Dotson Creek Road Landslide_Revision Final_6.20.24 - signed.pdf
PDF 5 MB Posted
- Attached to
- Dotson Creek Road Landslide
- Solicitation number
- 70250
- Issued by
- Washington County, Virginia
About this file
This document is a project plan for the Dotson Creek Road Landslide remediation project in Wise County, Virginia. The work consists of reclaiming a landslide directly under VA Route 645 that was caused by drainage from an abandoned underground mine. The project involves excavating loose and unstable material, installing drainage infrastructure, backfilling the excavated area with riprap and aggregate, and repaving the roadway. Key elements include removing and disposing of existing drain pipes, installing an underdrain system, constructing a riprap buttress, and revegetating disturbed areas. Temporary drainage controls, erosion and sediment control measures, and traffic control plans are also detailed. The project is located in Wise County, Virginia and is being conducted by the Commonwealth of Virginia.
The plan outlines the construction sequencing, quantities of materials such as riprap, aggregate, and soil, and technical details for items like culverts, ditches, and paving. Pricing and contracting information is not provided, but the document indicates this is a state and local government contract opportunity. Funding sources and requirements are not specified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE:1"=2000'
2000100002000
PROJECT LOCATION MAP
DESCRIPTION
INDEX OF SHEETS
POUND & WISE, VA QUADRANGLES
5/29/24
N
Virginia
Virginia
Maryland
North
Tennessee
Kentucky
West
Carolina
Wise County
GENERAL NOTES
1. Before performing any excavation, contact Miss Utility, (800) 810-7197, to confirm the location of any below ground utility lines in the work area.
2. Before starting the work, contact the Agency for proper clearance and be governed by the Agency's instructions.
3. The contractor is responsible for scheduling, expediting, directing, inspecting and coordinating the work so as to complete the work in the time agreed upon.
4. Work in close cooperation with the Agency and others engaged in the project so that the work will be completed in an orderly manner.
5. Provide temporary supports as may be required during construction to ensure the stability of the proposed excavation.
DOTSON CREEK ROAD LANDSLIDE PROJECT
MINED LAND REPURPOSING
ABANDONED MINED LAND SECTION
WISE, VA
PROJECT LOCATION
of
Sheet 5/29/24
Date:
jwf
Vicinity Map
Designed:
Drawn:
jwf
Dotson Creek Road Landslide
WISE COUNTY, VIRGINIA
Scale:
1'=120'
Revisions:
N
Big Stone Gap, Virginia
(276) 523-8100
Legend
Contour(200')
Contour(40')
SCALE:1"=120'
120600120
Stream
Limit of Disturbance
Road
Dotson Creek
Dotson Creek Rd
Number:
Lower Project Site
Haulroad
Upper Project Site m i l e t o
G r e n
H l l w
R d
2120'
'22
'22
2150'
2160'
2170'
2180'
2190'
D o t s o n
C r e e k
R d
R
D o t s o n
C r e e k
2120'
'22
'22
'22
'22
'22
2180'
2170'
A
A
B
B
5/29/24
Date:
jwf
Lower Site Plan 1: Excavation
Designed:
Drawn:
jwf
Dotson Creek Road Landslide
WISE COUNTY, VIRGINIA
Scale:
1" = 40'
Revisions:
N
Big Stone Gap, Virginia
(276) 523-8100
Legend
Contour(10')
Contour(2')
SCALE:1"=40'
4020040
Landslide/Slope Failure
Limit of Disturbance of
Sheet
Number:
Stream
Existing Drain Pipe
Cross Section
A
Underdrain
Proposed Drain Pipe
Proposed Contour(10')
Proposed Contour(2')
A'
Temporary Drain Pipe
Culvert 1
Culvert 2
Scarp Area
Remove loose unstable material from the slide area. Excavate down to solid rock/residual soil.
See Cross Section and
Specifications for details.
Remove loose unstable material from scarp area. Regrade and stabilize with Erosion Control
Blanket. Revegetate.
Install Drain 1 at the bottom of the excavation. Grade drain into
Dotson Creek. See Typical
Detail.
Remove existing drain pipes and dispose at landfill.
Culvert 3: Remove and replace existing
VDOT culvert.
Access Route
Culvert 4: Install temporary culvert to divert stormwater away from work area. Armor outlet.
See Spec 6.D.iv - Temporary Drainage Control.
Proposed
Drain Pipe w/ Endwall
Install Endwalls on Culvert 3 ð ð ð ð ð ð ð ð ð ð ð ð ð ð ð ð
2120'
'22
'22
2150'
2160'
2170'
2180'
2190'
D o t s o n
C r e e k
R d
R
D o t s o n
C r e e k
2120'
'22
'22
'22
'22
'22
2180'
2170'
A
A
B
B
5/29/24
Date:
jwf
Lower Site Plan 2: Backfill
Designed:
Drawn:
jwf
Dotson Creek Road Landslide
WISE COUNTY, VIRGINIA
Scale:
1" = 40'
Revisions:
N
Big Stone Gap, Virginia
(276) 523-8100
Legend
Contour(10')
Contour(2')
SCALE:1"=40'
4020040
Riprap Buttress
Limit of Disturbance of
Sheet
Number:
Stream
Cross Section
A ð ðDitch
Underdrain
Temporary Drain Pipe
Proposed Contour(10')
Proposed Contour(2')
A'
Ditch 1
Proposed Drain Pipe
Drain 1
Culvert 1
Culvert 2
Access Route
Backfill excavated area with riprap stone and coarse aggregate. See
Cross Section and Specifications for details.
Install Riprap Buttress along the toe of the scarp area at the discretion and upon approval of the Project Inspector in coordination and with approval by VDOT.
Culvert 3
Remove Culvert 4 upon completion of Ditch 1.
Repave Dotson Creek Road according to Specifications. Expected paving to span approximately from Temporary
Culvert 4 to Culvert 3.
Tie new asphalt into existing pavement.*
Tie new asphalt into existing pavement.*
*Remove the top layer of asphalt, grade resulted millings, place a layer of surface mix asphalt to tie back into the existing asphalt.
Asphalt Repair
Proposed
Drain Pipe w/ Endwall
2300'
Primary Disposal Area
Maintain haulroad with coarse aggregate as needed through project. Install water bars;
200' max spacing between bars.
of5 12
Sheet Number:
D a t e j w f
U p p e r
S i t e
P l a n
D i s p o s a l
A r e a
D e s i g n e d
D r a w n j w f
D o t s o n
C r e e k
R o a d
L a n d s l i d e
W I S
E
C
O U
N T
Y
V
I R
G I N
I A
S c a l e
R e v i s i o n s
B i g
S t o n e
G a p
V i r g i n i a
N
Legend
Contour(25')
Contour(5')
SCALE:1"=60'
6030060
Limit of Disturbance
Temporary Drain Pipe
Secondary Disposal Area
Culvert 6: Install temporary culvert/roadbed to maintain site drainage. See Spec
6.D.iv - Temporary
Drainage Control
Access Route
Disposal Area
Proposed Drain Pipe
Culvert 5
Note:
Material shall be graded (2:1 max slope) smoothly and evenly across the designated disposal areas, following the general contours of the land. See Specification
No. 6 - Excavation for details.
E l e v a t i o n
E l e v a t i o n
Station
Station
A-A'
0+00 0+50 1+00 1+50 2+00 2+50
0+00 0+50 1+00 1+50 2+00 2+50
Slide Failure Access Route
Access Route shall be backfilled with stable earthen material removed to excavate the roadbed. If material excavated is deemed unusable by the Project Inspector, backfill with Class A1 rirap and VDOT No. 1 stone as done in the slide area. Haul all unusable material to the disposal area. Revegetate all disturbed ground.
E l e v a t i o n
E l e v a t i o n
Station
Station
B-B'
0+00 0+40 0+80 1+20 1+60
0+00 0+40 0+80 1+20 1+60
Install Riprap Buttress of
Class 1 Riprap along the bottom of the scarp slope.
Remove/Excavate loose and unstable material back to solid rock or residual soil.
Final location of cut line will be based on field conditions.
5' Max
5' Max
2.5' Min
Place apron layer of Class 1 riprap on any disturbed ground beyond the toe of the fill slope.
Embankment shall be backfilled with riprap stone and coarse aggregate up to the sub-base of the roadbed as indicated in the cross section and according to Specifications.
Repair and re-pave Dotson Creek Road (Rt. 645).
See Asphalt Repair typical and Specifications for details.
Remove all loose and unstable material above the road up the slope to the scarp line as directed by the
Project Inspector. Cover any disturbed or regraded ground with
Erosion Control Blanket, revegetate.
Approx. 4.0'
Notch/Step Cut Line in five foot lifts.
8.0'
2.0'
Ditch 1 of6 13
Sheet Number:
D a t e j w f
C r o s s
S e c t i o n
D e s i g n e d
D r a w n j w f
D o t s
C r e e k
L a n d s l i d e
W I S
E
C
O U
N T
Y
V
I R
G I N
I A
S c a l e
R e v i s i o n s
N
B i g
S t o n e
G a p
V i r g i n i a
Legend
Existing Ground
Excavation Limit
SCALE:1"=20'
2010020
Class 1 Riprap
Geotextile Fabric
Class A1 Riprap
VDOT No. 1 Stone
Stream
Compact Fill
Proposed Grade
2120'
'22
'22
2150'
2160'
2170'
2180'
2190'
D o t s o n
C r e e k
R d
R
D o t s o n
C r e e k
2120'
'22
'22
'22
'22
'22
2180'
2170'
A
A
B
B
SF
SF
SF
SF
SF
SF
CIP
SF
SF
STB
STB
STB
SF
5/29/24
Date:
jwf
Erosion and Sediment Control 1: Excavation
Designed:
Drawn:
jwf
Dotson Creek Landslide
WISE COUNTY, VIRGINIA
Scale:
1" = 40'
Revisions:
N
Big Stone Gap, Virginia
(276) 523-8100
Legend
Contour(10')
Contour(2')
SCALE:1"=40'
4020040
Slide Area
Limit of Disturbance of
Sheet
Number:
Stream
Existing Drain Pipe
Cross Section
A
Underdrain
Proposed Drain Pipe
Proposed Contour(10')
Proposed Contour(2')
A'
Temporary Drain Pipe
Straw Bale Barrier
SF
Silt Fence
STB
General Construction Sequence
1. Install & Maintain silt fence & straw bale barrier.
2. Grade & Maintain Access routes as needed;
3. Install temporary culvert (Culvert 4).
4. Install Culverts 1-3
5. Excavate loose and unstable material from slide area. Haul to disposal area.
6. Remove existing drain pipes from slide area. Dispose of at landfill.
7. Install Underdrain (Drain 1).
8. Remove unstable material from the scarp embankment.
Scarp Area
Access Route
Culvert 1
Culvert 2
Drain 1
Remove existing drain pipes.
Culvert 4
Culvert 3 ð ð ð ð ð ð ð ð ð ð ð ð ð ð ð
2120'
'22
'22
2150'
2160'
2170'
2180'
2190'
D o t s o n
C r e e k
R d
R
D o t s o n
C r e e k
2120'
'22
'22
'22
'22
'22
2180'
2170'
A
A
B
B
PSMU
PS
PS
PS
PS
PS
PS
PSMU
B/M
B/M
B/M
B/M
B/M
B/M
B/M
B/M
PSMU
PSMU
PSMU
5/29/24
Date:
jwf
Erosion and Sediment Control 2: Backfill
Designed:
Drawn:
jwf
Dotson Creek Landslide
WISE COUNTY, VIRGINIA
Scale:
1" = 40'
Revisions:
N
Big Stone Gap, Virginia
(276) 523-8100 of
Sheet
Number:
Ditch 1
Drain 1
Legend
Contour(10')
Contour(2')
SCALE:1"=40'
4020040
Limit of Disturbance
Stream
Cross Section
A
Underdrain
Proposed Drain Pipe
Proposed Contour(10')
Proposed Contour(2')
A'
Permanent Seed
Mulch
Straw Bale Barrier
SF
Silt Fence
STB
MU
PS
General Construction Sequence
1. Install & Maintain temporary ESC items.
2. Backfill excavated area with Riprap Stone and coarse aggregate.
3. Regrade/stabilize up-slope embankment.
4. Install Riprap Buttress with approval from Project
Inspector.
5. Seed and prep up-slope embankment.
6. Install Erosion Control Blanket on up-slope embankment.
7. Install Ditch 1.
8. Remove temporary culvert (Culvert 4).
9. Repave Road according to plans and specs.
10. Remove all temporary ESC items.
11. Place mulch and permanent seeding over all disturbed areas.
Temporary Drain Pipe
Culvert 1
Culvert 2
B/M
Erosion Control Blanket
Access Route
Riprap Buttress
Culvert 3
Culvert 4
2300'
SF
SF
SF
SF
SF
SF
PS
MU
PS
MU
PS
MU
PS
MU
PS
MU
STB
SF
SF
PS
MU
PS
MU
Primary Disposal Area
Culvert 5
Haulroad of9 13
Sheet Number:
D a t e j w f
E r o s i
S d i m e n t
C o n t r o l
D i s p o s a l
A r e a
D e s i g n e d
D r a w n j w f
D o t s o n
C r e e k
R o a d
L a n d s l i d e
W I S
E
C
O U
N T
Y
V
I R
G I N
I A
S c a l e
N A
R e v i s i o n s
B i g
S t o n e
G a p
V i r g i n i a
N
Legend
Contour(25')
Contour(5')
SCALE:1"=60'
6030060
Limit of Disturbance
Temporary Culvert
Permanent Seed
Straw Bale Barrier
STB
PS
General Construction Sequence
1. Install & Maintain temporary ESC items.
2. Grade & Maintain access routes.
3. Install temporary culvert (Culvert 6).
4. Install Culvert 5 and Water Bars along haul road.
5. Maintain haulroad through construction.
6. Dispose excavated slide material;
spread evenly on the designated area.
7. Revegetate all disturbed areas.
8. Remove temporary ESC items.
Culvert 6
Secondary Disposal Area
Mulch
Silt Fence
SF
MU
Access Route
Disposal Area
W20-2 [East Bound Lane]
M4-8a [West Bound Lane] of10 13
Sheet Number:
D a t e j w f
T r a f f i c
C o n t r o l
P l a n
D e s i g n e d
D r a w n j w f
D o t s o n
C r e e k
R o a d
L a n d s l i d e
W I S
E
C
O U
N T
Y
V
I R
G I N
I A
S c a l e
R e v i s i o n s
B i g
S t o n e
G a p
V i r g i n i a
N
Legend
VDOT Road
SCALE:1"=100'
100050001000
Stream
Project Location
Route 645 Detour
R d
H u r r i c a n e
O l d
R d
H u r r i c a n e
R d
B i r c h f i e l d
R d
C re e k
R d
T u r k y
B a n c h
R d
G r e
H l l o w
R d
H u r r i c a n e
M4-V3R [East Bound Lane]
M4-9R [East Bound Lane]
R11-3a & M4-10R
[Corners of Intersection]
M4-9L
[East Bound Lane]
M4-9R
[South Bound Lane]
M4-9L
[North Bound Lane]
M4-9R
[South Bound Lane]
W20-3
"ROAD CLOSED 1000FT"
[East Bound Lane]
W20-3
"ROAD CLOSED 500FT"
[East Bound Lane]
2 x R11-2
Concrete Barriers at 45° angle
D o t s o n
2 x R11-2
Concrete Barriers at 45° angle
W20-3
"ROAD CLOSED 500FT"
[West Bound Lane]
W20-3
"ROAD CLOSED 1000FT"
[West Bound Lane]
W20-2
[South Bound Lane]
M4-VP1a
R11-V2
[South Bound Lane]
R11-3a & M4-10R
[Corners of Intersection]
M4-V1
[South Bound
Lane]
Notes:
1. Sign/barrier placement based on VDOT Typical Traffic Control
(TTC), Road Closure Operation with a Detour (Figure TTC-48.2)
2. Traffic Control Plan is subject to modification and final approval from the Virginia Department of Transportation (VDOT).
3. A Portable Changeable Message Sign (PCMS) shall be placed on each end of the Route 645 closure a minimum 2 weeks prior to initiating the detour for public communication.
4. See Specification No. 18 - Traffic Control and Appendix A for further details and notes.
VDOT #21B Stone
SECTION VIEW
1. HDPE pipe shall have 1' cover minimum.
2. All pipe is to be placed on a 3% grade minimum
3. All Solid HDPE Pipe shall be ADS N-12 Pipe or equivalent
Typical Culvert N.T.S.
Compacted Backfill
1' MIN
3" MIN
1' MIN
Rock Core Underdrain N.T.S.
1.5' MIN
VDOT Class 1 Riprap
3"
2.0' min
VDOT NO. 57
VDOT NO. 21B
1. Excavate trench along shortest flow route to stream.
2. Use VDOT No. 21B stone as bedding to create an even pipe grade. 1.5% minimum.
3. Cover pipe with VDOT No. 57 stone.
4. Place Riprap stone with care not to damage or crush drain pipe.
HDPE perforated pipe.
6" min
ISOMETRIC VIEW
CL ROAD30° to 45°
Existing Road Surface
Original Grade 1'
SECTION VIEW
8'Min.6'Min.10'Min.
Compacted Berm 1'
Water Bar N.T.S.
Direct flow into existing haulroad ditchline.
6" COUNTERSINK
VDOT No. 57 Stone
1. A MINIMUM OF 4" OF NO. 57 STONE IS TO BE PLACED
UNDER THE CULVERT.
2. PIPE SHALL NOT EXCEED 30 FEET IN LENGTH.
3. FILTER FABRIC SHALL BE MIRAFI 700X OR EQUIVALENT
HDPE @ S=1% GRADE MINIMUM
FILTER FABRIC
FILTER FABRIC
Culvert Profile
Roadbed Cross Section VDOT No. 57 Stone
Temporary Road Bed N.T.S.
2' MIN
V
H
V
H
Bottom
Width
VDOT Gabion Stone
20mil PVC
Geomembrane
Liner
1. Over excavate to allow placement of stone layer, which shall be
1.5 times the average rock diameter.
2. Spread Layer of Bentonite onto ditch bottom and banks.
3. Place a cover layer of soil back over the Bentonite.
4. Line Ditch with 20mil PVC Geomembrane Liner.
5. Line Ditch with VDOT Gabion Stone.
Top
Width
Bentonite
Depth
Soil Cover Layer
Rock-Lined Ditch N.T.S.
1. EXCAVATE THE TRENCH 2. PLACE AND STAKE
STRAW BALES.
Flow
Compacted soil to prevent piping
Binding wire or twine
Angle first stake toward previously laid bale.
3. WEDGE LOOSE STRAW
BETWEEN BALES.
4. BACKFILL AND COMPACT
THE EXCAVATED SOIL.
Straw Bale Barrier N.T.S.
FILTER FABRIC
3. BACKFILL AND
COMPACT THE
EXCAVATED SOIL.
1. SET POSTS 5' APART AND
EXCAVATE A 4" X 4" TRENCH
UPSLOPE ALONG THE LINE OF POSTS.
2. ATTACH THE FILTER FABRIC
TO THE POSTS AND EXTEND IT
INTO THE TRENCH.
Silt Fence N.T.S.
of11 13
Sheet Number:
D a t e j w f
D e t a i l s f
D e s i g n e d
D r a w n j w f
D o t s o n
C r e e k
L a n d s l i d e
W I S
E
C
O U
N T
Y
V
I R
G I N
I A
S c a l e
N A
R e v i s i o n s
B i g
S t o n e
G a p
V i r g i n i a
1. COMPLETELY REMOVE ALL EXISTING ASPHALT DAMAGED DURING SLIDE WORK AND AT THE
DISCRETION OF THE PROJECT INSPECTOR.
2. GRADE AND COMPACT SUB-GRADE TO MATCH THE EXISTING SLOPE AND CURVATURE OF THE ROAD.
3. INSTALL GEOTEXTILE FABRIC OVER AGGREGATE SUBGRADE.
4. PLACE A 6" BASE LAYER OF VDOT NO. 21B, BASE AGGREGATE. PLACE AND COMPACT IN TWO 3" LIFTS.
5. PLACE 3" COMPACTED LAYER OF BASE MIX PAVEMENT, BM-25.0A.
6. PLACE A 2" COMPACTED LAYER OF SURFACE MIX PAVEMENT, SM-12.5E.
APPLICATION RATE: 220 LB/S.Y. A 25' TRANSITION TAPER MILL SHALL BE PERFORMED TO TIE NEW
PAVEMENT SURFACE INTO EXISTING.
7. SMOOTHLY TIE NEWLY PLACED ASPHALT INTO EXISTING ASPHALT ALONG CUT LINE.
8. REPAIR SHALL BE PERFORMED IN ACCORDANCE WITH VDOT ROAD AND BRIDGE SPECIFICATIONS, LATEST EDITION.
SUBGRADE SOIL
SURFACE ASPHALT, SM-12.5E
Base Aggregate, VDOT NO. 21B
Secondary Road Paving N.T.S.
BASE ASPHALT, BM-25.0A
SURFACE ASPHALT, SM-12.5E
Base Aggregate, VDOT NO. 21B
VDOT NO. 1 AGGREGATE
BASE ASPHALT, BM-25.0A
AGGREGATE SUBGRADESOIL SUBGRADE
GEOTEXTILE FABRIC
of12 13
Sheet Number:
D a t e j w f
D e t a i l
D e s i g n e d
D r a w n j w f
D o t s e e k
L a n d s l i d e
W I S
E
C
O U
N T
Y
V
I R
G I N
I A
S c a l e
N A
R e v i s i o n s
B i g
S t o n e
G a p
V i r g i n i a
SPEC.
NO.
SUMMARY OF QUANTITIES
DESIGN
QUANTITIES
DESCRIPTION UNIT
N/ALSMOBILIZATION
SITE PREPARATION LS N/A
Note: Not all quantities represent payable items. For pay items, see Bid Schedule.
3.B.i
VDOT CLASS I RIPRAP TON 4080
3.B.iv
3.B.v
3.B.vi
3.B.ii
VDOT CLASS AI RIPRAP TON 12300
3.B.iii
TON 85
TON 2000
VDOT GABION STONE
VDOT NO. 1 STONE
VDOT NO. 57 STONE
VDOT NO. 21B STONE
EXCAVATION
RIPRAP BACKFILL
TON
TON
YD
LS
N/A
Material
Ditch Schedule
Ditch
NO.
Bottom
Depth (ft)
Top
Width (ft) Length(ft)
Note: Ditch Schedule represents basic dimensions AFTER aggregate has been placed AND/OR final grading.
1 Gabion Stone 1.25 7.5 380
EROSION CONTROL BLANKET SY 1600
SILT FENCE FT 1100
STRAW BALE BARRIER FT 50
GEOTEXTILE FABRIC SY 1200
Width (ft)
0.0
RATIO
3:1
H:V
NO.
Culvert Schedule
1 12
(in)
Diameter
HDPE
Material
HDPE
Underdrain Schedule
Drain
NO.
1 40
[Minimum]
0.5
Length (ft) Width (ft)
1.5
Depth (ft)
Pipe Type
6" HDPE
Notes
(ft)
LengthCulvert
3 36HDPE 60
Notes
Rock Core Drain
4 18HDPE 60 Temporary Culvert/Armor Discharge w/ Riprap
12"Ø HDPE PIPE
11.B.iii(a)
FT 50
6"Ø HDPE PIPE13.B.i FT 80
STONE-LINED DITCH14 FT 340
20 mil PVC GEOMEMBRANE LINER14.B.i SY 135
SODIUM BENTONITE CLAY14.B.iii LB 6040
ASPHALT CONCRETE: Surface Mix15.B.ii TON 160
SURVEYS16 LS N/A
REVEGETATION17 AC 3.8
LIME17.C.i TON 7.6
FERTILIZER17.E.i LB 1140
TRAFFIC CONTROL LS N/A
CLEAN UP
QUALITY CONTROL
SAFETY PRECAUTIONS
FUGITIVE DUST CONTROL
5 18HDPE 30
6 8HDPE 20 Temporary Culvert
Armor Discharge with Riprap
Armor Discharge with Riprap
9.B.iv & 15.B.iv
RIPRAP BUTTRESS LS N/A
18"Ø HDPE PIPE
11.B.iii(b)
FT 30
36"Ø HDPE PIPE
11.B.iii(c)
FT 60
ASPHALT CONCRETE: Base Mix15.B.iii TON 180
HYDRAULIC HAMMER HR 50
FT 20
6.B.ii(a)
FT 60
6.B.ii(b)
8"Ø HDPE PIPE
18"Ø HDPE PIPE
Install VDOT EW-1 endwall on inlet and outlet
PRE-CAST ENDWALL12 EA 2
Hydraulic Cement Mortar
12.B.iv YD 0.5
3.B.vii
VDOT NO. 26 STONE TON 40
of13 13
Sheet Number:
D a t e j w f
D e t a i l
D e s i g n e d
D r a w n j w f
D o t s e e k
L a n d s l i d e
W I S
E
C
O U
N T
Y
V
I R
G I N
I A
S c a l e
N A
R e v i s i o n s
B i g
S t o n e
G a p
V i r g i n i a
| Sheets and Views |
| Dotson Landslide-Cover |
| Dotson Landslide-Vicinity |
| Dotson Landslide-Lower Site Plan 1 |
| Dotson Landslide-Lower Site Plan 2 |
| Dotson Landslide-Upper Site Plan |
| Dotson Landslide-Cross Sections |
| Dotson Landslide-ESC 1 |
| Dotson Landslide-ESC 2 |
| Dotson Landslide-ESC 3 |
| Dotson Landslide-Traffic Control Plan |
| Dotson Landslide-Details |
| Dotson Landslide-Details (2) |
| Dotson Landslide-Details (3) |
| 2024-06-20T15:35:22-0400 | |
| Holly F White |
| 2024-06-20T15:35:22-0400 | |
| Holly F White |
| 2024-06-20T15:35:23-0400 | |
| Holly F White |
| 2024-06-20T15:35:24-0400 | |
| Holly F White |
| 2024-06-20T15:35:24-0400 | |
| Holly F White |
| 2024-06-20T15:35:25-0400 | |
| Holly F White |
| 2024-06-20T15:35:26-0400 | |
| Holly F White |
| 2024-06-20T15:35:26-0400 | |
| Holly F White |
| 2024-06-20T15:35:27-0400 | |
| Holly F White |
| 2024-06-20T15:35:27-0400 | |
| Holly F White |
| 2024-06-20T15:35:28-0400 | |
| Holly F White |