Dorsey Hall Bid Breakdown.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
IFB 27-13: Dorsey Hall Pool Renevation
Solicitation number
145678
Issued by
Howard County, Maryland

About this file

This is a bid breakdown pricing sheet for Invitation for Bids (IFB) 27-13: Dorsey Hall Pool Renovation issued by the State of Maryland. The solicitation requests comprehensive pool renovation services including all labor, materials, equipment, supervision, permits, and incidentals necessary for complete project delivery. The scope of work encompasses fourteen major sections: mobilization and project management, demolition and preparation, pool shell repairs, pressure testing and leak investigation, pool finishes, deck and coping repairs, pool plumbing, electrical work, pool equipment installation, pool cover installation, startup and commissioning, and permits and inspections. Each section is structured as a lump sum item, with subsections detailing specific tasks such as plaster removal, tile removal, crack repairs, structural repairs, waterline tile installation, plaster finishing, concrete repairs, pipe replacement, pool lighting, pump and filter installation, and chemical controllers. The pricing sheet provides designated cells for bidders to enter unit prices and extended prices, with automatic calculation of section subtotals and total lump sum bid amounts.

Bidders are instructed to provide pricing only in shaded cells on the spreadsheet, with all quantities defaulting to one lump sum unless otherwise specified. The sheet includes provision for time-and-material rates (foreman, mechanic, and laborer hourly rates, plus material and equipment markups), which are informational only and excluded from the total lump sum bid. Bidders are required to certify that their bids are complete, include all costs required by the IFB and contract documents, and remain valid for the solicitation period. Any exceptions or clarifications must be identified in the Bidder Notes column or attached documentation. All pricing must be read in conjunction with the complete IFB specifications, drawings, addenda, and contract terms.

View the file

Other files

File Type Posted
27-13 REFERENCES.docx DOCX document
27-13 MINORITY BUSINESS ENTERPRISE (MBE) FORM.docx DOCX document
IFB 27-13 Dorsey Hall Pool Renovations.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

INVITATION FOR BIDS — POOL RENOVATION PRICING SHEET
Bidder shall provide all labor, materials, equipment, supervision, permits, and incidentals required for a complete pool renovation.
IFB NumberBid Due Date
Bidder NameContact Name
AddressPhone / Email
BID INSTRUCTIONS: Enter pricing only in the shaded cells. Quantities default to one lump sum unless otherwise noted. Extended prices and section subtotals calculate automatically. Time-and-material rates are informational and are excluded from the Total Lump Sum Bid.
ItemDescriptionQtyUnitUnit Price / RateExtended PriceBidder Notes / Clarifications
1. Mobilization and Project Management
1.0Mobilization and project management1LS--
Section 1 Subtotal-
2. Demolition and Preparation
2aExisting plaster removal1LS
2bTile removal1LS
2cSurface preparation1LS
Section 2 Subtotal-
3. Pool Shell Repairs
3aCrack repairs1LS
3bStructural repairs1LS
3cBond beam repairs1LS
Section 3 Subtotal-
4. Pressure Testing and Leak Investigation
4aPressure testing1LS
4bReporting of findings1LS
Section 4 Subtotal-
5. Pool Finishes
5aWaterline tile1LS
5bDepth markers1LS
5cPlaster finish1LS
Section 5 Subtotal-
6. Deck and Coping Repairs
6aConcrete repairs1LS
6bJoint sealants1LS
6cCoping repairs/replacement1LS
Section 6 Subtotal-
7. Pool Plumbing
7aPipe replacement1LS
7bFittings and valves1LS
7cMain drain work1LS
Section 7 Subtotal-
8. Electrical
8aPool lighting1LS
8bBonding and grounding1LS
8cAssociated electrical work1LS
Section 8 Subtotal-
9. Pool Equipment
9aPumps1LS
9bFilters1LS
9cChemical controllers1LS
9dMiscellaneous equipment1LS
Section 9 Subtotal-
10. Pool Cover
10aPool cover material1LS
10bAnchors and hardware1LS
10cInstallation1LS
Section 10 Subtotal-
11. Startup and Commissioning
11.0Startup and commissioning1LS
Section 11 Subtotal-
12. Permits and Inspections
12.0Permits, fees, and required inspections1LS
Section 12 Subtotal-
13. Allowances (if applicable)
13.0Allowance amount (describe basis in notes)1LS
Section 13 Subtotal-
14. Time and Material Rates (Excluded from Lump Sum Total)
14aLabor Rate — ForemanHR
14bLabor Rate — MechanicHR
14cLabor Rate — LaborerHR
14dMaterial Markup%
14eEquipment Markup%
15. TOTAL LUMP SUM BID-T&M rates excluded
BIDDER CERTIFICATION
The undersigned certifies that this bid is complete, includes all costs required by the IFB and contract documents, and remains valid for the period stated in the solicitation. Any exceptions or clarifications are identified in the Bidder Notes column or attached to this pricing sheet.
Authorized SignatureDate
Printed Name / TitleCompany
Pricing shall be read in conjunction with the complete IFB, specifications, drawings, addenda, and contract terms.