Doors_and_Locks_Bldg_F_Spec_Binder.pdf

PDF 4 MB Posted

Attached to
Corrections Security Package - Building F
Solicitation number
Y23-736
Issued by
Orange County, Orlando City, Florida

About this file

This document is a comprehensive project specification file for the Orange County Corrections Department in Orange County, Florida, detailing a Corrections Security Package for Building F door replacement. The project involves modifying and replacing sliding detention doors, door hardware, and associated control systems for Building F, with an estimated project cost of $4,000,000. The sealed offers were to be submitted electronically via the OpenGov e-Procurement Platform by 4:00 pm EST on Thursday, January 12, 2023. The specifications cover detailed requirements for detention security hollow metal doors, door hardware, security fasteners, glazing, electrical work, and monitoring and control systems, with a focus on ensuring secure and functional door operations within the corrections facility.

The project specifications indicate a comprehensive approach to door replacement, including requirements for PLC-based monitoring systems, relay assemblies, touchscreen control interfaces, and specific technical specifications for components like doors, frames, hinges, locks, and electrical connections. The documentation provides extensive technical details on installation methods, material requirements, testing procedures, and integration with existing facility systems. While the exact funding source is not explicitly detailed, the project appears to be a capital improvement initiative for the Orange County Corrections facility, with a significant investment in upgrading security infrastructure and door control mechanisms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Corrections Building F – Door Replacement

Orange County Corrections Orlando, Florida

Board of Commissioners Orange County, Florida

Bid Documents Date: 2021/5/18

TABLE OF CONTENTS

SECTION 000110 Page 1 of 2

Strollo Architects 000110 - 1 Construction Documents 2021/5/18

Orange County Corrections – Orange County, Florida Building F - Door Replacement

ORANGE COUNTY CORRECTIONS

Building F Door Replacement

DIVISION 0 - CONDITIONS

000000 COVER

000110 TABLE OF CONTENTS

000115 LIST OF DRAWINGS

007363.13 SECURITY REQUIREMENTS

007363.16 SECURITY REQUIREMENTS

007363.19 SECURITY REQUIREMENTS (VENDOR GATE PASS AUTHORIZATION)

007363.23 SECURITY REQUIREMENTS

007363.26 SECURITY REQUIREMENTS (HOT WORK PERMIT – ZURICH FORM)

DIVISION 1 - GENERAL REQUIREMENTS

010050 ADMINISTRATIVE PROVISIONS

011100 SUMMARY OF WORK

012300 ALTERNATES

012513 PRODUCT SUBSTITUTIONS

012600 MODIFICATION PROCEDURES

012900 PAYMENT PROCEDURES

013100 PROJECT MANAGEMENT AND COORDINATION

013113 PROJECT COORDINATION

013119 PROJECT MEETINGS

013200 CONSTRUCTION PROGRESS DOCUMENTATION

013213 PRE-CONSTRUCTION VIDEO

013233 PHOTOGRAPHIC DOCUMENTATION

013300 SUBMITTAL PROCEDURES

014200 REFERENCES

014300 QUALITY ASSURANCE

016000 PRODUCT REQUIREMENTS

017300 EXECUTION

017329 CUTTING AND PATCHING

017700 CLOSEOUT PROCEDURES

017823 OPERATION & MAINTENANCE DATA

017836 WARRANTIES AND BONDS

DIVISION 2 – EXISTING CONDITIONS

024113 – SELECTIVE DEMOLITION

DIVISION 4 - MASONRY

042200 – UNIT MASONRY (GROUT)

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

078400 FIRESTOPPING

079200 JOINT SEALANTS

079216 HIGH STRENGTH SEALANTS

DIVISION 8 – DOORS AND WINDOWS

083463 DETENTION SECURITY HOLLOW METAL DOORS AND FRAMES

Orange County Corrections – Orange County, Florida TABLE OF CONTENTS Building D - Door Replacement SECTION 000110 Page 2 of 2

Strollo Architects 000110 - 2 Construction Documents 2021/5/18

087153 SECURITY FASTENERS

087163 DETENTION DOOR HARDWARE

088853 SECURITY GLAZING

DIVISION 9 - FINISHES

099100 PAINTING

DIVISION 26 - ELECTRICAL

260500 COMMON WORK RESULTS FOR ELECTRICAL

260519 LOW VOLTAGE CONDUCTORS AND CABLES

260526 GROUNDING AND BONDING

260529 HANGERS AND SUPPORTS

260533 RACEWAYS AND BOXES

260553 IDENTIFICATION OF ELECTRICAL SYSTEMS

262726 WIRING DEVICES

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

280513 CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY

285211 DETENTION MONITORING AND CONTROL SYSTEMS

END OF SECTION 000110

Orange County Corrections – Orange County, Florida LIST OF DRAWINGS Building D – Door Replacement SECTION 000115 Page 1 of 1

Strollo Architects 000115 - 1 Construction Documents 2021/5/18

SECTION 000115 – LIST OF DRAWINGS

A. GENERAL DRAWINGS

1. G-1 COVER SHEET

2. G-2 INDEX OF DRAWINGS

3. G-3 LIST OF ABBREVIATIONS, SYMBOLS AND CODE DATA

B. ARCHITECTURAL DRAWINGS

CAMPUS SITE PLAN

BUILDING F - FLOOR PLAN - FIRST LEVEL, & DOOR SCHEDULE

BUILDING F - FLOOR PLAN - SECOND LEVEL, & DOOR

BUILDING F - FLOOR PLAN - THIRD LEVEL, & DOOR

SCHEDULE

BUILDING F - FLOOR PLAN - FOURTH LEVEL, & DOOR

BUILDING F DOOR ELEVATIONS

ALL BUILDINGS DOOR DETAILS, SLIDERS, AND CONTROL

ALL BUILDINGS DOOR DETAILS, SLIDERS, AND CONTROL

1. A1.1

2. F A2.1

3. F A2.2

SCHEDULE

4. F A2.3

5. F A2.4

SCHEDULE

6. F A3.1

7. A5.1

DOORS

8. F A5.2

DOORS

C. ELECTRICAL DRAWINGS

1. E0.1

2. F-ED2.1

3. F-ED2.2

4. F-ED2.3

5. F-ED2.4

6. F-E2.1

7. F-E2.2

8. F-E2.3

9. F-E2.4

ELECTRICAL SYMBOLS AND LEGEND

BUILDING F ELECTRICAL DEMO FLOOR PLAN FIRST FLOOR

BUILDING F ELECTRICAL DEMO FLOOR PLAN SECOND FLOOR

BUILDING F ELECTRICAL DEMO FLOOR PLAN THIRD FLOOR

BUILDING F ELECTRICAL DEMO FLOOR PLAN FOURTH FLOOR

BUILDING F ELECTRICAL FLOOR PLAN FIRST FLOOR

BUILDING F ELECTRICAL FLOOR PLAN SECOND FLOOR

BUILDING F ELECTRICAL FLOOR PLAN THIRD FLOOR

BUILDING F ELECTRICAL FLOOR PLAN FOURTH FLOOR

Orange County Corrections – Orange County, Florida SECURITY REQUIREMENTS Building D - Door Replacement SECTION 007363.13 Page 1 of 5

Strollo Architects 007363 - 1

Construction Documents 2021/5/18

SUPPLEMENTAL CONDITIONS / SPECIAL PROVISIONS

Authorization To Access The Corrections Compound

Rules For Working On The Corrections Compound

Building D - Door Replacement SECTION 007363.13 Page 2 of 5

Strollo Architects 007363 - 2

Construction Documents 2021/5/18

Authorization to Access Corrections Compound

All contractors and vendors must submit a Security Access Request for every person they want to have working on the Corrections Compound.

The Access will be provided to the awarded bidder. This must be completed and emailed as directed on the form. Notification of the approved personnel will be made within 5-7 days of submitting the properly executed form.

Please be advised:

• If an active warrant is in the system the person will not be permitted to work on the Corrections Compound and law enforcement will be notified.

• No persons can be on active community supervision to include those on active probation/parole, Home Confinement or those currently residing in a Work Release Facility.

• Persons can have no previous convictions related to theft, violence, or drugs. They will not be allowed to work on the Corrections Compound.

Building D - Door Replacement SECTION 007363.13 Page 3 of 5

Strollo Architects 007363 - 3

Construction Documents 2021/5/18

Please be sure your personnel and subcontractors are aware of these regulations. To save time and effort, please do not submit information on individuals unless you are fairly certain these stipulations can be met.

END OF DOCUMENT

Building D - Door Replacement SECTION 007363.13 Page 4 of 5

Strollo Architects 007363 - 4

Construction Documents 2021/5/18

Rules For Working On The Corrections Compound

1. Carry a valid ID at all times.

2. Only authorized employees from a company are allowed to work at a job site. WORK

RELEASE INMATES ARE NOT AUTHORIZED TO WORK ON ANY JAIL PROJECT.

3. Wear your contractor issued ID on the collar of your shirt at all times while on the jail compound. This will be issued to each employee at the North Perimeter Building and will only be given upon surrendering a valid ID.

4. If the contractor ID is lost, report it immediately to your point of contact.

5. The use of all tobacco products is prohibited on Orange County Property. (This includes chewing tobacco, dip, snuff etc).

6. No hats or sunglasses are allowed inside any jail.

7. Only one (1) contractor cell phone is allowed inside the facility unless authorized by Corrections.

8. Vehicles are to be parked in authorized areas only, have all windows rolled up, all doors locked, and the provided “club” installed on the steering wheel at all times.

9. At no time are contractors allowed to leave keys in unattended equipment such as lifts or lulls.

10. All contents within any authorized company vehicles entering or exiting the jail compound must be inventoried and searched, bring in only what you must to expedite this process.

Building D - Door Replacement SECTION 007363.13 Page 5 of 5

Strollo Architects 007363 - 5

Construction Documents 2021/5/18

11. During breaks, if you leave an area, all tools including ladders must be removed. Do not leave clothing unattended (jackets, etc.).

12. If utility services are going to be impacted ensure it is properly scheduled. If unplanned utility services are impacted, report it immediately to your point of contact.

13. Inside a jail, if it becomes necessary to cut into walls, ceilings, floors, or ducts, ensure your point of contact knows prior to this taking place. If an opening must remain beyond the work day, secure any temporary penetrations made in any walls, ceilings, floors or ducts with, at a minimum, ¾” plywood or steel, using security fasteners that cannot be easily removed.

14. At the end of the workday, ensure you have collected all tools and debris. Conduct an inspection of all areas you have worked ensuring you have all tools accounted for.

15. No illegal drugs or drug paraphernalia are allowed on the compound.

16. No alcohol is allowed on the jail compound nor are contractors allowed to work on the compound if they have consumed any alcohol.

17. No weapons, guns or ammunition, are allowed on the compound.

18. No inmate interaction is permitted. This includes talking to or giving or receiving anything.

19. Only use storage areas approved at the beginning of the job unless otherwise permitted by Corrections.

20. No corrections employee can change the scope of your work; only the Capital Projects

PM.

END OF DOCUMENT

Building D – Door Replacement SECTION 007363.16 Page 1 of 1

Strollo Architects 007363 - 1

Construction Documents 2021/5/18

PAGE IS INTENTIONALLY BLANK

OCCD Form Vendor Gate Pass Authorization (OP-26) Rev. 03/10

PERMISSION TO ALLOW LIMITED ACCESS

TO THE REQUESTOR

Please submit the following information for personnel that require access to Orange County buildings to perform vendor services, delivery, installation, or construction activities. If any of the below-listed individuals require a key, access card, or will be unescorted in sensitive areas, then Court Security will run an FCIC/NCIC background check.

PLEASE TYPE INFORMATION

Requestor Name Office

Date

Type Access Vendor Supplier Contractor Temporary Employee

First (Legal) MI Last Race/Sex DOB DL # ST SS#

COMPANY CONTACT NO.

CONTACT NAME

DESTINATION/WORK AREA

TYPE OF WORK/ SERVICE

PERIOD OF ADMITTANCE

TIME FROM TO

DATES FROM TO

ACCESS LEVEL:

KEY (S) CARD(S) ESCORTED

YES NO YES NO YES NO

OFFICIAL USE ONLY

To:

From:

This is to inform you that we grant permission for the above individual(s) to access the building to perform the indicated work. Their access is limited only to the areas and periods indicated, and as necessary to perform the work described in the attached project permit. If you have questions or concerns, please contact Sgt. Jeff Adkins @ 407-836-3692. You can fax this form to 407- 836-3378. You must email this form to michaeljeffrey.adkins@ocfl.net

(This arrangement is not valid unless an authorized signature and date appears above.)

Date Request received from Vendor:

Date Sent to OCCD: Date Results received from

OCCD:

Date Requester Notified: Date entered in Vendor List:

Above Personnel Approved Note: See Exceptions

Initial

Building D – Door Replacement SECTION 007363.23 Page 1 of 2

Strollo Architects 007363 - 1

Construction Documents 2021/5/18

ATTACHMENT I

A. CONSTRUCTION CONTRACTOR, SPECIALTY TECHNICIAN, AND VENDOR

RULES FOR WORKING AT THE ORANGE COUNTY CORRECTIONS DEPARTMENT

B. AM.601 CONSULTANTS, CONTRACT PERSONNEL, AND VENDORS (08/10)

1. Carry a valid ID at all times

2. Only authorized employees from a company are allowed to work at a job site.

WORK RELEASE INMATES ARE NOT AUTHORIZED TO WORK ON ANY JAIL

PROJECT

3. Wear your contractor issued ID on the collar of your shirt at all times while on the jail compound. This will be issued to each employee at the North Perimeter Building and will only be given upon surrendering a valid ID

4. If the contractor ID is lost, report it immediately to your point of contact

5. In an emergency, report it to the nearest Corrections staff member. They can contact 911 for you

6. Follow direction of Corrections staff at all times

7. Effective January 1, 2010, the use of all tobacco products will be prohibited on

Orange County Property. (This includes chewing tobacco, dip, snuff etc)

8. No hats or sunglasses are allowed inside any jail

9. Only one (1) contractor cell phone is allowed inside the facility unless authorized by Corrections

10. Vehicles are to be parked in authorized/designated areas only, have all windows rolled up, all doors locked, and the provided “club” installed on the steering wheel at all times. Violators will be towed at their expense.

11. During breaks, if you leave an area, all tools including ladders must be removed

12. All contents within any authorized company vehicles entering or exiting the jail compound must be inventoried and searched, bring in only what you must to expedite this process

13. If utility services are going to be impacted ensure it is scheduled

14. If unplanned utility services are impacted, report it immediately to your point of contact

15. Inside a jail, if it becomes necessary to cut into walls, ceilings, floors, or ducts, ensure your point of contact knows prior to this taking place. If an opening must remain beyond the work day, secure any temporary penetrations made in any walls, ceilings, floors or ducts with, at a minimum, ¾” plywood or steel, using security fasteners that cannot be easily removed

16. At the end of the workday, ensure you have collected all tools and debris. Conduct an inspection of all areas you have worked ensuring you have all tools accounted for

17. No illegal drugs or drug paraphernalia are allowed on the compound

18. No alcohol is allowed on the jail compound nor are contractors allowed to work on the compound if they have consumed any alcohol

19. No weapons, guns or ammunition, are allowed on the compound

20. No inmate interaction is permitted. This includes talking to or giving or receiving anything, including cigarettes

21. Only use storage areas approved at the beginning of the job unless otherwise permitted by Corrections

22. Do not leave clothing unattended, including jackets, hats and sunglasses

Building D – Door Replacement SECTION 007363.23 Page 2 of 2

Strollo Architects 007363 - 2

Construction Documents 2021/5/18

23. At no time are contractors allowed to leave keys in unattended equipment such as lifts or lulls

24. No corrections employee can change the scope of your work

25. Review and comply with OCCD Administrative Order AM.601, “Consultants, contract Personnel, Construction Contractors, Specialty Technicians, and vendors.

26. No glass bottles or containers, aluminum cans, or metal silverware are allowed on the compound.

END OF SECTION 007363

A 1-

9- D

(0 1/

-0

Part 1 – Supervisor Copy

Permit for welding, cutting, hot work Risk Engineering

Supervisor:

1. Complete precaution and safeguard checklist at right.

2. Complete the form and retain Part 1.

3. Issue Part 2 to competent person doing the job.

4. Verify fire watch.

Hot work done by:

Employee

Contractor

Permit number

Location/building/floor

Work to be done

Person doing job (print and sign name)

Supervisor signature

I have verified that the above location has been inspected and the required precautions and safeguards have been taken. Permission is authorized only for the above work.

Date permit expires Time

Date work completed Time

Welder signature

Sprinkler protection in service and hose and extinguishers available.

Hot work equipment in good repair.

Requirements within 35 feet (11 meters) of work

Flammable liquids and combustible material removed from area.

Floors swept and overhead structure clean from dust, lint and debris.

Fire-resistive covers and metal shields provided as needed.

All floor and wall openings covered and/or protected.

Walls/ceilings: remove combustibles away from opposite side or adjacent structures.

Work on enclosed equipment

Adequate ventilation provided.

Thoroughly clean and remove all flammables and combustibles.

Atmosphere checked with gas detector.

Purge any flammable vapors.

Concealed space/lockout permits, if required.

Fire watch

Trained and equipped fire watch provided during operations and at least 30 minutes after.

(Note: 60 minutes for torch applied roofing.)

A final check-up of work area and adjacent areas must be conducted every 30 minutes until 4 hours after completion.

Special instructions

Final check-up date Time

Fire watcher signature

BEFORE STARTING HOT WORK, REVIEW ALL SAFETY PRECAUTIONS.

CAN THIS JOB BE AVOIDED OR IS THERE A SAFER WAY?

This permit is required for any temporary operation involving open flame or producing heat and/ or sparks: welding, cutting, brazing, grinding, soldering, or using a torch to thaw piping or heat material. The permit applies to only this job, in the area specified, during the time and date noted.

Instructions

Permit information

Precaution and safeguard checklist initiator:Cecelia.Allen@ocfl.net;wfState:returned;wfType:email;workflowId:d429acfb2813d047a1790ff2784e9918

Part 2 – Employee/Contractor Copy

Permit for welding, cutting, hot work Risk Engineering

Supervisor:

1. Complete precaution and safeguard checklist at right.

2. Complete the form and retain Part 1.

3. Issue Part 2 to competent person doing the job.

4. Verify fire watch.

Hot work done by:

Employee

Contractor

Permit number

Location/building/floor

Work to be done

Person doing job (print and sign name)

Supervisor signature

I have verified that the above location has been inspected and the required precautions and safeguards have been taken. Permission is authorized only for the above work.

Date permit expires Time

Date work completed Time

Welder signature

Sprinkler protection in service and hose and extinguishers available.

Hot work equipment in good repair.

Requirements within 35 feet (11 meters) of work

Flammable liquids and combustible material removed from area.

Floors swept and overhead structure clean from dust, lint and debris.

Fire-resistive covers and metal shields provided as needed.

All floor and wall openings covered and/or protected.

Walls/ceilings: remove combustibles away from opposite side or adjacent structures.

Work on enclosed equipment

Adequate ventilation provided.

Thoroughly clean and remove all flammables and combustibles.

Atmosphere checked with gas detector.

Purge any flammable vapors.

Concealed space/lockout permits, if required.

Fire watch

Trained and equipped fire watch provided during operations and at least 30 minutes after.

(Note: 60 minutes for torch applied roofing.)

A final check-up of work area and adjacent areas must be conducted every 30 minutes until 4 hours after completion. Return tag to supervisor upon completion of fire watch.

Special instructions

Final check-up date Time

Fire watcher signature

BEFORE STARTING HOT WORK, REVIEW ALL SAFETY PRECAUTIONS.

CAN THIS JOB BE AVOIDED OR IS THERE A SAFER WAY?

This permit is required for any temporary operation involving open flame or producing heat and/ or sparks: welding, cutting, brazing, grinding, soldering, or using a torch to thaw piping or heat material. The permit applies to only this job, in the area specified, during the time and date noted.

Instructions

Permit information

Precaution and safeguard checklist

A 1-

9- D

(0 1/

-0

WARNING!

HOT WORK IN PROGRESS

WATCH FOR FIRE!

Call

A 1-

9- D

(0 1/

-0

At

Maintain watch throughout work. Watch must be maintained uninterrupted throughout lunch, breaks and ensuing shifts.

Maintain watch for 30 minutes following the completion of work (60 minutes for torch-applied roofing).

In case of an emergency

Fire watch

Orange County Corrections – Orange County, Florida ADMINISTRATIVE PROVISIONS Building D – Door Replacements SECTION 010050 Page 1 of 2

Strollo Architects 010050 - 1

Construction Documents 2021/5/18

SECTION 010050 – ADMINISTRATIVE PROVISIONS

PART 1 - GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

A. Work of this Contract comprises building and related construction work to produce a complete and functional facility including but not limited to scope of work as shown on the construction documents.

1.2 CONTRACT METHOD

A. Construct the work under a single lump sum contract (or as otherwise defined in bid documents).

1.3 COORDINATION

A. Coordinate work of the various Sections of Specifications to assure efficient and orderly sequence of installation of construction elements, with provisions for accommodating items installed later.

B. Verify characteristics of elements of interrelated operating equipment are compatible;

coordinate work of various Sections having interdependent responsibilities for installing, connecting to and placing in service, such equipment. Differences shall be brought to the Owner’s attention during bid process or remain the responsibility of the Contractor.

C. Execute cutting and patching to integrate elements of work, uncover ill timed, defective and nonconforming work, provide openings for penetrations of existing surfaces and provide samples as specified in individual sections for testing. Seal penetrations of existing surfaces and provide samples as specified in individual sections for testing. Seal penetrations through floors, walls and ceilings, and fire safe where necessary as part of the lump sum price.

1.4 REFERENCE STANDARDS

A. For products specified by association or trade standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.

B. The date of the standard is that in effect when a specified date is specified.

C. Obtain copies of referenced standards listed in individual specification sections. Maintain copy at job site during progress of the specific work.

Orange County Corrections – Orange County, Florida ADMINISTRATIVE PROVISIONS Building D – Door Replacements SECTION 010050 Page 2 of 2

Strollo Architects 010050 - 2

Construction Documents 2021/5/18

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END OF SECTION 010050

Orange County Corrections – Orange County, Florida SUMMARY OF WORK Building D – Door Replacement SECTION 011100 Page 1 of 6

Strollo Architects 011100 - 1

Construction Documents 2021/5/18

SECTION 011100 – SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Type of the Contract.

3. Use of premises.

4. Specification formats and conventions.

1.2 PROJECT INFORMATION

A. Project Identification: Orange County Corrections – Building D – Door Replacement

1. Location: 3723 Vision Boulevard, Orlando, FL 32801

B. Owner: Orange County Government C. Architect: Strollo Architects, Inc. Orlando, FL

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of the Project is defined by the Contract Documents and consists of the following:

1. Selective demolition: Remove and replace existing sliding trap door mechanisms and controls from D building.

a. Install new sliding door operating mechanism and repair/refurbish existing frames and security glazing

b. Install new controls

c. Repair existing flooring at doors.

d. Patch and Paint existing CMU walls

e. Strip and re-paint existing doors and frames

1.4 TYPE OF CONTRACT

A. Project will be constructed under a single prime contract.

1.5 USE OF PREMISES

A. A. General: Contractor shall have limited use of premises for construction operations as indicated on Drawings by the Contract limits.

Building D – Door Replacement SECTION 011100 Page 2 of 6

Strollo Architects 011100 - 2

Construction Documents 2021/5/18

B. Use of Site: Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits: Constructions operations will be confined to areas within the Contract limits indicated.

2. Corrections Facilities operates on a 24-hour a day 7-day a week basis.

3. Minimize any disruption to all operating areas, including parking areas.

a. Existing systems shall remain in operation during the construction period, excluding times required for installation of new work. Schedule and coordinate all times of interrupted service with the OCCD.

b. Schedule and coordinate with the OCCD any shut down or disruption to public services or any existing systems a minimum of 72 hours (3 business days excluding weekends and holidays) in advance.

4. Provide all temporary directional signage, safety, and barricading required for passenger services.

a. Submit a plan indicating signage, safety, and barricading, at the pre-construction meeting.

b. Directional signing at the access gate and or along the delivery route to the storage area or work site shall be as directed by the OCCD.

5. Confine operations to areas within Contract limits indicated. Portions of the site beyond areas in which construction operations are indicated are not to be disturbed.

6. Access to site shall be shown on the plans or as directed by the OCCD. Do not permit any unauthorized construction personnel or traffic on the site. Immediately clean-up any debris deposited along the access road as a result of construction traffic.

a. Keep driveways and entrances serving the premises clear and available to the Owner, Tenant, and their employees at all times, and the public. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on site.

7. All material orders for delivery to the site will use as a delivery address the access point at the Contractor’s storage site.

a. Delivery of materials and removal of demolished and discarded materials shall be scheduled as follows. Coordinate with the OAR and allow for the least possible disruption of the facilities normal operations.

8. The limits of construction material storage areas, equipment storage areas, and parking areas shall be as indicated in the documents or as directed by the OCCD.

Erect and maintain suitable fencing, marking and warning devices suitable for both day/night use to delineate the perimeter of all such areas.

C. Access to Corrections Secure Compound

1. All contractors and vendors must submit a Security Access Request for every person they want to have working on the Corrections Compound.

Building D – Door Replacement SECTION 011100 Page 3 of 6

Strollo Architects 011100 - 3

Construction Documents 2021/5/18

a. The Access form will be provided to the successful bidder. This must be completed and emailed as directed on the form. Notification of the approved personnel will be made within 5-7 days of submitting the properly executed form.

2. If an active warrant is in the system the person will not be permitted to work on the Corrections Compound and law enforcement will be notified.

3. No persons can be on active community supervision to include those on active probation/parole, Home Confinement or those currently residing in a Work Release Facility.

4. Persons can have no previous convictions related to theft, violence, or drugs. They will not be allowed to work on the Corrections Compound.

a. Please be sure your personnel are aware of these regulations. To save time and effort, please do not submit information on individuals unless you are fairly certain these stipulations can be met.

5. Rules For Working On The Corrections Compound

6. Carry a valid ID at all times.

7. Only authorized employees from a company are allowed to work at a job site.

WORK RELEASE INMATES ARE NOT AUTHORIZED TO WORK ON ANY JAIL

PROJECT.

8. Wear your contractor issued ID on the collar of your shirt at all times while on the jail compound. This will be issued to each employee at the North Perimeter Building and will only be given upon surrendering a valid ID.

9. If the contractor ID is lost, report it immediately to your point of contact.

10. The use of all tobacco products is prohibited on Orange County Property. (This includes chewing tobacco, dip, snuff etc).

11. No hats or sunglasses are allowed inside any jail.

12. Only one (1) contractor cell phone is allowed inside the facility unless authorized by Corrections.

13. Vehicles are to be parked in authorized areas only, have all windows rolled up, all doors locked, and the provided “club” installed on the steering wheel at all times.

14. At no time are contractors allowed to leave keys in unattended equipment such as lifts or lulls.

15. All contents within any authorized company vehicles entering or exiting the jail compound must be inventoried and searched bring in only what you must to expedite this process.

16. During breaks, if you leave an area, all tools including ladders must be removed.

Do not leave clothing unattended (jackets, etc).

17. If utility services are going to be impacted ensure it is properly scheduled. If unplanned utility services are impacted, report it immediately to your point of contact.

18. Inside a jail, if it becomes necessary to cut into walls, ceilings, floors, or ducts, ensure your point of contact knows prior to this taking place. If an opening must

19. remain beyond the workday, secure any temporary penetrations made in any walls, ceilings, floors or ducts with, at a minimum, ¾” plywood or steel, using security fasteners that cannot be easily removed.

20. At the end of the workday, ensure you have collected all tools and debris. Conduct an inspection of all areas you have worked ensuring you have all tools accounted for.

Building D – Door Replacement SECTION 011100 Page 4 of 6

Strollo Architects 011100 - 4

Construction Documents 2021/5/18

21. No illegal drugs or drug paraphernalia are allowed on the compound.

22. No alcohol is allowed on the jail compound nor are contractors allowed to work on the compound if they have consumed any alcohol.

23. No weapons, guns or ammunition, are allowed on the compound.

24. No inmate interaction is permitted. This includes talking, giving or receiving anything.

25. Only use storage areas approved at the beginning of the job unless otherwise permitted by Corrections.

26. No corrections employee can change the scope of your work; only the Capital

Projects PM.

1.6 WORK RESTRICTIONS

A. Work Restrictions: As directed by the Owner.

1. Comply with limitations on use of public streets and other requirements of authorities having jurisdiction.

B. On-Site Work Hours:

1. Work shall be performed after 6:00am and the area shall be cleaned before 6:00pm.

2. Weekend Hours: Coordinate with Owner.

3. Early Morning Hours: Coordinate with Owner.

4. Hours for Utility Shutdowns: Coordinate with Owner.

C. Deliveries: All deliveries shall be to the construction site.

D. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

1. Notify Owner not less than 72 hours in advance of proposed utility interruptions.

2. Obtain Owner's written permission before proceeding with utility interruptions.

E. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner.

1. Notify Owner not less than two days in advance of proposed disruptive operations.

2. Obtain Owner's written permission before proceeding with disruptive operations.

1.7 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

Building D – Door Replacement SECTION 011100 Page 5 of 6

Strollo Architects 011100 - 5

Construction Documents 2021/5/18

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

1.8 SECURITY REQUIREMENTS FOR WORK AT THE ORANGE COUNTY

CORRECTIONS FACILITY

A. Security and Identification

1. All costs for background investigations will be Contractor’s responsibility. The County shall have the right to request any additional investigative background information including, but limited to, the employment record, Right-To-Know records, E-Verify system records (if the Contractor uses this service as a means to determine employment eligibility, available through www.uscis.gov), training records, payroll records, position for which hired including site location of any personnel assigned to perform the services. The Contractor shall furnish, in writing, such information to the extent allowed by law, prior to commencement of services. The County reserves the right to conduct its own investigation of any employee of the Contractor.

2. Background Checks for the contractor’s staff must be approved by Orange County’s Security team prior to working in any County facility. Contractors are responsible for obtaining the necessary forms for background checks for work at Corrections. All contractors’ staff background checks will be sent to Pete.Shipancok@occc.net for approval. For security purposes and to maintain privacy when submitting FDLE Background Checks via e-mail the subject line of the email must contain the following ***EXEMPT***

a. The Corrections Facility will inform the contractor of their Background Check results.

b. Upon Background Check approval the contractor’s staff shall arrange an appointment with the Correction Facility staff to obtain a Orange County photo ID badge. An affidavit of Identity form (issued by the contractor) and a State of Florida ID or Driver’s License will be required.

3. Contractor’s employees will not be allowed in Orange County facilities without completed and approved background investigations.

1.9 OWNER OCCUPANCY

A. Full Owner Occupancy: The Owner, its tenants, and the public will occupy the site and existing building and adjacent facilities (outside the limits of the construction area) during the entire construction period. Cooperate with the Owner during construction operations to minimize conflicts, facilitate occupancy usage, and protect persons and property in the project area during the entire construction period. Perform the Work so as not to interfere with the Owner's operations.

Building D – Door Replacement SECTION 011100 Page 6 of 6

Strollo Architects 011100 - 6

Construction Documents 2021/5/18

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 SEQUENCE OF CONSTRUCTION

A. The construction schedule shall include all work as follows:

1. Construction will be the complete renovation of all of the sliding doors within one

(1) Building at a time as follows:

a. Building F

2. Individual areas within each building will be assigned to the contractor in a sequence determined by the owner.

3. Contractor shall meet with Owner and prepare a schedule based on the Owner’s requirements.

B. Since partial completion is not possible within a correctional facility, each area shall be complete, in all respects, before another area can be started.

END OF SECTION 011100

Orange County Corrections – Orange County, Florida ALTERNATES Building D – Door Replacement SECTION 012300 Page 1 of 2

Strollo Architects 012300 - 1

Construction Documents 2021/5/18

SECTION 012300 - ALTERNATES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for alternates.

1.3 DEFINITIONS

A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if the Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.

1. Alternates described in this Section are part of the Work only if enumerated in the Agreement.

2. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternates into the Work. No other adjustments are made to the Contract Sum.

1.4 PROCEDURES

A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.

1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.

B. Execute accepted alternates under the same conditions as other work of the Contract.

C. Schedule: A schedule of alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.

Orange County Corrections – Orange County, Florida ALTERNATES Building D – Door Replacement SECTION 012300 Page 2 of 2

Strollo Architects 012300 - 2

Construction Documents 2021/5/18

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 SCHEDULE OF ALTERNATES

A. Add Alternate No. 1: New Door Slabs

1. Alternate as indicated on Drawing F-1

B. Add Alternate No 2: Low Voltage (24 volt DC) Motor

1. Alternate as indicated on Drawing F-1.

END OF SECTION 012300

Orange County Corrections – Orange County, Florida PRODUCT SUBSTITUTIONS Building D – Door Replacement SECTION 012513 Page 1 of 5

Strollo Architects 012513 - 1

Construction Documents 2021/5/18

SECTION 012513 - PRODUCT SUBSTITUTIONS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section specifies administrative and procedural requirements for handling requests for substitutions made during bidding and after award of the Contract.

B. The Contractor’s Installation Schedule and the Schedule of Submittals are included under Section “Submittals”.

C. Standards: Refer to Section “Definitions and Standards” for applicability of industry standards to products specified.

D. Procedural requirements governing the Contractor's selection of products and product options are included under Section "Materials and Equipment."

1.3 DEFINITIONS

A. Definitions used in this Section are not intended to change or modify the meaning of other terms used in the Contract Documents.

B. Substitutions: The Contract will be awarded based on the design, methods, materials and/or equipment as addressed in the Contract Drawings and/or described in the Contract Specifications, without any consideration for substitution or "or-equal" replacement. Addressing, describing or naming an item is intended to establish the type, function, characteristics and quality required in order to establish a base for bidding.

1. The following are not considered substitutions:

a. Revisions to Contract Documents requested by the Owner or Designer(s).

b. Specified options of products and construction methods included in

Contract Documents.

c. The Contractor's determination of and compliance with governing regulations and orders issued by governing authorities.

2. Within thirty (30) days after Contract award, the Contractor may submit for approval substitutes for any equipment and/or material. In addition to the product documents, a written certification shall accompany the documentation indicating that the proposed substitute will have the same characteristics, will perform in accordance with the design requirements and that complies with all the requirements set for in the Contract. Any additional information required by the Owner or County Representative shall be provided by the Contractor. Rejection of any proposed substitute will be considered final and the Contractor shall not

Building D – Door Replacement SECTION 012513 Page 2 of 5

Strollo Architects 012513 - 2

Construction Documents 2021/5/18 get into any agreement with manufacturers or providers until the submittal has been finally approved.

3. The submission of this documentation shall follow the requirements set quality required in order to establish a base for bidding.

1.4 SUBMITTALS

A. Substitution Request Submittal: Requests for substitution will be considered if received within 14 calendar days before Bid date. Requests received after this time may be considered or rejected at the discretion of the Designer(s). Requests for substitutes after award of Contract will be considered if received within 20 days after issuance of the Notice to Proceed. Requests received more than 20 days after the Notice to Proceed may be considered or rejected at the sole discretion of the OAR.

1. Submit four (4) copies of each request for substitution for consideration. Submit requests in the form and in accordance with procedures required for Change Order proposals.

2. Identify the product, or the fabrication or installation method to be replaced in each request. Include related Specification Section and Drawing numbers.

Provide complete documentation showing compliance with the requirements for substitutions, and the following information, as appropriate:

a. Product Data, including Drawings and descriptions of products, fabrication and installation procedures.

b. Samples, where applicable or requested.

c. A detailed comparison of significant qualities of the proposed substitution with those of the Work specified. Significant qualities may include elements such as size, weight, durability, code compliance, maintenance requirements, energy usage, and environmental considerations, performance, key components and visual effect.

d. Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by the Owner and separate Contractors, that will become necessary to accommodate the proposed substitution.

e. A statement indicating the substitution's effect on the Contractor's Construction Schedule compared to the schedule without approval of the substitution. Indicate the effect of the proposed substitution on overall Contract Time.

f. Cost information, including a proposal of the net change, if any in the Contract Sum.

g. Certification by the Contractor that the substitution proposed is equal-to or better in every significant respect to that required by the Contract Documents, and that it will perform adequately in the application indicated.

Include the Contractor's waiver of rights to additional payment or time, that may subsequently become necessary because of the failure of the substitution to perform adequately.

h. A paragraph by paragraph comparison and analysis of the related specification section indicating compliance or variation from specification standard. Each variation shall be substantiated with necessary submission to validate products compliance with specifications.

Building D – Door Replacement SECTION 012513 Page 3 of 5

Strollo Architects 012513 - 3

Construction Documents 2021/5/18

i. Failure to include the above requirements in the submittal may be cause for rejection of the submittal in its entirety.

3. State the amount of credit, for cost and time, if any, the Owner will receive as the result of the substitution, if applicable.

4. Designer(s)’/ Designer(s) Action: Additional information or documentation necessary for evaluation of the request may be requested. Notification of approved substitutions will be made by Addendum prior to bid and by a Change Notice after bid.

PART 2 - PRODUCTS

2.1 SUBSTITUTIONS

A. Conditions: The substitution request will be received and considered by the Designer(s)’/ Designer(s) when one or more of the following conditions are satisfied, as determined by the Designer(s); otherwise requests will be returned without action except to record noncompliance with these requirements.

1. Extensive revisions to Contract Documents are not required.

2. Proposed changes are in keeping with the general intent of Contract Documents.

3. The request is timely, fully documented and properly submitted.

4. The request is directly related to an "or approved equal" clause or similar language in the Contract Documents.

5. The specified product or method of construction cannot be provided within the

Contract Time. The request will not be considered if the product or method cannot be provided as a result of failure to pursue the Work promptly or coordinate activities properly.

6. The specified product or method of construction cannot receive necessary approval by a governing authority, and the requested substitution can be approved.

7. A substantial advantage is offered the Owner, in terms of cost, time, energy conservation or other considerations of merit, after deducting offsetting responsibilities the Owner may be required to bear. Additional responsibilities for the Owner may include additional compensation to the OAR and Designer(s) for redesign and evaluation services, increased cost of other construction by the Owner or separate Contractors, and similar considerations.

8. The specified product or method of construction cannot be provided in a manner that is compatible with other materials, and where certification is provided that the substitution will overcome the incompatibility.

9. The specified product or method of construction cannot be coordinated with other materials, and where certification is provided that the proposed substitution can be coordinated.

10. The specified product or method of construction cannot provide a warranty required by the Contract Documents and where certification is provided that the proposed substitution provide the required warranty.

11. Where a proposed substitution involves more than one prime Contractor, each Contractor shall cooperate with the other Contractors involved to coordinate the

Building D – Door Replacement SECTION 012513 Page 4 of 5

Strollo Architects 012513 - 4

Construction Documents 2021/5/18

Work, provide uniformity and consistency, and to assure compatibility of products.

B. The submittal and Designer(s) acceptance of Shop Drawings, Product Data or Samples that relate to construction activities not complying with the Contract Documents does not constitute an acceptable or valid request for substitution, nor does it constitute approval.

C. If the use of a substitute product requires additional work or modifications to new or existing facilities, all such additional work, including utility modifications shall be borne by the Contractor.

D. Substitution request constitutes a representation that the Contractor:

1. Has investigated proposed product and determined that it meets or exceeds, in all respects, specified product.

2. Will provide the same warranty for substitution as for specified product.

3. Will coordinate installation and make other changes which may be required for work to be complete in all respects.

4. Waives claims for additional costs which may subsequently become apparent. All costs associated with the substitution will be paid by the Contractor regardless of approvals given, and regardless of subsequent difficulties experienced as a result of substitutions.

2.2 PROCEDURES

A. Product Selection Procedures: Options in product selection is governed by the Contract Documents and governing regulations, not by previous industry tradition or project experience. Procedures governing product selection include, but are not limited to the following:

1. Proprietary Specification Requirements: Where a single product or manufacturer is named, provide the product indicated. Other products may be considered by the Designer(s) in compliance with the provisions concerning substitutions.

a. Advise the Designer(s) before proceeding when it is discovered that the named product is not a feasible solution.

2. Semi-proprietary Specification Requirements: Where two or more products and manufacturers are named, provide one of the products indicated. No ORANGE COUNTY CORRECTIONS FACILITY PRODUCT SUBSTITUTIONS will be permitted unless the specification indicates consideration of other products.

a. When products are specified by one or more manufacturer's model numbers or performance criteria with reference to other acceptable manufacturers, products manufactured by acceptable manufacturers listed must meet minimum performance criteria specified or meet quality of models specified.

b. Advise the Designer(s) before proceeding when it is discovered that the named product is not a feasible solution.

3. Performance Specification Requirements: Where Specifications require compliance with performance requirements, provide products that comply with

Building D – Door Replacement SECTION 012513 Page 5 of 5

Strollo Architects 012513 - 5

Construction Documents 2021/5/18 the requirements and are recommended by the manufacturer for the application indicated. General overall performance of a product is implied where the product is specified for a specific application.

4. Compliance with Standards, Codes, and Regulations: Where the Specifications only require compliance with an imposed code, standard, or regulation, select a product that complies with the standards, codes or regulations specified.

PART 3 - EXECUTION

3.1 INSTALLATION OF PRODUCTS

A. Except as otherwise indicated in individual sections of these Specifications, comply with manufacturer's instructions and recommendations for installation of products in the applications indicated.

B. Clean exposed surfaces and protect as necessary to ensure work is protected from damage and deterioration at time of Substantial Completion of the whole Work.

END OF SECTION 012513

Orange County Corrections – Orange County, Florida MODIFICATION PROCEDURES Building D – Door Replacement SECTION 012600 Page 1 of 3

Strollo Architects 012600 - 1

Construction Documents 2021/5/18

SECTION 012600 - MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this section.

1.2 SUMMARY

A. This section specifies administrative and procedural requirements for handling and processing Contract modifications.

B. Related Sections: The following sections contain requirements that relate to this section:

1. Division 1 Section 013300 Submittals for requirements for the Contractor’s Construction Schedule

2. Division 1 Section 012900 Payment Procedures for administrative procedures governing applications for payment

3. Division 1 Section 012513 Product Substitutions for administrative procedures for handling requests for substitutions made after award of the Contract.

1.3 MINOR CHANGES IN THE WORK

A. Supplemental instructions authorizing minor changes in the work, not involving an adjustment to the Contract Sum or Contract Time, will be issued by the Project Manager.

1.4 CHANGE ORDER PROPOSAL REQUESTS

A. Owner-Initiated Proposal Requests: Proposed changes in the work that will require adjustment to the Contract Sum or Contract Time will be issued by the Project Manager, with a detailed description of the proposed change and supplemental or revised Drawings and Specifications, if necessary.

1. Proposal requests issued by the Project Manager are for information only. Do not consider them instruction either to stop work in progress, or to execute the proposed change.

2. Unless otherwise indicated in the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .