This document is Addendum 2 for Invitation to Bid DOT-ITB-25-2014-JB, issued by the Florida Department of Transportation (FDOT) District Two Procurement Office for the I10 Madison Eastbound Rest Area Roof project. The addendum provides responses to six bidder questions regarding the roof replacement, clarifying that the project involves replacing metal roofs with like-kind materials, using new gutters matching the original design, and preferring Kynar or equivalent paint. The addendum specifies that only metal roof replacement is required, with no canopy work included, and recommends a site visit to verify minimal damages to the metal storage shed.

The document indicates that bidders are expected to submit a replacement quote for the metal roofs, with the roof structure noted as fully intact. Bidders must acknowledge receipt of the addendum by completing and returning a form with their bid package, with failure to do so potentially resulting in a non-responsive bid status. The addendum also includes standard legal language about protest procedures under Florida Statutes and emphasizes the importance of compliance with the bid requirements. While specific pricing details are not provided in this addendum, it serves to clarify the scope and expectations for potential contractors bidding on the roof replacement project.

View the file

Other files

File Type Posted
DOT-ITB-25-2014-JB.pdf PDF
DOT-ITB-25-2014-JB Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Transportation

RON DESANTIS

GOVERNOR

1109 South Marion Avenue Lake City, FL 32025-5874

JARED W. PERDUE, P.E.

SECRETARY

Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov

DISTRICT TWO

PROCUREMENT OFFICE

ADDENDUM 2

DOT-ITB-25-2014-JB

I10 Madison Eastbound Rest Area Roof

Addendum No. 2 hereby incorporates the following:

1. Provides Answers to Questions received.

The Bidder must acknowledge receipt of this Addendum by completing and returning to the Procurement Office with its bid package by or before the time and date of the bid opening. Failure to do so may deem the Bidder non-responsive.

Company Name

Signature

Date

Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.

Note: All written questions are reproduced in the same format as submitted by the Respondent.

Question Answer

1. Would 7" K style aluminum gutters be acceptable vs the 24 gauge box gutters stated on the request?

1. No. New gutters shall be replaced with the same as originally designed and installed.

2. Are just the metal roofs being replaced, or the canopies also?

2. No canopy work is included.

3. Is there a specific type of paint that is preferred? Such as Kynar or standard SMP?

3. Kynar or its equivalent is preferred.

4. Are you expecting a repair quote and a replacement quote for the metal roofs, or one or the other?

4. Replacement quote for the metal roofs. Repair work is spelled out in scope document is any is needed.

5. I could not find any specific scope of work in the bid documents that explains exactly what repairs are to be done. Could you please elaborate on the exact repairs that FDOT is looking for? For example; fix leak in Mens Bathroom and repair damaged roof of Metal Storage Shed.

5. The roof structure is fully intact, and our intent is to replace with like kind material. Small amount of damage to Metal Storage shed. Site visit needed to verify damages.

6. If you are looking for a repair quote, do you have any records that would tell us the manufacturer of the existing metal roof panel?

6. Please refer to the original site plans.