DOT-250006 Henry/DOT-260012 Wyandot Full-Service Maintenance Facility
Solicitation number
SRC0000035146
Issued by
Harrison County, Ohio

About this file

This is a Request for Qualifications (RFQ) for Registered Design Professional services issued by the Ohio Department of Transportation (ODOT) through the Ohio Facilities Construction Commission (OFCC). The RFQ solicits architectural and engineering services for the concurrent design and development of two Full-Service Maintenance Facilities: one in Napoleon, Henry County (DOT-250006) and one in Upper Sandusky, Wyandot County (DOT-260012). The selected A/E team will provide comprehensive professional services including program verification, schematic design, design development, construction document preparation, bid and award support, construction administration, and post-construction closeout services. Each facility comprises multiple structures including a truck storage building (22,000–22,000 square feet), administration section (4,000 square feet), mechanical services section (7,500 square feet), cold storage structure (8,000–10,000 square feet), salt storage structure, material storage structures, vehicle wash bay (2,800 square feet), and fuel storage and brine/calcium system tanks. The response deadline is November 24, 2025, at 2:00 p.m. local time. ODOT anticipates short-listing the top five ranked A/E teams for interviews, with one or multiple projects potentially awarded to selected firms at the Contracting Authority's discretion. A/E teams must provide not less than 12 hours of on-site construction administration services weekly during construction. The anticipated schedule includes professional services start on March 26, construction notice to proceed on March 27, substantial completion on May 28, and professional services completion on July 28.

The estimated basic fee range is 6.00 to 6.25 percent of the construction cost, adjusting to 5.60 to 5.85 percent if a single A/E team is selected for multiple projects. Both projects are state-funded at $15,104,250 each with construction costs of $13,720,370 per facility. The RFQ requires the lead A/E discipline to be architecture with secondary disciplines including civil engineering, structural engineering, mechanical-electrical-plumbing engineering, and fire protection engineering. Additional service providers must include environmental testing and analysis, surveying, quality assurance testing, and geotechnical testing. A/E firms must participate in the Encouraging Diversity, Growth & Equity (EDGE) Program with a 6.00 to 6.25 percent participation goal and must provide a Commitment to Participate form and Statement of Intent to Contract and to Perform documentation. Submittals must include a Statement of Qualifications (Form F110-330) submitted electronically as a single PDF file via OhioBuys, limited to 25 MB. Evaluation criteria emphasize demonstrated ability to meet programmed project vision, scope, budget, and schedule; relevant project experience; team qualifications; past performance; knowledge of the Ohio Capital Improvements process; and proximity to project sites. The RFQ specifies that LEED and BIM criteria will not be evaluated for this selection, though firms may identify such credentials for informational purposes.

View the file

Other files

File Type Posted
M110-01-AE-Terms-Conditions-2024-FEB.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Registered Design Professional Selection Rating Form State of Ohio Standard Forms and Documents

Administration of Project:

Project Name
Henry Full Service Maintenance Facility

Wyandot Full Service Maintenance Facility

Response Deadline
11/24/2025
2:00 pm
local time
Project Location
Varies
Project Number
DOT-250006

DOT-260012

City / County
Varies / Varies
Project Manager
Varies
Owner
Ohio Department of Transportation
Contracting Authority
OFCC
Delivery Method
General Contracting
Prevailing Wages
State
No. of paper copies requested (stapled, not bound)
0
No. of electronic copies requested (PDF)
1

Request for Qualifications (Registered Design Professional*) State of Ohio Standard Forms and Documents

Request for Qualifications (Registered Design Professional) continued

F110-02-2025-OCTPublish Date: [leave blank]Page 4 of 4
F110-02-2025-OCTPublish Date: [leave blank]Page 3 of 4
* “Registered Design Professional includes any architect holding a certificate issued under section 4703.10 of the Revised Code, any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or any engineer holding a certificate issued under section 4733.14 of the Revised Code.” (Ohio Building Code section 4101:1-2-01 Definitions)

Submit the Statements of Qualifications (Form F110-330) through OhioBuys. See Section J of this RFQ for additional submittal instructions.

Submit all inquiries regarding this RFQ in writing through OhioBuys (no phone calls please). Inquiries will be answered and posted in OhioBuys on a regular basis until the inquiry deadline. The name of the party submitting an inquiry will not be included on the inquiry response.

Project Overview

A. Project Description

The Ohio Department of Transportation (ODOT) is planning on replacing (2) Full-Service Maintenance Facilities in various locations throughout the State. A/E services for these projects will be selected concurrently. It is anticipated that the top five (5) ranked A/E teams will be short listed for interviews. An A/E team may be selected for one or multiple projects at the sole discretion of the Contracting Authority and Owner. These projects and services may be awarded and implemented in a slightly staggered schedule and utilize General Contracting delivery methods for construction contract(s). Each project will be a separate professional service agreement and a separate construction contract.

All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority’s and the Owner’s policies and procedures.

DOT-250006 Henry Full Service Maintenance Facility Latitude 41°25'06.32"N Longitude 84°06'02.76"W Napoleon, Henry County

State Funding:$15,104,250.00
Construction Cost:$13,720,370.00

Full-Service Facility Kit of Parts (Approx. Sizes; selected AE to work with ODOT to develop exact square footage shown below)

Building PurposeAvg. Size
Truck Storage Building22,000sqft
Administration Section4,000sqft
Mechanical Services Section7,500sqft
Cold Storage Structure8,000sqft
Salt Storage Structure (4,000 tons)XXsqft
Material Storage Structure ( 2 bays)XXsqft
Above Ground Fuel Storage TankN/A
Vehicle Wash Bay2,800sqft

Brine/Calcium System tanks (60k)

DOT-260012 Wyandot Full Service Maintenance Facility 10976 County Road 121 Upper Sandusky, Wyandot County

State Funding:$15,104,250.00
Construction Cost:$13,720,370.00

Full-Service Facility Kit of Parts (Approx. Sizes; selected AE to work with ODOT to develop exact square footage shown below)

Building PurposeAvg. Size
Truck Storage Building22,000sqft
Administration Section4,000sqft
Mechanical Services Section7,500sqft
Cold Storage Structure10,000sqft
Salt Storage Structure (5,000 tons)XXsqft
Material Storage Structure (5 bays)XXsqft
Above Ground Fuel Storage Tank12,000gal (split)
Vehicle Wash Bay2,800sqft

Brine/Calcium System 7 tanks (14k each)

B. Scope of Services

For projects advertised with an appropriately developed Program of Requirements (“POR”), upon award of the Agreement, commence with Design. For projects without such a POR, upon award of the Agreement, commence by developing the Program of Requirements.

The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the A/E Agreement detailed cost components to address the Owner’s project requirements. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement.

As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types.

Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.

During the construction period, (at each site) provide not less than 12 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. Note: hours stated above are considered part of the A/E’s Basic Services.

For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ:

1. Project Delivery Method (MP, GC, CMR, DB)

2. Role on project (A/E, C-A/e, AOR-DB, CMA/OA, CMR, DB, GC, Trade)

3. State of Ohio OFCC (Standard Documents / OAKS CI) experience

4. Managing multiple building types

5. Large vehicle storage

6. Large vehicle circulation design requirements

7. Large/bulk material storage

8. PEMB modified for occupancy

9. Compliance with Federal Endangered Species Act (ESA)

C.Estimated Budget / Funding
D.Anticipated Schedule
State Funding:
$Varies
Professional Services Start:
03 / 26
Other Funding:
$0
Construction Notice to Proceed:
03 / 27
Construction Cost:
$Varies
Substantial Completion of all Work:
05 / 28
Total Project Cost:
$Varies, see information above
Professional Services Completed:
07/ 28
E.Estimated Basic Fee Range (see note below)
F.EDGE Participation Goal
6.00% to 6.25%
Percent of initial Total A/E Fee:
.0%

If an A/E team is selected for multiple projects, the Estimated Basic Fee Range adjusts – 5.60% to 5.85% NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents, (5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. The Basic Fee includes all registered design professional services and consultant services necessary for proper completion of the Basic Services, including validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules for the project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above, including the Owner’s contingency. The Basic Fee excludes any Additional Services required for the project.

G.Basic Service Providers Required (see note below)
H.Additional Service Providers Required
Lead A/E Discipline:
Architecture

Environmental Testing and Analysis

Secondary

Surveying

Disciplines:
Civil Engineering

Quality Assurance Testing

Structural Engineering

Air and Water Testing & Balancing

Mechanical-Electrical-Plumbing Eng.

Special Inspections

Fire Protection Engineering

Geotechnical Testing & Analysis

Photo Documentation

NOTE: The lead A/E shall be (1) any architect holding a certificate issued under section 4703.10 of the Revised Code, (2) any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or (3) any engineer holding a certificate issued under section 4733.14 of the Revised Code.

I. Evaluation Criteria for Selection

· Demonstrated ability to meet Owner’s programmed project vision, scope, budget, and schedule on previous projects.

· Previous experience compatible with the proposed project (e.g., type, size).

· Relevant past work of prospective firm’s proposed consultants.

· Past performance of prospective firm and its proposed consultants.

· Qualifications and experience of individuals directly involved with the project.

· Proposer’s previous experience (numbers of projects, sizes of projects) when working with its proposed consultants.

· Specification writing credentials and experience.

· Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPM schedules as a project management resource.

· Approach to and success of using partnering and Alternative Dispute Resolution.

· Proximity of prospective firms to the project site.

· Proposer’s apparent resources and capacity to meet the needs of this project.

· The selected A/E and all its consultants must have the capability to use the Internet within their normal business location(s) during normal business hours.

· LEED and BIM criteria will not be evaluated for this selection. A score of zero has been prefilled on the score sheet.

Interested A/E firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program form in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract with and use EDGE-certified Business(es), as a part of the A/E’s team. The Intent to Contract and to Perform and / or waiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must be attached to the A/E’s Technical Proposal. Both forms can be accessed via the OFCC website at https://ofcc.ohio.gov. The Intent to Contract and to Perform form is again required at the Fee Proposal stage.

If the A/E firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform form signed by both parties with its Statement of Qualifications.

For all Statements of Qualifications, please identify the EDGE-certified Business(es), by name, which will participate in the delivery of the proposed professional services solicited in the RFQ.

Interested A/E firms must indicate on their Statement of Qualifications, the locations where their services will be performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D related to providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting purchases from or investment in any Russian institution or company. Failure to do so may cause their Statement of Qualifications to be rejected.

J. Submittal Instructions

Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC website at https://ofcc.ohio.gov.

Electronic submittals, if requested, should be combined into one PDF file named with the project number listed on the RFQ and your firm’s name, followed by “SOQ”. Use the “print” feature of Adobe Acrobat or similar software for creating a PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then PDF Optimizer. Electronic submittals are limited to a maximum file size of 25 MB.

Paper copies of the Statement of Qualifications, if requested, should be stapled only. Do not use special bindings or coverings of any type. Cover letters and transmittals are not necessary.

CD/DVD copies of the Statement of Qualifications, if requested, should have the sleeve labeled with the project number and firm name, followed by “SOQ”.

Facsimile copies of the Statement of Qualifications will not be accepted.

Firms are requested to identify professional registrations, memberships and credentials including: LEED GA, LEED AP, LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials. Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.

Project Name
Henry Full Service Maintenance Facility

Wyandot Full Service Maintenance Facility

Proposer Firm

Project Number
DOT-250006

DOT-260012

City, State, Zip

Selection Criteria
Value
Score

1. Primary Firm Location, Workload and Size (Maximum 10 points)

a. Proximity of firm to project site
Less than 75 miles
5
75 miles to 150 miles
2
More than 150 miles
0
b. Amount of fees awarded by Contracting Authority in previous 24 months
Less than $500,000
2
$500,000 to $1,000,000
1
More than $1,000,000
0
c. Number of licensed professionals
Less than 3 professionals
1
Max = 3
3 to 6 professionals
2
More than 6 professionals
3

2. Primary Firm Qualifications (Maximum 30 points)

a. Project management lead
Experience / ability of project manager to manage scope / budget / schedule / quality
0 - 10
b. Project design lead
Experience / creativity of project designer to achieve owner’s vision and requirements
0 - 5
Max = 20
c. Technical staff
Experience / ability of technical staff to create fully coordinated construction documents
0 - 3
d. Construction administration staff
Experience / ability of field representative to identify and solve issues during construction
0 - 12

3. Key Consultant Qualifications (Maximum 20 points)

a. Key discipline leads
Experience / ability of key consultants to perform effectively and collaboratively
0 - 15
b. Proposed EDGE-certified Consultant participation*
One point for every 2 percent increase in professional services over the EDGE participation goal
0 - 5

4. Overall Team Qualifications (Maximum 10 points)

a. Previous team collaboration
Less than 3 sample projects
1
Max = 3
3 to 6 sample projects
2
More than 6 sample projects
3
b. LEED** Registered / Certified project experience
Registered LEED v4.0 or v4.1 projects
1
Max = 2
0
Certified LEED v4.0 or v4.1 projects
2
c. BIM project experience
Training and knowledge
1
Max = 3
0
Direct project experience
3
d. Team organization
Clarity of responsibility / communication demonstrated by table of organization
0 - 2

5. Overall Team Experience (Maximum 30 points)

a. Previous team performance
Past performance as indicated by evaluations and letters of reference
0 - 10
b. Experience with similar projects / delivery methods
Less than 4 projects
0 - 3
4 to 6 projects
4 - 6
More than 6 projects
7 - 10
c. Budget and schedule management
Performance in completing projects within original construction budget and schedule
0 - 5
d. Knowledge of Ohio Capital Improvements process
Less than 3projects
0 - 1
3 to 6 projects
2 - 3
More than 6 projects
4 - 5

* Must be comprised of registered professional design consulting firms and NOT the lead firm - For more information on scoring this and other criteria refer to Document F199-01 - PS Selection Rating Rubric.

** Leadership in Energy & Environmental Design administered by Green Business Certification Inc.™ Subtotal

Notes:

Evaluator:

Name

Signature

Date

File details come from the government source that posted it. Updated .