This Description of Service (DOS) outlines requirements for laydown, maintenance, and storage services for three MKVI Patrol Boats for the Michigan National Guard. The contractor will provide personnel, equipment, and support to transport, store, and maintain the vessels currently located at Colonna's Shipyard in Norfolk, VA. The base performance period is from 1 May 2025 to 31 July 2025 (3 months), with two optional one-month extension periods available, and the total performance timeline potentially extending to 4 months.
Key maintenance requirements include monthly inspections for mold/mildew, battery testing, seal maintenance, bilge cleaning, desiccant replacement, exhaust muffler inspections, sand filter maintenance, and pressure washing. The contractor must provide monthly consolidated reports and is prohibited from performing repairs that would increase government costs beyond the contract's scope. The solicitation is a 100% small business set-aside with NAICS code 336611, and quotes are due by 3:00 PM local time on 31 March 2025, with a 90-day quote validity period. The government intends to award a purchase order based on best value using price analysis techniques.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION OF SERVICE
For
Laydown, Maintenance, and Storage Services
MICHIGAN NATIONAL GUARD
1. Description of Service (DOS):
1.1 The contractor shall provide all personnel, equipment, tools, materials, supervision, utilities, and quality control necessary, to provide towing, lifting, laydown, storage, and maintenance support required for three
(3) MKVI Patrol Boats listed below and in Technical Exhibit 1. Services shall be performed at Contractor’s facilities.
1.2 The vessels are currently located at Colonna’s Shipyard, Norfolk, VA. Contractor will be responsible for transportation from current location to awarded Contractor’s facility.
1.3 The estimated period of performance for these services will begin 1 May 2025 for an estimated period of one (1) to four (4) months. Services will be billed monthly and end when services are no longer being rendered. Actual period of performance may change based on award date.
1.3.1 NOTE: Unused months will be removed from the contract once services are no longer being rendered and the government assets are no longer at the contractor’s facility.
1.3.2 The period of performance will include two (2), one-month option periods.
1.3.3 Additional Services will be performed within 10 days of the Government’s request, or exercised option as appropriate, unless approved by the Contracting Officer.
1.4 Estimated Performance and CLIN structure is as follows:
CLIN Contract Period ESTIMATED Performance Dates
0001 Base Period (3 Months) 1 May 2025 – 31 July 2025
0002 Lift Services (6 Each) Within 10 days of Request by Government
1001 Option Period 1 (1 Month) 1 August 2025 – 31 August 2025
2001 Option Period 2 (1 Month) 1 September 2025 – 30 September 2025
3001 Optional Towing Services (6 Each) Within 10 days of Request by Government
2. General
2.1 Quality Assurance (QA). The Government shall evaluate the contractor’s performance under this contract in accordance with this DOS.
2.2 Government remedies. The Contracting Officer will follow the requirements of Federal Acquisition
Regulations (FAR) 52.246-4, Inspection of Services – Fixed-Price, for contractor’s failure to correct non-conforming services. In the event that services fail to conform to contract requirements, and cannot be remedied by re-performance, the Government reserves the right to reduce the contract price to reflect the reduced value of the non-conforming services.
2.3 The contractor shall ensure that timely and effective corrective action is obtained for all deficiencies identified by the Government
2.4 Physical Security. The contractor shall safeguard all government property, equipment and materials provided. At the close of each work period, all property, equipment and materials shall be secured.
2.5. Physical Access. The contractor shall provide uninhibited access to the government’s assets at the government’s request. The government may request access, for itself or a supporting entity (i.e. repair, inspection, testing, etc., not already covered under this DOS), up to three (3) business days prior to the need to access government assets. Access requests will be routed to the contractor through the government Point of Contact (POC). Access will be during normal business hours unless alternative access is coordinated in advance.
2.6 Safety/Environmental: The contractor shall comply with all federal and state Occupational Safety and Health
Administration (OSHA) requirements and standards, technical orders, regulations, and referenced publications as published in the OSHA 29 CFR.
3. Government Property, Materials, Equipment, and Services (GFP/M/E/S).
3.1 With the exception of the items listed in this section, the government will not provide GFP/M/E/S to the contractor for the performance of this requirement.
4. Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1. The contractor shall furnish everything required to perform these services as indicated in Section 1 and 5.
4.2. The contractor shall ensure employees possess any required licenses or certifications necessary to perform services covered within this DOS, which must be presented to the government upon written request.
4.3. Provide and replace any removed fluids with new fluid in accordance with manufacturer specifications to accomplish the services required within this DOS. Contractor is required to procure and install all materials required to accomplish services covered by this DOS.
4.4. Be responsible for all marine travel-lift operation, permits, towing, and crane services required throughout the period of performance.
4.5. Provide any utilities required to facilitate inspection, fit-in, and repair services separately acquired by the government (i.e. shore power 110 & 220v, fresh water).
5.0 Requirement
5.1. Provide all supervision, personnel, equipment, tools, supplies, utilities, and services necessary to perform lifting, laydown, storage, maintenance, and towing services of three (3) MKVI Patrol Boats, hull numbers 78PB-1201, 78PB-1205, and 78PB-1206.
5.1.1. Provide any required initial towing services from current shipyard location in Norfolk, Virginia to awarded contractor’s facility/shipyard.
5.2. Support Services
5.2.1. Provide means (i.e. via fantail, Personnel Recovery Cutouts, etc.) to access each boat for government personnel to access the vessel.
5.2.2. Optional Towing. Upon exercise of the appropriate option, the contractor shall be responsible for all marine travel lift operation, permits, towing, and crane services required to tow all three crafts to a facility of the government’s request within 25 Nautical Miles.
5.2.2.1. Towing to Joint Expeditionary Base – Little Creek, Virginia Beach, VA, via waterway, is expected as part of the optional towing service.
5.3. Maintenance
5.3.1. Conduct a monthly inspection of each craft for mold and mildew, and clean as necessary.
5.3.2 Disconnect and test each battery monthly for voltage. Batteries that are not fully charged will be charged to its maximum capacity listed on the battery label. Provide a monthly testing report to the government POC.
5.3.2.1 Provide list of malfunctioning batteries in the monthly testing report. The government will provide replacement batteries as necessary.
5.3.3. Seal, or maintain any existing seals, all top side hatches and doors with Aluminized Tape, leaving one unsealed for normal entrance and exit (Aft Main Cabin Door) for all craft.
5.3.4. Ensure all bilges are dry and clean on all craft. Conduct a bilge inspection every 2 weeks and provide an inspection report to the government POC.
5.3.5. Reserved
5.3.6. Remove and replace desiccants on each craft every 45 days. Desiccants will be places in the forward storage, galley, berthing, tank room, pump room, main cabin, pilot house, bathroom, shower, and engine room. Cubic Feet per Minute (CFM) desiccants will be determined by the square footage and be sufficient for the room.
5.3.7. Conduct monthly internal and external visual inspection of each exhaust muffler on all crafts, ensuring each exhaust muffler is free of debris and exhaust liquid. If exhausts have been covered and protected, complete a visual inspection of exhaust covers for deterioration and provide in the monthly report to government
POC.
5.3.8. Monthly remove, clean, inspect, and reinstall all external sand filters. If sand filter cannot be cleaned or reinstalled properly, submit report to government POC to provide notice of need for replacement by government.
5.3.9. Complete a monthly low-pressure wash of each craft, ensuring all standing water has been removed after each wash.
5.4. Provide a monthly consolidated report of all inspection/maintenance actions outlined in the DOS.
5.5. The contractor SHALL NOT perform or schedule any repairs or maintenance that would result in an increased cost to the government not already covered under this DOS.
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
DOS
Paragraph
Task Performance
Standard Acceptable Quality
Levels (AQL) Surveillance Method
5.2 Towing and Lift Services
As Needed within 10 days of request
Not more than 2 days late on services
As it occurs, by POC
5.3.1 Mold/Mildew Inspection and
Cleaning Monthly
Not more than 1 missed inspection
Monthly by POC
5.3.2 Battery Testing/Charging Monthly
Not more than 1 missed testing
Monthly by POC
5.3.3 Seal Maintenance As needed
Not more than 1 missed maintenance when required
Monthly by POC
5.3.4 Bilge Inspection/Cleaning, Drying Biweekly
Not more than 1 missed inspection
Not more than 1 instance of unmaintained bilges
Monthly by POC
5.3.6 Replace Desiccants
Every 45 days Not more than 1 missed replacement Monthly by POC
5.3.7 Exhaust Muffler Inspection
& Maintenance Monthly
Not more than 1 missed maintenance/inspection Monthly by POC
5.3.8 Sand Filter Maintenance Monthly
Not more than 1 missed maintenance Monthly by POC
5.3.9 Pressure Washing and standing water removal
Monthly Not more than 1 missed wash Monthly by POC
5.4 Provide a Monthly Report of
all Inspection and Maintenance
Monthly Not more than 1 missed report per period Monthly by POC
TECHNICAL EXHIBIT 2
Deliverables
DOS Paragraph Deliverable Frequency Recipient
5.4 Inspection Report Monthly Government POC
5.2 Towing/Lift Permits As it occurs Government POC