DOR KABA LOCKS draft_Redacted.pdf

PDF 522 KB Posted

Attached to
KABA LOCKS
Solicitation number
N68836KABALOCKS
Issued by

About this file

Statement of Work Summary

This is a Statement of Work (SOW) for the Naval Air Station (NAS) Pensacola Electronic RFID Locks for Building 601 and 602, Contract Number N00204-26-0001.

The contractor shall provide all labor, materials, locks, and equipment necessary to remove existing locks and replace them with new Commander, Naval Installation Command (CNIC) designated electronic stand-alone locking systems that meet brand name salient characteristics outlined in Facilities Criteria (FC) 4-721-10N dated November 1, 2012 (revised March 20, 2015). Deliverables include eight line items totaling specific quantities of KABA RFID electronic locking components and related equipment: 5 Next Generation Front Desk Units to control KABA 790K RFID locksets; 159 KABA RFID electronic locks with satin chrome finish; 100 spare electronic door locks; 1,000 generic plain white key cards; 24 RFID exit devices with operator controls; 6 RFID card readers with battery backup; 318 KABA 790/RT to Onity trim plates; and 25 RFID 1K wristbands. All equipment and materials must be new.

Services requirements include removal and proper disposal of existing lock systems, professional design services for installation ensuring proper fit and flush strike plates, obtaining accurate job site dimensions, installation of the Front Desk Unit and electronic locks with key card compatibility verification, programming by certified installers, removal of work-related debris in compliance with applicable laws and regulations, onsite supervision throughout the project with daily approval from the UH Manager, and employee travel arrangements to/from NAS Pensacola. The contractor must provide onsite training on system operations, use, and maintenance, plus virtual support consistent with standard commercial practices. Work hours are Monday through Friday, 8:00 a.m. to 4:00 p.m. EST, except weekends and federal holidays. The project must start within 10 weeks after contract award and be completed within 25 weeks. Contractor personnel must comply with Defense Biometric Identification System (DBIDS) requirements for base access. A two-year conversion warranty covering materials and workmanship applies to all products delivered.

View the file

Other files

File Type Posted
Sources Sought-KABA LOCKS-SAM.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .