This document is a Request for Information (RFI) for a roof repair project at Building 2902 on Fort Bliss, Texas. The project requires the removal and replacement of an existing Thermoplastic Polyolefin (TPO) roofing system with a new fully adhered 80 mil TPO roofing system, including R-38 insulation and a 5/8-inch glass-mat roof board. A hazardous materials survey is required prior to construction. The RFI requests information from potential contractors on proposed solutions, including any potential cost and schedule impacts. The RFI must be answered no later than the date provided. The contracting office for this project is the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI No.

Date

Contract Title:

Contract No.

RFI Subject:

Prime Contractor: Requested by:

Feature of work

Date

Date

RFI requires answer no later than this date:

Contractor (stakeholder) Signature

COR Signature

Contractor (Stakeholder) Proposed Solution:

REQUEST FOR INFORMATION – REPORT (RFI)

Potentional cost Impact Schedule Impact Other No Cost change

Information Requested by Contractor (Stakeholder):

COR Accepts contractor proposed solution.

COR recommendation below

COR Rejects contractor proposed solution.

COR response to Contractor questions.

______________ Safety accepts proposed solution

______________ NEC accepts proposed solution

______________ Fire Department accepts proposed solution

______________ Master Planning accepts proposed solution

______________ Environmental accepts proposed solution

Contract Title:
RFI No:
Contract No 1:
Contract No 2:
undefined:
Feature of work:
Date1_af_date:
Text3: Describe problem/Issue here
Text9:
Date10_af_date:
Date11_af_date:
Check Box16: Off
Check Box17: Off
Check Box18: Off
Date19_af_date:
Text1:
Text4:
Button5:
Dropdown1: [SOW Paragragh No.]
Text2:
Check Box2: Off
Text12:
Text13: Other accepts proposed solution
Text8:
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off

File details come from the government source that posted it. Updated .