Downtown_Historical_District_Sidwalk_Pressure_washing_2025.docx

DOCX document 20 KB Posted

Attached to
Downtown Historical District Sidewalk Pressure Washing and Maintenance
Solicitation number
ITB 26-016
Issued by
Lee County, Fruitville CDP, Florida

About this file

This Scope of Work document outlines professional sidewalk pressure washing and maintenance services for the City of Fort Myers Community Redevelopment Agency in the Downtown Historical District, located in Lee County, Florida. The contractor shall provide weekly pressure washing services during the first three full weeks of each month for designated pedestrian areas including Dean Street, Broadway Avenue, Main Street, Hendry Street, First Street, Bay Street, Bayview Court, the Starbucks storefront, and Patio De Leon. All work must be performed during non-peak pedestrian hours to minimize public disruption, with a detailed cleaning calendar provided by the City upon contract award. A non-mandatory pre-submittal meeting is scheduled for February 18, 2026, at 11:00 a.m. at Patio De Leon, with a question submission deadline of March 4, 2026, at 2:00 p.m., and final electronic submissions due by March 20, 2026, at 2:00 p.m. through the OpenGov portal. The contract term is three years with options to renew for two additional one-year terms, with a proposed City Council approval date of April 6, 2026.

The contractor must submit pricing on a monthly basis covering all labor, materials, equipment, supervision, and transportation, with no additional charges accepted beyond the quoted monthly fee. Contractor qualifications include holding valid Florida business licenses, operating under the current company name for a minimum of three consecutive years with no arrears or defaults with the CRA. Required insurance includes general liability coverage of $1,000,000 per occurrence, commercial automobile liability of $1,000,000 combined single limit, and workers' compensation coverage per statutory requirements. The contractor must utilize environmentally safe cleaning products approved by the City and ensure wastewater containment and disposal in accordance with local, state, and federal environmental regulations with no storm drain runoff. The solicitation requires compliance with the City's Minority Business Enterprise Ordinance and may include federal compliance requirements such as Davis-Bacon Act prevailing wage requirements, American Iron and Steel provisions, Build America Buy America mandates, and E-Verify employment verification, depending on funding sources. Submissions shall remain binding for 180 calendar days from the opening date, and the CRA reserves the right to award to multiple contractors or perform work using qualified CRA employees.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work Downtown Fort Myers Historical District Sidewalk Pressure Washing and Maintenance

1. Purpose The purpose of this Scope of Work (SOW) is to establish the requirements for professional sidewalk pressure washing and maintenance services within the Downtown Fort Myers Historical District. The Contractor shall provide all labor, materials, equipment, supervision, and transportation necessary to complete the services described herein.

2. Term of Agreement This Agreement shall be for a period of three (3) years, with the option to renew for two (2) additional one-year terms upon mutual agreement between the City and the Contractor.

3. Service Frequency and Schedule

· Pressure washing shall be performed once (1) per week for the first three (3) full weeks of each month.

· The fourth and/or fifth week of each month shall serve as an off week unless otherwise directed by the City.

· A detailed cleaning calendar and schedule of work areas will be provided by the City upon contract award.

· Work shall generally be performed during non-peak pedestrian hours (e.g., early morning or late evening) to minimize public disruption.

· Any schedule adjustments due to holidays, special events, or weather shall be coordinated with the City’s Parks and Beautification Division.

4. Work Areas and Parameters Services shall include, but are not limited to, pressure washing and maintaining all sidewalks and designated pedestrian areas within the following locations:

1. Dean Street

· West Side: From Bay Street to First Street

· East Side: From Bay Street to First Street

2. Starbucks

· North side along storefront facing First Street

3. Broadway Avenue

· West Side: From First Street to Main Street

4. Main Street

· North Side: From Broadway to Hendry Street

5. Hendry Street

· West Side: From Bay Street to Main Street

6. First Street

· North Side: From Monroe Street to Jackson Street

· South Side: From Monroe Street to Jackson Street

7. Bayview Court

· From Bay Street to First Street

8. Bay Street

· South Side: From Dean Street to Hendry Street

9. Patio De Leon

· East Side Entry

· South Side Entry

· North Side Entry

· Central Patio Area

5. Scope of Services The Contractor shall:

· Perform pressure washing of all designated sidewalks, curbs, and entry areas to remove dirt, grime, gum, spills, and other debris.

· Utilize environmentally safe cleaning products approved by the City.

· Ensure that wastewater is contained and disposed of in accordance with local, state, and federal environmental regulations (no runoff into storm drains).

· Report any observed damage, safety hazards, or graffiti to City staff immediately.

· Maintain a clean and safe work area during all operations.

· Provide all equipment, water, hoses, and fuel necessary to complete the work.

6. Quality Standards

· Surfaces shall be left clean, free of debris, stains, and residues after each service.

· Work shall not cause any damage to adjacent buildings, landscaping, or public property.

· The Contractor shall ensure minimal disturbance to pedestrians and nearby businesses.

· The City reserves the right to perform inspections and require rework at no additional cost if cleaning standards are not met.

7. Safety and Compliance

· The Contractor shall comply with all applicable OSHA, EPA, and City of Fort Myers safety regulations.

· Proper signage and pedestrian safety measures shall be in place during all operations.

· All employees shall wear appropriate personal protective equipment (PPE) and identifiable uniforms or badges.

8. Communication and Reporting

· The Contractor shall maintain regular communication with the City’s designated Project Manager.

· A service log or report shall be submitted monthly, detailing areas cleaned, issues observed, and completion dates.

· Any incidents, equipment failures, or delays must be reported immediately.

9. City Responsibilities

· Provide Contractor access to the designated work areas.

· Supply any required permits or permissions for work in the public right-of-way.

· Provide an updated schedule of events or restricted dates in the Downtown Historical District.

10. Optional Renewal The City reserves the right to renew this Agreement for up to two (2) additional one-year terms, contingent upon satisfactory performance, continued need for services, and available funding.

File details come from the government source that posted it. Updated .