DOT-RPF-26-1152-LE Addendum No.1.pdf

PDF 1 MB Posted

Attached to
RFP-1152 ADDENDUM NO. 1 State and local contract opportunity
Solicitation number
IN-15063
Issued by
Polk County, Florida

About this file

This Addendum No. 1 to RFP-26-1152-LE pertains to the Florida Department of Transportation (FDOT) District One's District Wide Storm Sewer Inspection project. The solicitation requests services to video inspect existing storm sewer systems, cross drains, and box culverts using closed-circuit television (CCTV), including dewatering, desilting, cleaning, and condition assessment of pipes and drainage structures ranging from 12 inches to 96 inches in diameter. The scope of work encompasses 91 line items covering desilt pipe operations (various diameters and silt levels), CCTV inspections with and without joint gap measurements, closed-circuit television inspection of drainage structures, dewatering pipe systems, specialty cleaning, report preparation, and specification development. Services are requested on an as-needed basis through task work orders, with individual project completion timelines established upon Letter of Authorization issuance. The vendor must be certified by the National Association of Sewer Service Companies (NASSCO) to provide contractual services. Work flow begins with a Request for Estimate, followed by DEPARTMENT review, Letter of Authorization issuance, and completion with submission of digital video files, comprehensive reports of findings with rehabilitation recommendations, and GIS data uploads using the SURVEY 123 application.

Compensation is structured on a unit-price basis per the Exhibit C Bid Sheet, with unit prices stated specifically in dollars and cents applying to both initial and any renewal contract periods. All costs including labor, equipment, supplies, tools, transportation, overhead, general and administrative expenses, and subconsultant costs are included in the unit prices. Invoices are submitted after final deliverables receive DEPARTMENT approval and must denote commencement and completion dates, invoice numbers, and all applicable pay item numbers and descriptions. Late delivery penalties of one percent of the Letter of Authorization fee per calendar day apply after a five-day grace period, with a maximum penalty of 100 days. All payments resulting from this competitive solicitation are subject to the MFMP Transaction Fee in accordance with Form PUR 1000 General Contract Condition No. 14, based on the date of payment issuance. The VENDOR is responsible for obtaining all necessary permits, water supply, proper turbidity controls, and upland disposal site arrangements complying with Federal, State, and Local regulations.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pay Item

Number Pay Item Description

ESTIMATED

QUANTITY

UNIT

UNIT PRICE

TOTAL

1 Desilt Pipe (12") (<20% Silt) 1 LF

2 Desilt Pipe (15") (<20% Silt) 1 LF

3 Desilt Pipe (18") (<20% Silt) 1 LF

4 Desilt Pipe (24") (<20% Silt) 1 LF

5 Desilt Pipe (30") (<20% Silt) 1 LF

6 Desilt Pipe (36") (<20% Silt) 1 LF

7 Desilt Pipe (42") (<20% Silt) 1 LF

8 Desilt Pipe (48") (<20% Silt) 1 LF

9 Desilt Pipe (54") (<20% Silt) 1 LF

10 Desilt Pipe (60") (<20% Silt) 1 LF

11 Desilt Pipe (66") (<20% Silt) 1 LF

12 Desilt Pipe (72") (<20% Silt) 1 LF

13 Desilt Pipe (84") (<20% Silt) 1 LF

14 Desilt Pipe (96") (<20% Silt) 1 LF

15 Desilt Pipe (12") (20%-40% Silt) 1 LF

16 Desilt Pipe (15") (20%-40% Silt) 1 LF

17 Desilt Pipe (18") (20%-40% Silt) 1 LF

18 Desilt Pipe (24") (20%-40% Silt) 1 LF

19 Desilt Pipe (30") (20%-40% Silt) 1 LF

20 Desilt Pipe (36") (20%-40% Silt) 1 LF

21 Desilt Pipe (42") (20%-40% Silt) 1 LF

22 Desilt Pipe (48") (20%-40% Silt) 1 LF

23 Desilt Pipe (54") (20%-40% Silt) 1 LF

24 Desilt Pipe (60") (20%-40% Silt) 1 LF

25 Desilt Pipe (66") (20%-40% Silt) 1 LF

26 Desilt Pipe (72") (20%-40% Silt) 1 LF

27 Desilt Pipe (84") (20%-40% Silt) 1 LF

28 Desilt Pipe (96") (20%-40% Silt) 1 LF

29 Desilt Pipe (12") (>40% Silt) 1 LF

30 Desilt Pipe (15") (>40% Silt) 1 LF

31 Desilt Pipe (18") (>40% Silt) 1 LF

32 Desilt Pipe (24") (>40% Silt) 1 LF

33 Desilt Pipe (30") (>40% Silt) 1 LF

34 Desilt Pipe (36") (>40% Silt) 1 LF

35 Desilt Pipe (42") (>40% Silt) 1 LF

36 Desilt Pipe (48") (>40% Silt) 1 LF

37 Desilt Pipe (54") (>40% Silt) 1 LF

38 Desilt Pipe (60") (>40% Silt) 1 LF

39 Desilt Pipe (66") (>40% Silt) 1 LF

40 Desilt Pipe (72") (>40% Silt) 1 LF

41 Desilt Pipe (84") (>40% Silt) 1 LF

42 Desilt Pipe (96") (>40% Silt) 1 LF

43 Closed Circuit TV Inspection (12") (standard) 1 LF

44 Closed Circuit TV Inspection (15") (standard) 1 LF

45 Closed Circuit TV Inspection (18") (standard) 1 LF

46 Closed Circuit TV Inspection (24") (standard) 1 LF

47 Closed Circuit TV Inspection (30") (standard) 1 LF

48 Closed Circuit TV Inspection (36") (standard) 1 LF

District Wide Storm Sewer Inspection

Exhibit “C” Price Proposal

DOT-RFP-26-1152-LE

C-1

49 Closed Circuit TV Inspection (42") (standard) 1 LF

50 Closed Circuit TV Inspection (48") (standard) 1 LF

51 Closed Circuit TV Inspection (54") (standard) 1 LF

52 Closed Circuit TV Inspection (60") (standard) 1 LF

53 Closed Circuit TV Inspection (66") (standard) 1 LF

54 Closed Circuit TV Inspection (72") (standard) 1 LF

55 Closed Circuit TV Inspection (84") (standard) 1 LF

56 Closed Circuit TV Inspection (96") (standard) 1 LF

57 Closed Circuit TV Inspection (12") (with Joint Gap Measurements) 1 LF

58 Closed Circuit TV Inspection (15") (with Joint Gap Measurements) 1 LF

59 Closed Circuit TV Inspection (18") (with Joint Gap Measurements) 1 LF

60 Closed Circuit TV Inspection (24") (with Joint Gap Measurements) 1 LF

61 Closed Circuit TV Inspection (30") (with Joint Gap Measurements) 1 LF

62 Closed Circuit TV Inspection (36") (with Joint Gap Measurements) 1 LF

63 Closed Circuit TV Inspection (42") (with Joint Gap Measurements) 1 LF

64 Closed Circuit TV Inspection (48") (with Joint Gap Measurements) 1 LF

65 Closed Circuit TV Inspection (54") (with Joint Gap Measurements) 1 LF

66 Closed Circuit TV Inspection (60") (with Joint Gap Measurements) 1 LF

67 Closed Circuit TV Inspection (72") (with Joint Gap Measurements) 1 LF

68 Closed Circuit TV Inspection (84") (with Joint Gap Measurements) 1 LF

69 Closed Circuit TV Inspection (96") (with Joint Gap Measurements) 1 LF

70 Closed Circuit TV Inspection Drainage Structures 1 EA

71 Dewatering Pipe System (12”-inch plug) 1 EA

72 Dewatering Pipe System (15”-inch plug) 1 EA

73 Dewatering Pipe System (18”-inch plug) 1 EA

74 Dewatering Pipe System (24”-inch plug) 1 EA

75 Dewatering Pipe System (30”-inch plug) 1 EA

76 Dewatering Pipe System (36”-inch plug) 1 EA

77 Dewatering Pipe System (42”-inch plug) 1 EA

78 Dewatering Pipe System (48”-inch plug) 1 EA

79 Dewatering Pipe System (54”-inch plug) 1 EA

80 Dewatering Pipe System (60”-inch plug) 1 EA

81 Dewatering Pipe System (66”-inch plug) 1 EA

82 Dewatering Pipe System (72”-inch plug) 1 EA

83 Dewatering Pipe System (84”-inch plug) 1 EA

84 Dewatering Pipe System (96”-inch plug) 1 EA

85 Review and Prepare Report 1 LF

86 Specification Development 1 EA

87 Barnacle Removal 1

EA

Location

88 Specialty Cleaning for Pipes and Drainage Structures 1 LF

89 Desilting Concrete Box Culvert / Specialty Drainage Structures 1 CY

90 Dewater Box Culvert 1 LF

91 Maintenance of Traffic (Lump Sum) 1 LS

C-2

NOTE: In submitting a response, the bidder acknowledges they have read and agree to the solicitation terms and conditions and their submission is made in conformance with those terms and conditions. The price for each pay item shall contain all costs to include labor, equipment, supplies, tools, transportation, overhead, general and administrative, incidental expenses, operating margin and subconsultant costs (if any). For box culvert bid items, equivalent pipe size shall be applicable to the box culvert configuration.

The bid price(s) will apply to the initial term and any renewal periods.

MFMP Transaction Fee:

All payment(s) to the vendor resulting from this competitive solicitation WILL be subject to the MFMP Transaction Fee in accordance with the referenced Form PUR 1000 General Contract Condition #14. The Transaction Fees imposed shall be based upon the date of issuance of the payment.

The bid price(s) provided must be stated specifically in dollars and cents, NOT a percentage increase. If a “0” (zero) is entered, then that is the fee that the Bidder will receive if awarded this contract. If a space is left blank, or a space is marked N/A, or the Department’s Exhibit “C”, Bid

Sheet is not utilized by the Bidder, the bid may be considered non-responsive.

C-3

EXHIBIT "A"

SCOPE OF SERVICES

DOT-RFP-26-1152-LE

District Wide Storm Sewer Inspection

1.0 Objective:

The Florida Department of Transportation (FDOT or the DEPARTMENT) in District One desires to obtain services to video inspect existing storm sewer systems, cross drains, and box culverts via closed circuit television (CCTV). This includes the remote videotaping of the interior of culverts, the interior of existing storm sewer manholes, inlets, junction boxes, catch basins, conflict structures for condition and obtaining recommendations for appropriate methods of repair.

Methods of recommended repair shall include proven trenchless pipe repair technologies. The

VENDOR must be certified by the National Association of Sewer Service Companies (NASSCO) in order to provide contractual services to the DEPARTMENT.

Such District Wide Storm Sewer Inspection will inspect the existing storm sewers and identify all repairs needed to restore the pipelines and their components (catch basins, inlets, manholes, end sections; and all other related items) to their original conditions and capacity. To achieve these objectives, a systematic, step by step program was developed consisting in the following:

1. Dewatering, Desilting, and Cleaning (as applicable)

2. TV Inspection and Video Taping

3. Data Management/Overview of Outputs

4. Repair Analysis and Cost Estimates

5. Final Report of Findings

6. Provide Deliverables (Report of Findings, CCTV videos, Repair recommendations, etc.)

to FDOT

Rehabilitation recommendations shall be intended to correct the defects identified in the inspection but are not intended to address the design capacity or design flow of the storm sewer system.

1.1 Services:

A. Pipe Inspection & Video:

1. The entire storm sewer system is assumed to be flooded at the time of the inspection.

The VENDOR shall dewater, desilt, and clean (as applicable) the interior of existing culverts to provide video using closed circuit television in accordance with the latest guidelines of National Association of Sewer Service Companies (NASSCO) as found in the NASSCO Manual of Practices – Wastewater Collection Systems, the latest

FDOT Standard Specification for Road and Bridge Construction, and the latest

NASSCO Specification Guidelines.

2. Perform video inspections on clean dry lines. Inspect storm sewers for cleanliness before the start of video inspection. Do not perform inspections where the flow depth exceeds 5% of the pipe or drainage structure’s cross-sectional area, without the prior approval of the Engineer.

A-1

Revised 2/5/26

3. The camera used must be able to pan and tilt 90 degrees so as to obtain a view normal to the culvert wall and rotating 360 degrees. Provide a high-quality color video with a minimum resolution of 720 X 480 in a delivery method acceptable to the Engineer.

4. The video image shall be clear, focused, and relatively free from roll, static, or other image distortion qualities that would prevent the reviewer from evaluating the condition of the pipe. The video will include identification before each section of pipe filmed. The identification will include the State Road Name, the structure number (pipe name) corresponding to the structure number (upstream and downstream) in the task work order exhibit provided for the project, direction of travel at the start of the pipe run, size of pipe, material and shape of pipe (round or elliptical), and the date and time of video inspection. The camera must be operative in 100% humidity conditions.

5. Move the camera through the pipe at a speed of approximately 15 feet per minute but not greater than 30 feet per minute, unless otherwise directed by the Engineer. Mark the video with the distance down the pipe. The distance shall have an accuracy of one foot per 100 feet.

6. Video noticeable areas of pipe deficiencies through the entire length of pipe. At every observed joint deficiency and at significant defects, stop the camera and rotate the camera’s view a full revolution to document defects. View all suspect areas in such a way as to make a clear analysis of the system. If joint gap measurements are required for a specific pipe run, this will be noted in the Exhibit provided with the TWO. Position the camera head perpendicular to all defects requiring measurement by the video micrometer.

7. Provide a view of intersecting pipes and drainages structures without diverting from the primary inspection route.

8. Notes should be taken during the video recording process. Provide the Engineer with copies of these notes along with the video. Documenting deficiencies observed in video and photograph format in accordance with Maintenance Specification Section 432-2.1.

9. When a pipe segment is inaccessible for video recording, request the DEPARTMENT’s

Contract Manager to notify the DEPARTMENT’s Maintenance Office for assistance to access the storm drain.

B. Dewatering:

1. Dewatering Pay Items are intended to compensate the VENDOR for pumping down storm sewer systems in preparation for cleaning and/or inspection and are to be paid for on a PER PUMPING SETUP BASIS.

2. When water is present, de-water the pipe, inlet, manhole, catch basin, junction box, conflict structure, or box culvert to facilitate cleaning and inspection.

A-2

3. The VENDOR is responsible for obtaining any necessary permits (and providing a copy to FDOT), water supply, or other items incidental to the process of desilting pipe culverts. Proper turbidity controls shall be utilized during desilting activities. Silt shall not be blown out into adjacent water bodies. Proper turbidity barriers, containment and silt removal shall be furnished to prevent silt and debris from discharging to downstream water bodies.

4. FDOT reserves the right to review all dewatering set-ups during initiation of work. The

VENDOR must take corrective action at no additional cost to the DEPARTMENT to modify their dewatering operations if found out of compliance with FDOT standards

& specifications or State Laws.

C. Desilting:

1. Perform desilting using high-pressure jetting and commercial vacuum services, as necessary to complete the video inspection in accordance with FDOT Maintenance

Specification Section 430-94.

2. Clean the pipe or box culvert by removing all of the silt and debris so that the drainage capacity is one hundred percent of the original design capacity of the pipe or box culvert.

3. Perform desilting operations in a manner not to damage the pipe, box culvert or surrounding area.

4. Dispose of all silt and debris removed in the desilting operations in an upland disposal site meeting Federal, State and Local Rules and Regulations.

5. Structures and pipes determined by the Engineer to contain unacceptable levels of silt after cleaning operations have taken place are subject to be re-cleaned by the VENDOR at no additional cost to the DEPARTMENT.

D. Drainage Structure Inspection & Video:

1. CCTV video is required for all standard structures (Catch Basins, Inlets, Manholes, Junction Boxes, Conflict Structures) and connecting pipes to be videoed.

2. The VENDOR shall physically open and inspect each accessible structure, in addition to CCTV video, the interior of existing Catch Basins, Inlets, and Manholes as accessible, in an effort to determine its condition and identify and record any deficiencies. This shall be in accordance with the latest guidelines of NASSCO as found in the NASSCO Manual of Practices – Wastewater Collection Systems, the latest

FDOT Standard Specification for Road and Bridge Construction, and the latest

NASSCO Specification Guidelines.

3. All Occupational Safety and Health Administration (OSHA) requirements for confined space entry shall be followed.

A-3

4. The drainage structure will be inspected to determine the following: depth of structure, diameter of structure, construction type and condition, manhole frame and cover condition, sizes and types of all incoming and outgoing pipes, depth of flow in each pipe, depth of debris in each pipe and overall condition of the entire structure.

5. Visible evidence of any cracks, infiltration, or holes within structures shall be noted and documented on a separate structure inspection form detailing the observed deficiencies, photographic evidence and included in the report deliverable. Each pipe line entering and exiting the structure will be lamped with a high intensity light in order to determine the grout seal condition. Photographic evidence at each grout seal of each pipe entering the structure shall be provided on the structure inspection form.

1.2 Deliverables:

A. CCTV Video:

1. Provide video files to the DEPARTMENT via digital media by electronic delivery method acceptable to the DEPARTMENT with a minimum standard resolution of 720 x 480. Digital video disc (DVD), flash drive, or compact disc (CD) media will not be accepted.

2. Video files shall be provided to the DEPARTMENT as .MP4 files. Any other format needs approval by the Engineer prior to submitting to the DEPARTMENT.

3. Videos shall be provided to the DEPARTMENT organized in a file folder or .zip file folder with corresponding sub folders named by pipe name as provided by the

DEPARTMENT in the Task Work Order Exhibit for the specified project. The videos shall have the same name convention as the sub folders and be placed in these before providing them to the DEPARTMENT. Pipe names must also match pipe names entered into GIS Survey 123 App as described in section 1.2 part C of this contract.

B. Report of Findings:

1. The VENDOR will review all closed-circuit television inspection video footage and prepare television inspection logs.

2. A PDF Report of Findings will be made and provided to the DEPARTMENT which will include a plan view exhibit of the inspected system with appropriate labels for present defects shown at the corresponding location along the pipe. Distance of travel within the pipe along with corresponding video time segment shall be documented in the report.

3. Report shall document in summary form: length of pipe videoed, corresponding upstream and downstream structure names, date videoed, and material of pipe. Table shall be organized Ascending order of pipe sizes videoed for the entire project and show the total length of each pipe size surveyed.

A-4

4. Desilting percentage required for cleaning pipes (corresponding with bid item descriptions in this contract) shall be listed in the inspection report for each pipe. For tasks requiring >20% desilting on > 20% of the pipe runs, then photographic evidence supporting the additional required desilting shall be provided to the DEPARTMENT.

5. All submitted report of findings shall include a legend of deficiency codes with code meaning descriptions located as an appendix within each submitted report.

6. Defects identified during this review will be documented and Photo logs will be included in an appendix to the Report of Findings. Photo Logs should contain images of the defects along with description of size shall be created for each pipe and structure that is inspected. Photos shall be clear, focused, relatively free from roll, or other image distortion qualities with a comprehensive view of the defect shown.

7. A Comprehensive Rehabilitation Summary Report denoting any necessary repair work along with an estimated cost for each associated repair shall be included as an appendix with the Report of Findings. Report to be submitted in table format stating pipe name, pipe size and length, recommended rehabilitation techniques, and associated cost for each recommended repair. Cost to be based on current market rate for repair method at time of submitting report.

8. Methods of recommended repair shall include proven trenchless pipe repair technologies.

9. All written reports presenting findings and Comprehensive Rehabilitation Summaries shall be signed by an accredited professional certified by NASSCO.

C. GIS Requirements:

Deliverables for projects shall include a GIS reference of the pipe video inspection for each pipe and structure to be inspected. Data entry for this shall be completed using the

SURVEY 123 app. Once the deliverables are available, the VENDOR shall upload the data mentioned in this section in the designated DEPARTMENT pipe video GIS system. Once the data has been entered into the DEPARTMENT system, the VENDOR will then need to notify the DEPARTMENT Project Manager via e-mail that the data has been uploaded. The data entry workflow requirements shall follow the guidelines provided in Appendix A.

1.3 Work Flow Process:

A. A Request for Estimate will be generated by the DEPARTMENT requesting a Price

Proposal from the VENDOR. The request will be submitted via Email as an attachment.

The request will contain plans, sketches, photographs showing the location of the work and storm network system layout to be inspected. The Request will include an estimated quantity of pipe and diameter when as-built plans are available. Otherwise a sketch denoting the system will be provided. The VENDOR shall inspect the site to verify site conditions and provide a more accurate estimate. Refer to site conditions on

Item 1.4 below. The estimate shall adhere to the Pay item numbers, pay item description and unit price agreed on contract as shown on Exhibit C “Bid Sheet”.

A-5

B. Once a Price Proposal is submitted by the VENDOR , the DEPARTMENT will review and approve the proposal; and a Letter of Authorization (LOA) will be issued for the price amount agreed on the proposal. The expected due date for the Report of Findings and videos will be corresponded via the email containing the LOA. No work shall start before LOA issuance date. The VENDOR shall make any effort necessary to commit to due date of Report. If any problems arise that may affect the expected completion date, the VENDOR shall immediately notify the DEPARTMENT so adjustment to the completion date can be made.

C. If during the CCTV inspections for a given letter of authorization, the VENDOR finds discrepancies in the estimated quantities that exceed the authorized amount, the

VENDOR shall immediately notify the DEPARTMENT for review of any additional work. The VENDOR is to provide a request to adjust the original Price Proposal before proceeding to finalize CCTV work. The VENDOR is not to proceed with work until a revised letter of authorization is issued for the new agreed price amount. If VENDOR finds that there is calcium buildup in the pipe after standard cleaning procedures have been completed, the DEPARTMENT should be notified immediately so that a decision can be made if additional more intense cleaning methods may be approved for use. A revised letter of authorization will be issued if the DEPARTMENT agrees to proceed with further cleaning for the new agreed price amount with the VENDOR.

D. Once the CCTV inspections are completed, the VENDOR shall submit and upload a digital copy of the Report of Findings as well as a digital copy of all the pipe videos into the designated DEPARTMENT pipe video GIS system as outlined in Appendix A.

1.4 Site Conditions:

A. Upon receipt of a Request for Estimate by email or in writing, the VENDOR shall evaluate the work site to confirm and determine if there is any deviation from the as-built plans or sketches provided with the request for quote. Any adjustments in quantities shall be reflected on the Price Proposal. The parties shall agree on such pay items prior to initiation of the associated work and the VENDOR shall await a Letter of Authorization (LOA) to proceed.

B. The VENDOR acknowledges, through submittal of a Price Proposal for a given

Letter of Authorization (LOA), that the VENDOR has investigated and is aware of all the conditions affecting the work, including but not restricted to those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, access, maintenance of traffic (MOT), uncertainties of weather, river stages, tides, water tables or similar physical conditions at the site, the conformation and conditions of the ground and the character of equipment and facilities needed preliminary to and during completion of the work. It is also noted that these factors do not make a difference to the Price Proposal, but are incidental thereto. In addition, the VENDOR shall be aware of the character, quality and quantity of subsurface materials or obstacles to be encountered in so far as this information is reasonably ascertainable from an inspection of the site, or from any other information made available by the DEPARTMENT. Any failure to meet the

A-6 above-mentioned conditions will not relieve the VENDOR from properly estimating the difficulty or cost of successfully performing the Work. The DEPARTMENT assumes no responsibility for any conclusions or interpretations made by the

VENDOR on the basis of the information made available by the DEPARTMENT.

C. The VENDOR shall take color photographs, or video above the starting structure facing the roadway to document pre-existing aboveground conditions near the structure to be cleaned and inspected under this contract, and shall provide the

DEPARTMENT. These photographs or footage will be used to evaluate symptoms of subsurface problems such as asphalt patches and sinkholes, or other evidence of potential underlying problems. Additionally VENDOR shall provide longitude/latitude of starting video position.

1.5 Differing Site Conditions:

The VENDOR shall promptly and before such conditions are disturbed, notify the

DEPARTMENT in writing of: (1) subsurface or latent physical conditions at the site differing materially from those indicated in this contract or identified in the VENDOR ’s estimate, or (2) unknown physical conditions at the site, of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for this contract. The DEPARTMENT will promptly investigate the conditions, and if the

DEPARTMENT finds that such conditions do materially so differ to cause an increase or decrease in the VENDOR ’s quantity of pay items, or the time required for, performance of any part of the work under the contract, the Department shall consider an equitable adjustment and shall modify the Letter of Authorization (LOA) accordingly.

1.6 Method of Compensation:

The DEPARTMENT shall request VENDOR services on an as-needed basis. Services to be provided on each project will be initiated and completed based on each TWO. Payment will be made in accordance with the Bid Price Proposal.

All invoices shall be submitted after the final deliverable have been approved by the

DEPARTMENT. The invoice shall denote the dates of commencement and completion of work along with invoice number. No work is permitted past the date of completion as noted on the LOA.

All invoices shall denote all pay items numbers and pay item description used on the approved

LOA.

The VENDOR shall be assessed a penalty for late delivery of all work products. In addition, the

VENDOR shall be assessed a penalty for failure to provide, or late delivery of, requested corrections to all work products. The DEPARTMENT shall offer the VENDOR a grace period of

5 days after the deadline before financial consequences are applied. The financial consequences will be 1% of the LOA fee per calendar day for a maximum of 100 days. Financial consequences shall be calculated and adjustments made to approved invoice payments.

Any fines levied on the DEPARTMENT as a result of failure, oversight or negligence by the

VENDOR shall be the responsibility of the VENDOR. Should the VENDOR services fail to meet the DEPARTMENT or industry standards, the VENDOR shall re-perform the services at the expense of the VENDOR.

A-7

A. Maintenance of Traffic:

Maintenance of Traffic (MOT) shall conform to the latest FDOT Standards Plans for

Road Construction. This includes the placement of all traffic devices (including signs), Barricades, etc. The VENDOR shall notify the appropriate local FDOT Operation

Center a minimum of seven calendar days prior to mobilizing and setting up MOT for video inspection. NOTE: any significant MOT efforts for dewatering of box culverts should be captured in the Dewater Box Culvert Pay Item.

B. Specification Development/Barnacle Removal:

1. Specification Development shall be in compliance with and as supplement to the latest

FDOT Specifications for Road and Bridge Construction Manual.

2. The Barnacle Removal Pay Item is intended to compensate the VENDOR for the removal of barnacles in order to install plugs for dewatering. Barnacle removal will be paid per pipe location and as directed by DEPARTMENT. The need for barnacle removal shall be brought to the attention of DEPARTMENT at the time of the Report of Findings/price quote but in any event must be brought to the DEPARTMENT’s attention no later than prior to commencement of work.

C. Specialty Cleaning of Pipes and Drainage Structures:

The Specialty Cleaning of Pipes and Drainage Structures Pay Item is intended to compensate the VENDOR for cleaning methods that is above and beyond the standard cleaning method of high-pressure jetting and commercial vacuum services to remove large debris, calcium buildup, etc. The potential need for specialty cleaning shall be brought to the attention of the DEPARTMENT immediately.

D. Desilting Concrete Box Culvert / Specialty Drainage Structures:

The Desilting Concrete Box Culvert / Specialty Drainage Structures Pay Item is intended to compensate the VENDOR for desilting drainage structures which may require more robust efforts than a standard desilting operation. Payment is for the VOLUME OF SILT removed from the structure. Specialty Drainage Structures must be brought to the attention of and approved by the DEPARTMENT before desilting operation takes place.

E. Closed Circuit TV Inspection Pipes:

The Closed-Circuit TV Inspection for pipes Pay Items are intended to compensate the

VENDOR for video inspection of existing storm sewer pipes. The quantity to be paid will be the distance, linear feet (LF), that the camera physically traveled in the pipe ONLY during inspection. The distance the camera travels prior to inspection will not be paid.

Video to identify any deficiencies within the pipe. Payment for CCTV inspection of box

A-8 culverts shall be based on (LF) and correspond to the area of opening as matches the nearest pipe size equivalent.

1. Standard CCTV (Without Joint Gap Measurement)– Video the pipe to identify any deficiencies within the pipe. At every observed deficient joint and at significant defects, stop the camera and rotate the camera’s view a full revolution to document defects. View all suspect areas in such a way as to make a clear analysis of the system. No measurements are required for deficiencies as part of this Pay Item.

2. With Joint Gap Measurement - Video the entire circumference of all joints, pick-up holes, and any other suspect areas in order to identify any deficiencies along the entire perimeter of the joint. At every deficient joint and structure, and at significant defects, stop the camera and rotate the camera’s view a full revolution to document and measure defects. View all suspect areas in such a way as to make a clear analysis of the system. Position the camera head perpendicular to all defects requiring measurement by the video micrometer.

F. Closed Circuit TV Inspection Drainage Structures:

The Closed-Circuit TV Inspection for Drainage Structures Pay Item is intended to compensate the VENDOR for photographic or video inspection of the structures including Catch Basins, Inlets, Manholes, Junction Boxes, and Conflict Structures.

Payment will be made per each structure included on the structure inspection form.

G. Dewater Box Culvert:

The Dewater Box Culvert Pay Item is intended to compensate the VENDOR for significant efforts including material cost, labor cost, and MOT cost needed to dewater box culverts to allow for CCTV and visual inspection. Cost is based on a per linear foot basis.

H. Desilting & Dewatering of Pipes:

The Desilting and Dewatering of drainage pipes pay item shall also include desilting and dewatering of connected drainage structures. Percentage of silt in the pipe for desilting payment shall be based on initial visual inspection observed in the pipe before any cleaning has taken place.

I. Elliptical Pipes:

Desilting, CCTV inspection, and Dewatering for Elliptical pipes shall be based on pipe size and pay items for the equivalent round pipe as shown in the FDOT Drainage Manual

Appendix C Table “Concrete Pipe – Elliptical Dimensions”.

A-9

DESILTING PIPES AND BOX CULVERTS.

(REV 8-2-13) (FY 2025-26)

The following new Section is added after Section 430:

SECTION 430-94

DESILTING PIPES AND BOX CULVERTS

430-94-1 Description.

Remove and dispose of silt, debris, vegetation, soil, rock, or any type of blockage inside a pipe or box culvert to provide maximum drainage capacity.

430-94-2 General Requirements.

Clean the pipe or box culvert by removing all of the silt and debris so that the drainage capacity is one hundred percent of the original design capacity of the pipe or box culvert.

Perform desilting operations in a manner not to damage the pipe, box culvert or surrounding area.

Meet the requirements of Federal, State and local environmental standards and laws when performing all activities.

Meet the requirements of Section 104 Prevention, Control and Abatement of Erosion and Water Pollution of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction and revisions thereto (current at the time of contract letting).

When water is present, de-water the pipe or box culvert to facilitate cleaning and inspection. Access to the pipe or box culvert may require temporary removal of fence, signs, guardrail, grates or manhole covers. Replace according to Department standards at the completion of the desilting operation or each day, as appropriate for safety.

Align infall and outfall ditches 50 feet from the pipe or box culvert to meet the existing line and grade. If the Right-of-Way line is less than 50 feet from the pipe or box culvert, align infall and outfall ditches to the Right-of-Way line. Grade and sod any disturbed areas caused by the desilting operation.

Identify and report to the Engineer necessary repairs to the pipes or box culverts exposed during the desilting operation.

Dispose of all silt and debris removed in the desilting operations in areas meeting Federal, State and Local Rules and Regulations.

Repair or replace damage to turf, pavement, signs or structures, etc. due to negligence to the satisfaction of the Engineer at no additional cost to the Department. Complete repairs prior to submission of the invoice for work accomplished.

430-94-3 Inspection.

Maintain de-watering after completion of the desilting operations to allow for inspection.

Re-clean structures determined to be unacceptable by the Engineer within the time specified at no additional cost to the Department.

A-10

430-94-4 Method of Measurement.

430-94-4.1 General: The cost of temporary removal and subsequent replacement of fence, signs, guardrail, grates or manhole covers will be included in the contract unit price for the related item.

Infall and outfall ditch alignment, grading and sodding will be included in the contract unit price of the related item.

430-94-4.2 Desilting Pipe: The quantities for payment will be the length in feet of pipe desilted and accepted.

430-94-4.3 Desilting Box Culverts: The quantities for payment will be the volume in cubic yard of material removed from the box culvert.

430-94-5 Basis of Payment.

Price and payment will be full compensation for furnishing all equipment, tools, labor, disposal of silt and debris, de-watering, erosion and water pollution control, clean up and all incidentals necessary for the satisfactory performance of the work.

Payment will be made under the items specified in the Bid Price Proposal.

A-11

INSPECTION OF EXISTING PIPES AND STORM SEWERS.

(REV 9-03-19) (FY 2025-26)

The following new Section is added after Section 431:

SECTION 432

INSPECTION OF EXISTING PIPES AND STORM SEWERS

432-1 Description.

Inspect pipes and storm sewers as shown in the Contract Documents. Provide video and a written report to list all deficiencies of the storm drain pipes, manholes and inlets, along with a detailed map of the storm water system inspected and videoed.

432-2 Video Equipment and Requirements.

432-2.1 Inspection and Video: Comply with OSHA Confined Space Standard, 29 CFR Part 1910.146. Manual inspections may be required in order to determine the extent of damage.

Pipe walls in areas of concern should be sounded to identify any structural degradation.

Use a camera with lighting suitable to allow a clear picture of the entire periphery of the pipe. Center the camera in the pipe both vertically and horizontally and be able to pan and tilt to a 90 degree angle with the axis of the pipe and rotating 360 degrees. Use equipment to move the camera through the pipe that will not obstruct the camera’s view or interfere with proper documentation of the pipe’s condition.

Provide a high quality color video with a minimum resolution of 720 X 480 in a delivery method acceptable to the Engineer. Include a narrative stating the location and explanation of deficiencies with the video. The video image must be clear, focused, and relatively free from roll, static, or other image distortion qualities that would prevent the reviewer from evaluating the condition of the pipe. Provide identification in the video before each section of pipe filmed, including the pipe location, the project number, the structure number corresponding to the structure number in the Plans for the project, size of pipe, and the date and time. Indicate which pipe is being filmed if multiple pipes are connected to the structure. Notes should be taken during the video recording process. Provide the Engineer with copies of these notes along with the video.

Move the camera through the pipe at a speed of approximately 15 feet per minute but not greater than 30 feet per minute, unless otherwise directed by the Engineer. Mark the video with the distance down the pipe. The distance shall have an accuracy of one foot per 100 feet. The number of units of equipment on hand must be adequate to insure the completion of the work.

Ensure that all equipment to be used is in safe working condition. Repair or remove from the job equipment that is not in safe working condition.

The camera must be operative in 100% humidity conditions. Provide a view of intersecting pipes and drainages structures without diverting from the primary inspection route.

Video the entire circumference of all joints, pick-up holes, and any other suspect areas in order to identify any deficiencies along the entire perimeter of the joint. At every joint and structure, and at significant defects, stop the camera and rotate the camera’s view a full revolution to document and measure defects. View all suspect areas in such a way as to make a

A-12 clear analysis of the system. Position the camera head perpendicular to all defects requiring measurement by the video micrometer.

At any time during the video inspection, the Engineer may declare the work unsatisfactory and no payment will be made for that section of the work Perform video inspections on clean dry lines. Inspect storm sewers for cleanliness before the start of video inspection.

Dewatering will be incidental to the other pay items. Do not perform inspections where the flow depth exceeds 5% of the pipe or drainage structure’s cross-sectional area, without the prior approval of the Engineer.

Desilting, as necessary to perform the video inspection, will be paid separately.

Note the conditions of intersecting pipes and drainage structures on the report and video for the project.

432-2.2 Written Report and GPS Data Collection: Prepare a written report to list all deficiencies of the storm drain pipes, manholes and inlets, along with a detailed map of the storm water system videoed.

The map must include, but is not limited to, the State highway, intersecting side streets, the location of all inlets and manholes, and the diameter and length of all pipes videoed.

The report must include, but is not limited to, deficiencies such as cracked pipes, joint leaks, failed patches, subsidence, intrusions, stained pipe, and significant defects. Specify the coordinate location of each deficiency in the report in the same chronological order as the video. Note the conditions of intersecting pipes and drainage structures on the report and video.

Include GPS coordinates of storm drainage lines locations including type/size/shape of any inspected drainage lines. GPS location point readings should be taken at the center of each structure or grate.

Document defects identified during this review and submit inspection logs.

Include the following in the report:

1. Date, project name, and project number.

2. Street names with starting and ending points.

3. Identify the type of structure, locations, and number (if available).

4. Distances using a tape measure or roll-a-tape

5. Coordinate locations of pipe/culvert/drainage structure deficiencies (i.e.

bad joints, offset joints, breaks, or leaks).

6. Centerline distances between structures (if available).

7. Inspection video indicating the structure type/number, coordinates, rim elevation, pipe invert, counter display, and any other relevant data.

8. Coordinate point location (X, Y, Z fields) to represent latitude and longitude in North American 1983 Datum. Precision shall be to the seventh decimal for X and Y, and to the tenth for Z (ex. 25.217111, - 80.3683639, 10.5’).

9. A separate column identifying whether it is the begin or end point, change of direction or change of size etc.

10. A written report indicating drainage structure numbers and video counter display numbers

11. Pipe diameter in inches (18”, 24”, 36”, etc.)

12. Pipe material (reinforced concrete, corrugated, galvanized, high density polyethylene, etc.)

13. Pipe shape (round, elliptical, square, rectangular)

A-13

14. A detailed map of the storm water drainage system as videoed Catalog inspection information gathered on inspection forms to produce a report of deficiencies. The expected deliverables must be in a data format that is compatible with ESRI’s ArcGIS 10.1 and above; a PDF file of the inspection report cataloging the inspection results; video version of the report showing the inspected pipe; spreadsheet file (.xls format) indicating the structure locations with pipe start and end points, and their associated material, location, identification number, referenced plan set (if available), etc. Results will be made available on computer programs compatible with Department systems.

Submit a complete copy of the final project report and map to the Department within 14 days of completion of all work order documents.

432-3 Method of Measurement.

The quantity to be paid will be the distance, in feet, that the camera physically traveled during inspection of the location specified in the Contract Documents. The distance the camera travels prior to inspection will not be paid.

432-4 Basis of Payment.

Price and payment will be full compensation for video inspection and reporting, including dewatering (when necessary) and all equipment and work specified in this Section.

Payment will be made in accordance with the Bid Price Proposal.

A-14

Insert from: "Exhibit A- Scope of Services.pdf"
New Bookmark
New Bookmark
New Bookmark
Insert from: "Desilting Matinenance Spec Attachment.pdf"
DESILTING PIPES AND BOX CULVERTS.
Insert from: "Video Inspection Maintenance Spec Attachement.pdf"
INSPECTION OF EXISTING PIPES AND STORM SEWERS.

File details come from the government source that posted it. Updated .