DOT_Pavement_Repair_Detail.pdf
PDF 526 KB Posted
- Solicitation number
- 39447
- Issued by
- New London County, Connecticut
About this file
This is a technical specification document from the Connecticut Department of Transportation detailing pavement repair standards and procedures for trenching operations. The document provides detailed guidance for the Department of Transportation and municipalities, including the Town of Waterford, conducting utility work on state and local roads. The specifications cover pavement repair methodologies for both bituminous and Portland cement concrete (PCC) pavements, addressing various trench configurations including longitudinal and transverse trenching for jointed concrete pavement. The document includes detailed drawings and construction standards for temporary and permanent pavement repairs, with specific requirements for material compaction, lift thickness, tack coat application, and joint sealing procedures. Trench widths range from 6 inches to greater than 12 inches, with corresponding repair protocols and minimum remaining slab lengths established in Table 1 based on total slab length. The specifications establish traffic level requirements, HMA (hot mix asphalt) grades (S0.375 and S0.5), and processed aggregate base material standards compacted in 4-inch lifts, with maximum depths of 20 inches, or 30 inches in rock cut conditions.
The document serves as supporting documentation for the Town of Waterford Utility Commission's Invitation to Bid for replacement of existing plastic water services with new copper water services on Rope Ferry Road, a state road project scheduled for fiscal year 2027. Contractors undertaking utility work within the project scope must adhere to these Connecticut DOT pavement repair specifications to ensure compliance with state road standards. The specifications establish minimum standards for surface restoration following subsurface utility work, requiring contractors to properly saw cut edges, apply tack coats, place asphalt in specified lifts, and seal joints according to the detailed requirements outlined. No pricing information, set-asides, funding sources, or contract award details are contained within this technical specification document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AND SEAL JOINT AFTER PAVING (TYP.)
SAW CUT EDGE, TACK COAT,
(PLACED IN TWO EQUAL LIFTS)
4" HMA S0.5 TRAFFIC LEVEL 2
CONCRETE PAVEMENT
EXISTING BITUMINOUSGREATER THAN 12"
TRENCH WIDTH
12" 12"
AND SEAL JOINT AFTER PAVING (TYP.)
SAW CUT EDGE, TACK COAT,
CONCRETE PAVEMENT
EXISTING BITUMINOUS
CONCRETE PAVEMENT
EXISTING BITUMINOUS
SEAL JOINT AFTER PAVING (TYP.)
SAW CUT EDGE, TACK COAT, AND
EXISTING PCC PAVEMENT TRENCH WIDTH
12" 12" CONCRETE PAVEMENT
EXISTING BITUMINOUS
20" (30" IN ROCK CUT)
6" TO 12"
12" 12" CONCRETE PAVEMENT
EXISTING BITUMINOUS
AFTER PAVING (TYP.)
COAT, AND SEAL JOINT
SAW CUT EDGE, TACK
GREATER THAN 12"
TRENCH WIDTH
(SEE NOTE 1)
FOR JOINTED CONCRETE PAVEMENT
LONGITUDINAL TRENCHING
(SEE NOTE 2)
FOR JOINTED CONCRETE PAVEMENT
TRANSVERSE TRENCHING
EDGE OF SLAB
TRENCH
TRAVEL
DIRECTION OF
TRAVEL
DIRECTION OF
EDGE OF SLAB
TRENCH
(SEE TABLE 1)
REMAINING
MIN. LENGTH
LENGTH (L)
TOTAL SLAB
TRAVEL
DIRECTION OF
TRAVEL
DIRECTION OF
TRENCH WIDTH (TW) TRENCH WIDTH (TW)
TRENCH WIDTH (TW)
TRENCH WIDTH (TW)
TRENCH WIDTH (TW)
TRENCH THROUGH BITUMINOUS CONCRETE
PERMANENT PAVEMENT FOR
(TRENCH WIDTH GREATER THAN 12")
TRENCH THROUGH BITUMINOUS CONCRETE
TEMPORARY PAVEMENT FOR
(TRENCH WIDTH GREATER THAN 12")
THROUGH OVERLAID PORTLAND CEMENT CONCRETE (PCC)
TEMPORARY PAVEMENT FOR TRENCH
(TRENCH WIDTH GREATER THAN 12")
THROUGH OVERLAID PORTLAN CEMENT CONCRETE (PCC)
PERMANENT PAVEMENT FOR TRENCH
MATERIAL COMPACTED IN 4" LIFTS
PROCESSED AGGREGATE BASE
MATERIAL COMPACTED IN 4" LIFTS
PROCESSED AGGREGATE BASE
MATERIAL COMPACTED IN 4" LIFTS
PROCESSED AGGREGATE BASE
MATERIAL COMPACTED IN 4" LIFTS
PROCESSED AGGREGATE BASE
MATERIAL COMPACTED IN 4" LIFTS
PROCESSED AGGREGATE BASE
PCC PAVEMENT
EXISTING
GREATER THAN 12"
CONCRETE PAVEMENT
EXISTING BITUMINOUS
SEAL JOINT AFTER PAVING (TYP.)
SAW CUT EDGE, TACK COAT, AND
6" TO 12"
TRENCH WIDTH (TW)
MATERIAL COMPACTED IN 4" LIFTS
PROCESSED AGGREGATE BASE
20" (30" IN ROCK CUT)
20" (30" IN ROCK CUT)
OR PCC PAVEMENT
EXISTING BITUMINOUS
OR PCC PAVEMENT
EXISTING BITUMINOUS
(TRENCH WIDTH BETWEEN 6" AND 12"
OR OVERLAID PORTLAND CEMENT CONCRETE (PCC)
THROUGH BITUMINOUS CONCRETE
PERMANENT PAVEMENT - FOR NARROW TRENCH
(TRENCH WIDTH BETWEEN 6" AND 12")
OVERLAID PORTLAND CEMENT CONCRETE (PCC)
THROUGH BITUMINOUS CONCRETE OR
TEMPORARY PAVEMENT - FOR NARROW TRENCH
AFTER PAVING (TYP.)
TACK COAT, AND SEAL JOINT
EQUAL LIFTS)
(PLACED IN TWO
TRAFFIC LEVEL 2
4" HMA S0.5
EQUAL LIFTS)
(PLACED IN TWO
TRAFFIC LEVEL 2
4" HMA S0.5
20" (30" IN ROCK CUT)
PORTLAND CEMENT CONCRETE SLAB (TYP.)
LONGITUDINAL JOINT
SLAB CENTERLINE
TRANSVERSE JOINT
PORTLAND CEMENT CONCRETE SLAB (TYP.)
LONGITUDINAL JOINT
TRANSVERSE JOINT
TRANSVERSE JOINT
20" (30" IN ROCK CUT)
TRANSVERSE ENDS OF THE TRENCH
TRAFFIC LEVEL 2, AND SAWCUT
TRAFFIC LEVEL 2 OR, 2" HMA S0.5
MILL 2" THEN PLACE, 2" HMA S0.375
TACK COAT EDGE (TYP.)
TACK COAT EDGE (TYP.)
S0.5 TRAFFIC LEVEL 2
FINAL LIFT SHALL BE 2" HMA
SHALL BE 4"
PAVEMENT THICKNESS
MINIMUM COMPACTED
MULTIPLE 2" - 3" LIFTS
TRAFFIC LEVEL 2 IN
USING HMA S0.375
PAVEMENT THICKNESS
MATCH EXISTING
SHALL BE 6"
PAVEMENT THICKNESS
MINIMUM COMPACTED
FINAL LIFT SHALL BE 2"
MULTIPLE 2" - 3" LIFTS
TRAFFIC LEVEL 2 IN
THICKNESS USING HMA S0.5
MATCH EXISTING PAVEMENT
MULTIPLE 2" - 3" LIFTS
TRAFFIC LEVEL 2 IN
USING HMA S0.5
PAVEMENT THICKNESS
MATCH EXISTING
20" (30" IN ROCK CUT)
GREATER THAN 12"
TRENCH WIDTH
TABLE 1
TOTAL SLAB LENGTH (L) MIN. LENGTH REMAINING
40' OR LONGER 1/4 L
15' - 40' 10'
15' OR SHORTER REBUILD TO NEAREST JOINT
1. LONGITUDINAL TRENCHING FOR JOINTED CONCRETE PAVEMENT:
2. TRANSVERSE TRENCHING FOR JOINTED CONCRETE PAVEMENT:
A.
A.
WITH THE FINAL LIFT BEING 2"
b. PLACE HMA S0.5 TRAFFIC LEVEL 2 IN 2" - 3" LIFTS TO MATCH EXISTING BITUMINOUS CONCRETE PAVEMENT THICKNESS,
a. PLACE HMA S1.0 TRAFFIC LEVEL 2 IN TWO EQUAL 4" - 5" LIFTS TO MATCH EXISTING CONCRETE PAVEMENT THICKNESS
CONCRETE PAVEMENT TO THE EDGE OF ROAD. IN EITHER CASE REBUILD WITH THE FOLLOWING:
FALLS BETWEEN THE LONGITUDINAL JOINT AND THE SLAB CENTERLINE, REMOVE THE ENTIRE CONCRETE SLAB AND BITUMINOUS
AND BITUMINOUS CONCRETE PAVEMENT FROM THE TRENCH EDGE TO THE EDGE OF ROAD. IF THE LONGITUDINAL TRENCH
IF THE LONGITUDINAL TRENCH FALLS BETWEEN THE SLAB CENTERLINE AND THE EDGE OF SLAB, REMOVE CONCRETE
WITH THE FINAL LIFT BEING 2"
b. PLACE HMA S0.5 TRAFFIC LEVEL 2 IN 2" - 3" LIFTS TO MATCH EXISTING BITUMINOUS CONCRETE PAVEMENT THICKNESS,
a. PLACE HMA S1.0 TRAFFIC LEVEL 2 IN TWO EQUAL 4" - 5" LIFTS TO MATCH EXISTING CONCRETE PAVEMENT THICKNESS
TO THE NEAREST TRANSVERSE JOINT SHALL BE REMOVED AND REBUILT AS FOLLOWS:
NEAREST TRANSVERSE JOINT. IF THIS CRITERIA CANNOT BE MET, THE EXISTING SLAB AREA FROM THE TRENCH EDGE
FOR TRANSVERSE TRENCHES, THE MINIMUM SLAB LENGTH AS SHOWN IN TABLE 1 SHALL BE LEFT IN PLACE TO THE
GENERAL NOTES:
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/30/2024
SIGNATURE BLOCK: DRAWING TITLE:
TOWN(S):
VARIOUSTEST PROJECT
PLOTTED DATE:
C:\Users\KIlpatrickdj\State of Connecticut\DOT Engineering Services - Documents\HWY_STD_GUIDE_DWG\B - Going for signatures\Jan 2025 Stnd & Guide Shts\CTDOT_HIGHWAY_GD Jan 2025 [10-30-24].dgn FILE NAME: kilpatrickdj LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
IO
N
DESIGNER/DRAFTER: CHECKED BY:
PAVEMENT REPAIR
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
File details come from the government source that posted it. Updated .