About this file
This is a bid schedule for the Double Dick Underground Mine Fire Mitigation Project, issued under IFB1 PKAA 2027*0055. The project encompasses comprehensive mitigation and restoration work across 16 acres, with line items addressing mobilization and demobilization, project safety and environmental planning, access road maintenance, box culvert installation, dust and ash control, sediment fencing (4,420 linear feet), vegetation removal, topsoil management, water storage for fire suppression, excavation and backfilling, geomorphic natural regrade design across 10 acres, re-vegetation and site restoration, and biodegradable excelsior wattles (5,000 linear feet). Bidders are required to complete all pages of the bid schedule and enter both unit prices and total prices for each line item. The document was last updated on October 1, 2026.
The bid schedule includes seven additional optional line items (14.1 through 14.7) for equipment time that are not guaranteed, including excavator time, bulldozer time, water truck time, GPS-equipped grading equipment time, skid steer time, mini excavator time, and hydraulic hammer time. Bidders must provide pricing for all mandatory items and may bid on the optional equipment services. The document emphasizes that no amendments to the bid schedule are permitted and that all pages must be returned with every line item completed. No specific pricing terms, set-asides, or contract duration information is detailed in this schedule document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule Double Dick Underground Mine Fire Mitigation Project
IFB1 PKAA 2027*0055
Bidders must fill out all pages of the bid schedule. Enter both the unit price and total price for each line item.
Item # Item Description Qty Unit Per Unit Price ($) Total Price ($)
A Special Requirements - See Scope of Work 1 N/A N/A N/A
1.0 Mobilize/Demobilize 1 Job N/A
2.0 Project Safety, Health, and
Environmental Action Plan 1 Job N/A
3.0 Maintain and Restore Access Roads 1 Job N/A
4.0 Install and Maintain Box Culvert 1 Job N/A
5.0 Dust and Ash Control 1 Job N/A
6.0 Install, Maintain, and Remove S-Fence 4,420 LF
7.0 Vegetation Removal 16.0 AC
8.0 Remove and Stockpile Topsoil 16.0 AC
9.0 Onsite Water Storage for Fire
Suppression 1 Job N/A
10.0 Excavate, Blend, and Backfill
Excavation Area 1 Job N/A
11.0 Implement Geomorphic Natural
Regrade Design 10.0 AC
12.0 Re-Vegetation and Site Restoration 16.0 AC
13.0 Biodegradable Excelsior Wattles 5,000 LF
- Additional Bid Items 14.1-14.7 - NOT
GUARANTEED - - 0 $0.00
14.1 Additional - Excavator Time 8 HR
14.2 Additional - Bulldozer Time 8 HR
14.3 Additional - 4,000 Gal Water Truck Time 8 HR
14.4 Additional - Bulldozer with GPS
Grading Equipment Time 8 HR
14.5 Additional - Skid Steer Time 4 HR
14.6 Additional - Mini Excavator Time 4 HR
14.7 Additional - Hydraulic Hammer for
Excavator Time 4 HR
Grand Total $:
Do not amend any part of this bid schedule all pages of this bid schedule must be returned all line items must be completed. Updated October 1, 2026.