DOT_Pavement_Repair_Detail.pdf

PDF 526 KB Posted

Attached to
REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES FY27 ROPE FERRY ROAD (STATE ROAD)
Solicitation number
IFB# 26-014
Issued by
New London County, Connecticut

About this file

This file contains pavement repair technical specifications and design details from the Connecticut Department of Transportation (CTDOT) for highway maintenance and reconstruction projects. The document provides comprehensive guidance on pavement repair procedures for both bituminous and Portland Cement Concrete (PCC) pavements, detailing specifications for trench repairs, material requirements, and restoration standards across various traffic levels and pavement conditions.

The technical specifications outline repair methodologies for trenches of varying widths (6 inches to greater than 12 inches) through existing bituminous and concrete pavements, with detailed requirements for compaction, lift placement, and joint sealing. Key specifications include the use of HMA S0.5 and HMA S1.0 materials placed in controlled lifts of 2 to 5 inches, processed aggregate base material compacted in 4-inch lifts, and minimum pavement thickness requirements ranging from 2 to 6 inches depending on traffic levels and existing conditions. The document includes Table 1, which establishes minimum slab length requirements for longitudinal and transverse trenching through jointed concrete pavements, ranging from full slab removal for slabs 15 feet or shorter to removal of one-quarter slab length for slabs 40 feet or longer. All specifications reference Traffic Level 2 standards and require proper edge preparation, tack coat application, and joint sealing after paving to ensure pavement integrity and longevity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AND SEAL JOINT AFTER PAVING (TYP.)

SAW CUT EDGE, TACK COAT,

(PLACED IN TWO EQUAL LIFTS)

4" HMA S0.5 TRAFFIC LEVEL 2

CONCRETE PAVEMENT

EXISTING BITUMINOUSGREATER THAN 12"

TRENCH WIDTH

12" 12"

AND SEAL JOINT AFTER PAVING (TYP.)

SAW CUT EDGE, TACK COAT,

CONCRETE PAVEMENT

EXISTING BITUMINOUS

CONCRETE PAVEMENT

EXISTING BITUMINOUS

SEAL JOINT AFTER PAVING (TYP.)

SAW CUT EDGE, TACK COAT, AND

EXISTING PCC PAVEMENT TRENCH WIDTH

12" 12" CONCRETE PAVEMENT

EXISTING BITUMINOUS

20" (30" IN ROCK CUT)

6" TO 12"

12" 12" CONCRETE PAVEMENT

EXISTING BITUMINOUS

AFTER PAVING (TYP.)

COAT, AND SEAL JOINT

SAW CUT EDGE, TACK

GREATER THAN 12"

TRENCH WIDTH

(SEE NOTE 1)

FOR JOINTED CONCRETE PAVEMENT

LONGITUDINAL TRENCHING

(SEE NOTE 2)

FOR JOINTED CONCRETE PAVEMENT

TRANSVERSE TRENCHING

EDGE OF SLAB

TRENCH

TRAVEL

DIRECTION OF

TRAVEL

DIRECTION OF

EDGE OF SLAB

TRENCH

(SEE TABLE 1)

REMAINING

MIN. LENGTH

LENGTH (L)

TOTAL SLAB

TRAVEL

DIRECTION OF

TRAVEL

DIRECTION OF

TRENCH WIDTH (TW) TRENCH WIDTH (TW)

TRENCH WIDTH (TW)

TRENCH WIDTH (TW)

TRENCH WIDTH (TW)

TRENCH THROUGH BITUMINOUS CONCRETE

PERMANENT PAVEMENT FOR

(TRENCH WIDTH GREATER THAN 12")

TRENCH THROUGH BITUMINOUS CONCRETE

TEMPORARY PAVEMENT FOR

(TRENCH WIDTH GREATER THAN 12")

THROUGH OVERLAID PORTLAND CEMENT CONCRETE (PCC)

TEMPORARY PAVEMENT FOR TRENCH

(TRENCH WIDTH GREATER THAN 12")

THROUGH OVERLAID PORTLAN CEMENT CONCRETE (PCC)

PERMANENT PAVEMENT FOR TRENCH

MATERIAL COMPACTED IN 4" LIFTS

PROCESSED AGGREGATE BASE

MATERIAL COMPACTED IN 4" LIFTS

PROCESSED AGGREGATE BASE

MATERIAL COMPACTED IN 4" LIFTS

PROCESSED AGGREGATE BASE

MATERIAL COMPACTED IN 4" LIFTS

PROCESSED AGGREGATE BASE

MATERIAL COMPACTED IN 4" LIFTS

PROCESSED AGGREGATE BASE

PCC PAVEMENT

EXISTING

GREATER THAN 12"

CONCRETE PAVEMENT

EXISTING BITUMINOUS

SEAL JOINT AFTER PAVING (TYP.)

SAW CUT EDGE, TACK COAT, AND

6" TO 12"

TRENCH WIDTH (TW)

MATERIAL COMPACTED IN 4" LIFTS

PROCESSED AGGREGATE BASE

20" (30" IN ROCK CUT)

20" (30" IN ROCK CUT)

OR PCC PAVEMENT

EXISTING BITUMINOUS

OR PCC PAVEMENT

EXISTING BITUMINOUS

(TRENCH WIDTH BETWEEN 6" AND 12"

OR OVERLAID PORTLAND CEMENT CONCRETE (PCC)

THROUGH BITUMINOUS CONCRETE

PERMANENT PAVEMENT - FOR NARROW TRENCH

(TRENCH WIDTH BETWEEN 6" AND 12")

OVERLAID PORTLAND CEMENT CONCRETE (PCC)

THROUGH BITUMINOUS CONCRETE OR

TEMPORARY PAVEMENT - FOR NARROW TRENCH

AFTER PAVING (TYP.)

TACK COAT, AND SEAL JOINT

EQUAL LIFTS)

(PLACED IN TWO

TRAFFIC LEVEL 2

4" HMA S0.5

EQUAL LIFTS)

(PLACED IN TWO

TRAFFIC LEVEL 2

4" HMA S0.5

20" (30" IN ROCK CUT)

PORTLAND CEMENT CONCRETE SLAB (TYP.)

LONGITUDINAL JOINT

SLAB CENTERLINE

TRANSVERSE JOINT

PORTLAND CEMENT CONCRETE SLAB (TYP.)

LONGITUDINAL JOINT

TRANSVERSE JOINT

TRANSVERSE JOINT

20" (30" IN ROCK CUT)

TRANSVERSE ENDS OF THE TRENCH

TRAFFIC LEVEL 2, AND SAWCUT

TRAFFIC LEVEL 2 OR, 2" HMA S0.5

MILL 2" THEN PLACE, 2" HMA S0.375

TACK COAT EDGE (TYP.)

TACK COAT EDGE (TYP.)

S0.5 TRAFFIC LEVEL 2

FINAL LIFT SHALL BE 2" HMA

SHALL BE 4"

PAVEMENT THICKNESS

MINIMUM COMPACTED

MULTIPLE 2" - 3" LIFTS

TRAFFIC LEVEL 2 IN

USING HMA S0.375

PAVEMENT THICKNESS

MATCH EXISTING

SHALL BE 6"

PAVEMENT THICKNESS

MINIMUM COMPACTED

FINAL LIFT SHALL BE 2"

MULTIPLE 2" - 3" LIFTS

TRAFFIC LEVEL 2 IN

THICKNESS USING HMA S0.5

MATCH EXISTING PAVEMENT

MULTIPLE 2" - 3" LIFTS

TRAFFIC LEVEL 2 IN

USING HMA S0.5

PAVEMENT THICKNESS

MATCH EXISTING

20" (30" IN ROCK CUT)

GREATER THAN 12"

TRENCH WIDTH

TABLE 1

TOTAL SLAB LENGTH (L) MIN. LENGTH REMAINING

40' OR LONGER 1/4 L

15' - 40' 10'

15' OR SHORTER REBUILD TO NEAREST JOINT

1. LONGITUDINAL TRENCHING FOR JOINTED CONCRETE PAVEMENT:

2. TRANSVERSE TRENCHING FOR JOINTED CONCRETE PAVEMENT:

A.

A.

WITH THE FINAL LIFT BEING 2"

b. PLACE HMA S0.5 TRAFFIC LEVEL 2 IN 2" - 3" LIFTS TO MATCH EXISTING BITUMINOUS CONCRETE PAVEMENT THICKNESS,

a. PLACE HMA S1.0 TRAFFIC LEVEL 2 IN TWO EQUAL 4" - 5" LIFTS TO MATCH EXISTING CONCRETE PAVEMENT THICKNESS

CONCRETE PAVEMENT TO THE EDGE OF ROAD. IN EITHER CASE REBUILD WITH THE FOLLOWING:

FALLS BETWEEN THE LONGITUDINAL JOINT AND THE SLAB CENTERLINE, REMOVE THE ENTIRE CONCRETE SLAB AND BITUMINOUS

AND BITUMINOUS CONCRETE PAVEMENT FROM THE TRENCH EDGE TO THE EDGE OF ROAD. IF THE LONGITUDINAL TRENCH

IF THE LONGITUDINAL TRENCH FALLS BETWEEN THE SLAB CENTERLINE AND THE EDGE OF SLAB, REMOVE CONCRETE

WITH THE FINAL LIFT BEING 2"

b. PLACE HMA S0.5 TRAFFIC LEVEL 2 IN 2" - 3" LIFTS TO MATCH EXISTING BITUMINOUS CONCRETE PAVEMENT THICKNESS,

a. PLACE HMA S1.0 TRAFFIC LEVEL 2 IN TWO EQUAL 4" - 5" LIFTS TO MATCH EXISTING CONCRETE PAVEMENT THICKNESS

TO THE NEAREST TRANSVERSE JOINT SHALL BE REMOVED AND REBUILT AS FOLLOWS:

NEAREST TRANSVERSE JOINT. IF THIS CRITERIA CANNOT BE MET, THE EXISTING SLAB AREA FROM THE TRENCH EDGE

FOR TRANSVERSE TRENCHES, THE MINIMUM SLAB LENGTH AS SHOWN IN TABLE 1 SHALL BE LEFT IN PLACE TO THE

GENERAL NOTES:

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

10/30/2024

SIGNATURE BLOCK: DRAWING TITLE:

TOWN(S):

VARIOUSTEST PROJECT

PLOTTED DATE:

C:\Users\KIlpatrickdj\State of Connecticut\DOT Engineering Services - Documents\HWY_STD_GUIDE_DWG\B - Going for signatures\Jan 2025 Stnd & Guide Shts\CTDOT_HIGHWAY_GD Jan 2025 [10-30-24].dgn FILE NAME: kilpatrickdj LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

IO

N

DESIGNER/DRAFTER: CHECKED BY:

PAVEMENT REPAIR

TRANSPORTATION

DEPARTMENT OF

CONNECTICUT

File details come from the government source that posted it. Updated .