Dorsey and Lake Colby RFQ Questions andAnswers.pdf
PDF 1 MB Posted
- Solicitation number
- 2136420
- Issued by
- Essex County, New York
About this file
This document is a Questions and Answers file pertaining to a Request for Qualifications (RFQ) issued by the Village of Saranac Lake, New York, for Dorsey Street and Lake Colby Parking Lots Stormwater Upgrades and Lake Colby Beach Site Civil and Engineering Work. The project consists of two phases: Phase 1 involves geotechnical testing to validate green infrastructure suitability at each parking lot site and concept-level design for a future comfort station and pavilion, including approximate location and proposed square footage; Phase 2 includes hazardous materials testing prior to demolition of the existing comfort station, design development phase, and final construction documents for site and civil construction. The project addresses stormwater management at the Dorsey Street Parking Lot (approximately 2.25 acres) and Lake Colby Parking Lot (approximately 0.75 acres), as well as beach site improvements including ADA-compliant paths, fencing to separate the play area and parking lot from the swimming area, and comfort station and pavilion building programming. Cost estimates are required at each design milestone in Phase 2, and consultants must provide a hard copy submission via certified mail in addition to electronic PDF submissions.
Minority and Women-Owned Business Enterprise (MWBE) and Service-Disabled Veteran-Owned Business (SDVOB) requirements apply equally to both Phase 1 and Phase 2, with typical MWBE participation set at 30 percent—comprising 15 percent for NYS-Certified Minority-Owned Business Enterprises and 15 percent for NYS-Certified Women-Owned Business Enterprises. Submission requirements include a cover letter and expression of interest, project approach, schedule and timeline, price proposal by phase and task, cost-saving opportunities, resumes of key personnel, references, past project experience, proof of insurance, and applicable licenses. The Village does not currently have as-built or mapping documentation of existing underground utilities. A playground specialist and fitness area, to be coordinated by the Village with their own specialist, are separate from the comfort station and pavilion improvements at the Lake Colby site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dorsey Street and Lake Colby Parking Lots Stormwater Upgrades and Lake Colby Beach Site Civil and Engineering Work
Questions and Answers
1. We assume that infiltration and other geotechnical testing is required under Phase 1 to validate the suitability of green infrastructure at each parking lot site. Please confirm.
Yes, testing will be required for suitability for green infrastructure at each site.
2. Please confirm the level of design required for the future comfort station and pavilion. It is assumed that they are only to be brought to concept level to establish a program for the site.
We will be looking for an approximate location and proposed square footage for the comfort station and pavilion.
3. Please confirm if hazardous materials testing should be included for the demolition of the existing comfort station under Phase 2. Hazardous materials testing will be required prior to demolition.
Yes hazard materials testing should be completed under phase 2.
4. Please confirm the design deliverable milestones requested in Phase 2. Only Final Construction Documents are identified in the RFP, however theirs is a reference to a Design Development Phase. Should consultants assume at least 2 submissions?
Design Development Phase, and Final Construction Documents?
We would accept 2 submissions design development phase and final construction documents including site and civil construction documents.
5. Please confirm if cost estimate should be provided at each design milestone under
Yes estimates should be included at each milestone in phase 2.
Phase 2.
6. Would you also confirm that ONLY an electronic submission in .pdf format is required? If hard copies are needed, would you please indicate how many you would like?
Please submit a hard copy only via certified mail. One copy is sufficient.
Is there a specific percentage that we need to meet for MWBE? In the RFQ it states that the consultant must coordination with the Community Development and playground specialist for incorporation of future playground/ fitness area.
Typically, MWBE requirements are 30% participation, with 15% for NYS Certified Minority-Owned Business Enterprises (MBE) and 15% for NYS Certified Women- Owned Business Enterprises (WBE)
Please confirm there are no MWBE or SDVOB requirements for Phase 1 and confirm MWBE and SDVOB requirements for Phase 2.
They are the same requirements for both Phase 1 and Phase 2.
7.
8.
Is the consultant supposed to provide a playground specialist and/or plans for the future playground/ fitness area? Is this future playground/ fitness area separate from the comfort station?
For the playground specialist, the Village has someone they are working with.
This is a separate area, to the south of the comfort station.
Do you have any as-built or mapping of the existing underground utilities?
Not at this time.
We have identified below our understanding of the project locations. Please confirm this is correct.
Correct.
Dorsey St Park / Parking Lot Lake Colby Parking Lot and Beach
9.
10.
11.
Figure 1: Lake Colby Beach Survey Needs
Parcel 1:
Approximately
2.25 acres
Parcel 2:
Approximately .75 acres
Figure 1 is referenced in the RFP, which shows survey limits of work, but it’s not attached. Would it be possible to share this figure?
12.
Submission Requirements: We have included the three sections identified in the RFQ, and our understanding of submission requirements based on these three sections. Please confirm if our understanding of submission requirements is correct.
13.
�� Cover Letter / Expression of Interest �� Project Approach �� Schedule / Timeline �� Price Proposal by Phase / Task �� Cost saving opportunities �� Resumes of Key Personnel �� References �� Past Project Experience
Correct, also include your proof of insurance and applicable licenses in your submission.