

Hours of operation for Heeney Marina, McDonald Flats, and Big Green Boat Ramps will be (pending water levels):

Heeney Marina May 22, 2015 – September 30, 2015 7:00 am – 7:00 pm 7 days a week

McDonald Flats June 16, 2015 – September 30, 2015 7:00 am – 7:00 pm 7 days a week

Big Green (Only open when launching at McDonald Flats not available) May 22, 2015 – September 30, 2015

7:00 am – 7:00 pm 7 days a week

Opening and closing dates are pending weather, ice conditions and available funding.

Daily hours of operation will not change during the season. All supervisors and inspectors will be certified to conduct the proper inspections and decontaminations according to the state regulatory procedure by obtaining a valid certification as an authorized agent (in both inspection and decontamination) from CPW prior to beginning work on the boat ramps. State certification training will be provided by CPW prior to opening day, with additional the-job training by CPW Staff the remainder of the first week. The inspection stations must maintain a quality control rating of 70% or better throughout the 2015 boating season.

2015 Operational Plan:

Inspections at Green Mountain Reservoir will follow a similar operational plan to what was implemented by the former DOW from 2009-2011, and the Heeney Marina at Green Mountain from 2012-2014. Consistent with the 2015 State ANS WID Curriculum protocols, trailered and motorized watercraft will be inspected and decontaminated, when necessary, prior to launching at and exiting the reservoirs. The contractor must operate all stations with the capacity and readiness to perform decontamination at any time during open hours.

There are three boat ramps on Green Mountain that must be staffed for inspections – Heeney Marina, Big Green, and McDonald Flats which must be staffed according to the above schedule.

Big Green boat launch is open to launching only at times when water levels are not appropriate for launching at McDonald Flats. When McDonald flats is open – Big Green will be closed to launching of trailered watercraft.

The contractor will be responsible for all hires and schedules to ensure adequate certified staff is on-site while the boat ramps are open to efficiently move boats in and out of the ramp following proper inspection. There will be no change in hours of operation allowed without prior consent of the CPW Invasive Species Coordinator and notification of the USFS.

Equipment expenses are paid to the Contractor on a reimbursable basis only.

Equipment which will be provided by the contractor includes the list of mandatory equipment on Page 14 of the State ANS Handbook (2009).

It is a high priority that temporary offices and secure locations for decontamination unit storage (temporary sheds or trailers) be located at the boat ramps / inspection stations so the inspectors have safe shelters to work in and the public can have a professional office. The CPW will provide decontamination units and data collection devices for each inspection station that must be stored in a secure locked location on-site. It is the contractor’s responsibility to arrange for delivery of these shelters for both staff offices, equipment and decontamination unit storage between opening day and closing day.

Shelter installation will be coordinated with CPW and the USFS. Any sign placement or traffic management changes must be coordinated with both CPW and the USFS prior to implementation. Equipment loaned to the contractor will be inventoried and non-expendable items (traffic cones, decontamination unit, data collection devices, flashlights, cameras, safety vests, step ladders, etc.) returned to the CPW within 14 days of the closing date. The contractor is responsible for replacing any equipment items not returned to CPW upon closing the stations for the season, or 14 days later.

Installation and traffic management will be coordinated with both CPW and the USFS.

The contractor will conduct the hiring and supervision of all inspectors, and the management of the day-to-day operations of the inspections stations. The contractor must have a supervisor on location for the entire term of this contract.

Common Tasks

Contractor Shall:

1. Hire, supervise and schedule all supervisors, inspectors, decontaminators and crew leaders for the watercraft inspection and decontamination stations, which include customer service and educational outreach. Provide the staffing schedules for each ramp monthly to the CPW Invasive Species Coordinator and notify CPW of any changes to those staff schedules.

2. Maintain “Authorized Agent” certification in inspection and decontamination (Stage II) from CPW for all employees, including supervisors, working under the terms of this agreement. The contractor must provide complete contact information for the full time supervisor and the inspectors/decontaminators including mailing address, phone numbers and email addresses.

3. Operate as an Authorized Location and follow all regulatory requirements as specified in the ANS Regulations and the 2015 Official WID Procedures (aka – WID training manual). All employees must attend the in person training and are not eligible for online recertification.

4. Have a Supervisor available to be on site at all times the stations are open and operational.

5. Maintain a level of staffing at the ramps during hours of operation. The ramps are not to be left vacant during the open hours listed above. Hours will not change without written approval from the CPW Invasive Species Coordinator.

6. Not use volunteers, or any individual not certified by the state, to perform inspections or decontaminations, as this is a violation of state regulations.

7. Inspect all trailered and motorized watercraft and decontaminate watercraft as state procedure requires. Follow the 2015 Official WID Procedures explicitly.

8. Accept green seals and receipts from other State Authorized Locations, and issue green seals and receipts on all boats exiting/leaving, according to the state procedure. WY and NM seals with valid receipts should also be accepted according to state WID procedures. All other seals are not recognized as valid proof of prior inspection and/or decontamination, and are prohibited from use, and acceptance, by the Contractor.

9. Monthly log/data reports, and any other completed forms for the prior month are due on the last day of each month to CPW Invasive Species Program at 6060 Broadway, Denver, CO 80216.

10. In the event a boat with adult or settled juvenile mussels is detected, the CPW Program office must be notified immediately via email to Elizabeth.Brown@state.co.us and Robert.Walters@state.co.us and via telephone to the CPW Invasive Species Coordinator at 303-291-7295. All paperwork, photos and samples as outlined in the Colorado ANS mailto:Robert.Walters@state.co.us

Decontamination Manual (Chapter 5 of training curriculum) is the responsibility of the Contractor and must be sent to CPW with 24 hours. It is the contractor’s responsibility to perform the full decontamination on the mussel boat per the Colorado ANS Decontamination Manual protocol.

11. Inform and educate the public about the problems posed by aquatic invasive species and steps that can be taken to prevent their spread.

12. Provide tan shirts or polo shirts, and navy blue baseball hats as required for ANS staff to wear to maintain uniform standards with statewide stations.

13. Participate in monthly conference calls with the CPW Invasive Species Staff for progress and status updates.

14. Provide additional training and an operation manual to all inspectors on the decontamination unit.

15. Maintain and repair all equipment provided by the State for the inspection and decontamination, and return it within 14 days of the reservoir closing date in good working order, including decontamination units and data collection devices.

Notify the CPW Invasive Species Coordinator immediately upon equipment failure and when repair has been completed.

16. Provide a method of emergency communication for the inspection stations.

17. Maintain a link to CPW’s ANS webpage on the contractor’s website.

18. Participate in coordination meetings set up by CPW for all watercraft inspection sites.

19. Be responsible for compliance with all rules and regulations relating to the use, storage, treatment or disposal of hazardous materials, including, but not limited to, chemicals and petroleum products.

20. Immediately notify local CPW law enforcement officers (DWM or AWM) if there is a non-compliant boater or a mussel infested boat.

21. The contractor will be permitted to discharge water produced as part of its decontamination activities in a location approved by the CPW and USFS.

Discharge methods must comply with all local, state, and federal regulations regarding the discharge of water. If such on-site discharge is not available, the contractor will dispose of the produced water at a site and in a manner that complies with all applicable federal, state or local laws.

22. An Annual and Final Report will be provided by the contractor to CPW on or before December 31, 2015. The report must include a complete accounting of the contractor’s in-kind contribution (if any), including other full-time employees contribution.

The Supervisor must complete a quality control form using state standard forms for every employee on staff monthly during the term of this contract (both entrance and exit). Forms must be turned in monthly with activity logs or data reports to the program office at 6060 Broadway, Denver, Co 80216 or scanned and emailed to Elizabeth.Brown@state.co.us.

Information Supplied by the State

CPW Shall:

1. Provide State Watercraft Inspection and Decontamination Certification Training.

2. Supply educational materials (brochures, rack cards and signs) necessary to inform and educate the public about ANS and invasive mussels.

3. Supply all statewide standard forms required for watercraft inspection and decontamination and quality control.

4. Provide one decontamination unit for each boat ramp inspection station to the Contractor that shall be maintained and repaired by the Contractor so it is available for use at any time the stations are open, and provide training and proper documentation the units operations.

5. Provide secret shopper quality control evaluations and on the job training for the contractor’s inspectors. Reports will be distributed to the key personnel for that inspection station.

6. Perform all suspect sample identification and report results to the Contractor.

7. Provide law enforcement support, as needed, to the inspection station.

8. Provide orange safety vests for all employees working at the ANS stations.

All Parties Shall:

1. All responsibility and guideline changes to this Exhibit will be mutually decided between CPW and the Contractor.

2. All communications on procedural changes and approval of operational changes regarding boat inspection station operations, dates, hours and layout at the work sites will go through project contacts for CPW and USFS for that location.

3. Final approval of all changes must be approved by the CPW Invasive Species Coordinator prior to implementation.

Key Personnel

1. The contractor must provide complete contact information for the full time supervisor and the inspectors/decontaminators including mailing address, phone numbers and email addresses.

2. All parties must immediately notify the CPW and USFS key contacts if any Key Personnel changes. Provided there is a good-faith reason for the change, if either party wishes to replace its Key Personnel, CPW and USFS contact will be notified. Such notice shall specify why the change is necessary, who the proposed replacement is, what their qualifications are, and when the change would take effect.

Performance Monitoring

The Invasive Species Program Office will monitor the contract through the following methods:

1. Quality Control Evaluations – Per State Parks regulation#802E, CPW will conduct secret shopper quality control evaluations of the contractor and will report the results to the contractor. There are three types of evaluations that may be performed during the season by CPW (1) secret shopper evaluations, (2) phone inquiries and (3) on the job evaluations. The contractor is expected at a minimum to score passing at 70% or above, but is preferred to maintain an average score of 80% or better to be in “good standing” compliance with statewide procedures, with a score of 90% or better considered excellent.

a. CPW will monitor Contractor’s adherence to the Contract terms to manage Contractor’s quality control and assurance. If quality is not acceptable to CPW, the Contractor will be required to remedy performance to CPW’s satisfaction. If a remedy cannot be agreed upon, the matter will be resolved according to the process set forth below in Section 3.8.

2. Corrective Actions – It is expected that employees who fail a quality control evaluation must be retrained on the job by the Contractor’s Supervisor. If an employee fails 2 quality control evaluations they must retrain with CPW staff. If an employee fails 3 quality control evaluations, they will have their state certification revoked and will no longer be permitted to conduct boat inspections or decontaminations in the State of Colorado for 1 year.

a. CPW will monitor Contractor’s staff performance and reserves the right to require the Contractor to remove project staff from the project for reasons deemed to be in the interest of the State. CPW must provide the Contractor with reasons for which such removal is warranted. Contractor will be required to provide additional resources that will allow the project tasks to be acceptably completed and deliverables to be produced as required.

3. Reporting – Inspection Station Activity Logs will be sent in to the program office monthly and evaluated for accuracy. Paperwork will be monitored for accuracy by CPW staff. Errors in record keeping will be communicated to the contractor.

It is expected that contractor will remedy the error through re-training of staff.

Full decontamination paperwork is due to the Program office with 24 hours.

Failure to send in monthly paperwork or provide notification of a mussel boat full decontamination as outlined in section 3.3 is a violation of this contract.

4. Monthly Meetings – The CPW Invasive Species Program Staff will meet with the Contractor via conference call monthly to monitor the operations.

Noncompliance Resolution

1. CPW and the Contractor shall in good faith endeavor to resolve all controversies concerning the work, work products, or work staff for this project by mutual agreement as expeditiously as possible and within 10 business days after receiving notice of such controversy or issue via direct negotiation and settlement.

2. Initial attempts to resolve shall be sought between the CPW project manager and the Contractor’s lead project staff member.

3. If initial attempts to resolve are not successful, the dispute shall be set forth in writing and submitted for resolution to the CPW Invasive Species Program Staff and appropriate Contractor’s representative(s). If CPW and Contractor’s representative(s) are unable to resolve the dispute to the mutual satisfaction of both Parties within 10 business days, the dispute shall be forwarded for resolution to the CPW Director or designee and Contractor’s corresponding representative (e.g. Owner, VP, President, Account Manager, etc.) If they are unable to resolve the dispute within 10-business days, either Party may pursue other remedies and processes available at law or in equity. If the dispute or some portion thereof is resolved, the resolution shall be reduced to a writing signed by both Parties.

4. If resolution is still not reached, CPW and the Contractor may agree to seek resolution through mediation or non-binding arbitration.

SUBMITTAL

Proposal Format This section describes the information that must be furnished by the proposer and the prescribed format in which it must be presented. The Department of Natural Resources Requests that proposals be submitted that:

• Include recycled paper as much as possible

• Are printed on 8 ½ by 11” paper

• Are bound to facilitate filing; three-ring binders and bulky submittals are not permitted

• Submit One (1) original and three (3) copies of your proposal, along with an electronic copy of your proposal in Word 2003 or 2007 on a flash/thumb drive.

• Proposals must be delivered “sealed” with DQ Number, and Opening Date and

Time on outside of envelope.

Proposal Form/Eligibility to Do Business in Colorado / Location of Project Work

a) The proposing firm must be registered on the Secretary of State’s website in good standing at the time the solicitation is due.

b) Please specify if any work under the contract will take place outside of Colorado or the United States.

c) Resident Bidder Preference. When a contract for commodities or services is to be awarded to a bidder, a resident bidder shall be allowed a preference against a nonresident bidder equal to the preference given or required by the state in which the nonresident bidder is a resident.

d) Service Disabled Veteran Owned Small Businesses (SDVOSBs). SDVOSBs, who are incorporated or organized in Colorado or maintain a place of business or have an office in Colorado and who are officially registered and verified as a SDVOSB by the Center for Veteran Enterprise within the U.S. Department of Veterans Affairs.

(www.vip.vetbiz.gov) , may receive a 5% preference on their bid. This preference applies only to the price, and the SDVOSBs must still meet all other qualifications required in the bid.

SDVOSBs claiming this preference shall submit documentation of SDVOSB certification Issued through the U.S. Department of Veterans Affairs in their response to the solicitation. Bid submissions without this documentation will not be given a preference.

e) Out of state bidder language If the bid or contract price exceeds $500,000 for State Funded projects, the following apply:

a) Colorado statute (§8-19-104 C.R.S.) requires that a comparable percentage disadvantage be applied to a bid from a contractor based in a state that provides a percentage bidding preference. More information is available at www.colorado.gov/spo.

b) A good faith effort must be made by the Contractor to report the use of foreign goods on any public works project. Upon completion of the project, the contractor must report http://www.colorado.gov/spo to the Project Manager the total cost and country of origin for each of the five most costly goods used in the project, (§24-103-210 C.R.S.).

Minimum Requirements

Proposer should have minimum 5 years experience with preparation of NEPA documents, experience with 3-5 projects of similar size, scope and complexity, and project team should include staff, including any required specialist, that have experience in recreation planning and NEPA for linear, multi-agency and multi-use management planning projects.

Qualifications and Experience

• Outline your firm’s experience supervising a boat inspection and decontamination program in Colorado, including customer service experience with the public and experience working with a multi-agency collaboration.

• Provide the name, company and contact information for 3 (three) references.

Approach

Please provide a written description of how direct supervision will occur on site.

Price

Provide a detailed budget that outlines the number of staff members and their anticipated schedules, pay rates, operational expenses, and equipment expenses.

EVALUATION AND AWARD

Evaluation Process and Award Bids will be evaluated on the information submitted by vendor. Award will be based upon the lowest responsive, responsible bidder who can meet the minimum requirements for the required services within the requested timeframe, as judged by the Department of Natural Resources. Any contract that results from this bid shall be subject to the terms of the model construction agreement including the special provisions (attached).

Minimum Requirements

• Minimum requirements will be scored on a pass fail basis.

Qualifications and experience of personnel and partner firms will be evaluated based on the breadth and depth and similarity of project experience.

Qualifications and Experience

• Qualifications and experience will be evaluated based on the breadth and depth and similarity of project experience.

• References will be used to verify projects, and may not be called at all, or may be called only to verify experience of the awarded vendor/contractor.

Project Approach The project approach shall be scored based on detail, completeness and the logic of the sequencing of tasks as well as on the logic of how the site supervision will occur.

Price The best value to the State will be evaluated, based on the total of all bid items.

Contractor and its Subcontractors shall obtain and maintain insurance as specified in this section at all times during the term of this Contract. All policies evidencing the insurance coverage required hereunder shall be issued by insurance companies ...
Contractor
Public Entities. If Contractor is a "public entity" within the meaning of the Colorado Governmental Immunity Act, CRS §24-10-101, et seq., as amended (the “GIA”), then Contractor shall maintain at all times during the term of this Contract such liabi...
Non-Public Entities. If Contractor is not a "public entity" within the meaning of the GIA, Contractor shall obtain and maintain insurance coverage and policies meeting these requirements:
Contractors - Subcontractors
a) Worker’s Compensation. Worker’s Compensation Insurance as required by State statute, and Employer’s Liability Insurance covering all of Contractor or subcontractor employees acting within the course and scope of their employment.
b) General Liability. Commercial General Liability Insurance written on ISO occurrence form CG 00 01 10/93 or equivalent, covering premises operations, fire damage, independent contractors, products and completed operations, blanket contractual liabi...
c) If any aggregate limit is reduced below $1,000,000 because of claims made or paid, subcontractor shall immediately obtain additional insurance to restore the full aggregate limit and furnish to Contractor a certificate or other document satisfactor...
d) Automobile Liability. Automobile Liability Insurance covering any auto (including owned, hired and non-owned autos) with a minimum limit of $1,000,000 each accident combined single limit.
e) Additional Insured. The State shall be named as additional insured on all Commercial General Liability policies (leases and construction contracts require additional insured coverage for completed operations on endorsements CG 2010 11/85, CG 2037...
f) Primacy of Coverage. Coverage required of Contractor and subcontractor shall be primary over any insurance or self-insurance program carried by Contractor or the State.
g) Cancellation. The contractor shall notify the State of any cancellation or non-renewal without at least 30 days prior notice to Contractor and the State by certified mail.
h) Subrogation Waiver. All insurance policies in any way related to this Contract and secured and maintained by Contractor or its subcontractors as required herein shall include clauses stating that each carrier shall waive all rights of recovery, un...

Certificates

Contractor agrees to be governed, and to abide, by the provisions of CRS §24-102-205, §24-102-206, §24-103-601, §24-103.5-101 and §24-105-102 concerning the monitoring of vendor performance on state contracts and inclusion of contract performance info...
Contractor’s performance shall be subject to Evaluation and Review in accordance with the terms and conditions of this Contract, State law, including CRS §24-103.5-101, and State Fiscal Rules, Policies and Guidance. Evaluation and Review of Contractor...
Should the final performance Evaluation and Review determine that Contractor demonstrated a gross failure to meet the performance measures established hereunder, the Executive Director of the Colorado Department of Personnel and Administration (Execut...
Background
Site Specific Tasks
Common Tasks
2. Maintain “Authorized Agent” certification in inspection and decontamination (Stage II) from CPW for all employees, including supervisors, working under the terms of this agreement. The contractor must provide complete contact information for the f...
1. The contractor must provide complete contact information for the full time supervisor and the inspectors/decontaminators including mailing address, phone numbers and email addresses.
2. All parties must immediately notify the CPW and USFS key contacts if any Key Personnel changes. Provided there is a good-faith reason for the change, if either party wishes to replace its Key Personnel, CPW and USFS contact will be notified. Such n...

File details come from the government source that posted it. Updated .