View the file

Other files

File Type Posted
STATEMENT_OF_WORK.pdf PDF
Questions_and_Answers.pdf PDF
Technical_Pricing_Matrix.xlsx XLSX spreadsheet
Instructions_to_Offerors_Evaluation_of_Offers.pdf PDF
SF30_DOL-OPS-15-R-00006_Amd_000004.pdf PDF
Sol_DOL-OPS-15-R-00006_Amd_000002.pdf PDF
Excel_for_pricing.xlsx XLSX spreadsheet
CMQA_SOW_17_Apr_2015.docx DOCX document
SDLCM-v2-4.doc DOC document
DOL-OPS-15-R-00006_Amendment_000001.pdf PDF
UPDATED-OIST_Responses-DOL-OPS-15-R-00006_Solicitation_Questions_from_vendors_9_Apr_2015.docx DOCX document
Past_Performance_Questionnaire.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

OPS

S4307 200 Constitution Ave, NW Office of Procurment Services US Department of Labor

ETA CODE 16. ADMINISTERED BYCODE

X

X

X

541512

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OROPS

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

04/13/2015 1400 ES

03/11/2015

202-693-4578STEPHEN ROANE JR.

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

DOL-OPS-15-R-00006

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 121 15-ETA-OIT-CNTR-0031OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

Washington DC 20210-0001

TELEPHONE NO.

17a. CONTRACTOR/

Washington DC 20210 S5206 200 Constitution Ave NW Department of Labor

15. DELIVER TO

Washington DC 20210-0001 S-4307 200 Constitution Ave, NW Office of Procurement Services

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$27.5

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

US Department of Labor

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

X

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

THE CONTRACTOR SHALL PROVIDE QUALITY ASSURANCE

(QA), QUALITY CONTROL-INDEPENDENT VERIFICATION,

VALIDATION & TESTING (QC-IVV&T), SOFTWARE CHANGE

MANAGEMENT (SCM) AND INFRASTRUCTURE CHANGE

MANAGEMENT (ICM) SERVICES.

Period of Performance: 05/19/2015 to 05/18/2020

0001 PROJECT MANAGER (PM) (BASE YEAR) 3760 LH

Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

X

XX

DATED

Jeanetta Roberson

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

0002 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 3760 LH

(BASE YEAR)

0003 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) (BASE 3760 LH

YEAR)

0004 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 3760 LH

(BASE YEAR)

0005 SCM CONFIGURATION MANAGER (SCM) (BASE YEAR) 3760 LH

0006 SCM CONFIGURATION ANALYST (SCA) (BASE YEAR) 3760 LH

0007 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 3760 LH

(BASE YEAR)

0008 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) (BASE 3760 LH

YEAR)

0009 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 3760 LH

(QCLT) (BASE YEAR)

Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

121 2 of

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

0010 QUALITY CONTROL APPLICATION ANALYST (TESTER) 3760 LH

(QCT) (BASE YEAR)

0011 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 3760 LH

(BASE YEAR)

0012 PROJECT MANAGER (PM) (BASE YEAR) 600 LH

0013 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 600 LH

(BASE YEAR)

0014 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) (BASE 600 LH

YEAR)

0015 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 600 LH

(BASE YEAR)

0016 SCM CONFIGURATION MANAGER (SCM) (BASE YEAR) 600 LH

0017 SCM CONFIGURATION ANALYST (SCA) (BASE YEAR) 600 LH

0018 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 600 LH

(BASE YEAR)

0019 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) (BASE 600 LH

YEAR)

0020 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 600 LH

(QCLT) (BASE YEAR)

0021 QUALITY CONTROL APPLICATION ANALYST (TESTER) 600 LH

(QCT) (BASE YEAR)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

4 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

0022 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 600 LH

(BASE YEAR)

0023 PROJECT MANAGER (PM) ON CALL ESTIMATE. (BASE YEAR) 480 LH

0024 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) ON 480 LH

CALL ESTIMATE. (BASE YEAR)

0025 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) ON 480 LH

CALL ESTIMATE. (BASE YEAR)

0026 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) ON 480 LH

CALL ESTIMATE. (BASE YEAR)

0027 SCM CONFIGURATION MANAGER (SCM) ON CALL ESTIMATE. 480 LH

(BASE YEAR)

0028 SCM CONFIGURATION ANALYST (SCA) ON CALL ESTIMATE. 480 LH

(BASE YEAR)

0029 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) ON 480 LH

CALL ESTIMATE. (BASE YEAR)

0030 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) ON CALL 480 LH

ESTIMATE. (BASE YEAR)

0031 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 480 LH

(QCLT) ON CALL ESTIMATE. (BASE YEAR)

0032 QUALITY CONTROL APPLICATION ANALYST (TESTER) 480 LH

(QCT) ON CALL ESTIMATE. (BASE YEAR)

0033 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 480 LH

(BASE YEAR)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

5 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

Period of performance for CLIN 00001-0033 is

5/19/2015 - 5/18/2016

1001 PROJECT MANAGER (PM) OPTION PERIOD ONE (1) - 3760 LH

LABOR ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1002 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 3760 LH

OPTION PERIOD ONE (1) - LABOR ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1003 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 3760 LH

OPTION PERIOD ONE (1) - LABOR ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1004 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 3760 LH

OPTION PERIOD ONE (1)- LABOR ESTIMATE.

(Option Line Item)

05/19/2016

Delivery: 05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1005 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD ONE 3760 LH

(1)- LABOR ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1006 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD ONE 3760 LH

(1)- LABOR ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

6 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

1007 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 3760 LH

OPTION PERIOD ONE (1)- LABOR ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1008 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 3760 LH

PERIOD ONE (1)- LABOR ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1009 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 3760 LH

(QCLT) OPTION PERIOD ONE (1)- LABOR ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1010 QUALITY CONTROL APPLICATION ANALYST (TESTER) 3760 LH

(QCT) OPTION PERIOD ONE (1) - LABOR ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1011 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 3760 LH

OPTION PERIOD ONE (1)- LABOR ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1012 PROJECT MANAGER (PM) OPTION PERIOD ONE (1)- 600 LH

OVERTIME ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1013 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 600 LH

OPTION PERIOD ONE (1) - OVERTIME ESTIMATE.

(Option Line Item)

05/19/2016

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

7 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

Delivery: 05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1014 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 600 LH

OPTION PERIOD ONE (1) - OVERTIME ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1015 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 600 LH

OPTION PERIOD ONE (1) - OVERTIME ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1016 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD ONE 600 LH

(1)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1017 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD ONE 600 LH

(1)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1018 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 600 LH

OPTION PERIOD ONE (1)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1019 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 600 LH

PERIOD ONE (1)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1020 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 600 LH

(QCLT) OPTION PERIOD ONE (1)- OVERTIME ESTIMATE.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

8 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1021 QUALITY CONTROL APPLICATION ANALYST (TESTER) 600 LH

(QCT) OPTION PERIOD ONE (1)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1022 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 600 LH

OPTION PERIOD ONE (1)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1023 PROJECT MANAGER (PM) OPTION PERIOD ONE (1)- ON 480 LH

CALL ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1024 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 480 LH

OPTION PERIOD ONE (1)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1025 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 480 LH

OPTION PERIOD ONE (1)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1026 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 480 LH

OPTION PERIOD ONE (1)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

9 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

1027 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD ONE 480 LH

(1)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1028 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD ONE 480 LH

(1)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1029 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 480 LH

OPTION PERIOD ONE (1)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1030 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 480 LH

PERIOD ONE (1)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1031 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 480 LH

(QCLT) OPTION PERIOD ONE (1)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2016

Delivery: 05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1032 QUALITY CONTROL APPLICATION ANALYST (TESTER) 480 LH

(QCT) OPTION PERIOD ONE (1)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

1033 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 480 LH

OPTION PERIOD ONE (1)- ON CALL ESTIMATE.

(Option Line Item)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

10 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

05/19/2016

Period of Performance: 05/19/2016 to 05/18/2017

Period of performance for CLIN 1001-1003 is

5/19/2016 - 5/18/2017

2001 PROJECT MANAGER (PM) OPTION PERIOD TWO (2) - 3760 LH

LABOR ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2002 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 3760 LH

OPTION PERIOD TWO (2) - LABOR ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2003 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 3760 LH

OPTION PERIOD TWO (2) - LABOR ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2004 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 3760 LH

OPTION PERIOD TWO (2) - LABOR ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2005 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD TWO 3760 LH

(2) - LABOR ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2006 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD TWO 3760 LH

(2) - LABOR ESTIMATE.

(Option Line Item)

05/19/2017

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

11 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

Period of Performance: 05/19/2017 to 05/18/2018

2007 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 3760 LH

OPTION PERIOD TWO (2) - LABOR ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2008 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 3760 LH

PERIOD TWO (2) - LABOR ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2009 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 3760 LH

(QCLT) OPTION PERIOD TWO (2) - LABOR ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2010 QUALITY CONTROL APPLICATION ANALYST (TESTER) 3760 LH

(QCT) OPTION PERIOD TWO (2) - LABOR ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2011 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 3760 LH

OPTION PERIOD ONE (1) - LABOR ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2012 PROJECT MANAGER (PM) OPTION PERIOD TWO (2)- 600 LH

OVERTIME ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2013 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 600 LH

OPTION PERIOD TWO (2)- OVERTIME ESTIMATE.

(Option Line Item)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

12 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2014 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 600 LH

OPTION PERIOD TWO (2)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2015 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 600 LH

OPTION PERIOD TWO (2)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2016 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD TWO 600 LH

(2)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2017 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD TWO 600 LH

(2)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2018 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 600 LH

OPTION PERIOD TWO (2)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2019 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 600 LH

PERIOD TWO (2)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2020 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 600 LH

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

13 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

(QCLT) OPTION PERIOD TWO (2)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2021 QUALITY CONTROL APPLICATION ANALYST (TESTER) 600 LH

(QCT) OPTION PERIOD TWO (2)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2022 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 600 LH

OPTION PERIOD TWO (2)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2023 PROJECT MANAGER (PM) OPTION PERIOD TWO (2)- ON 480 LH

CALL ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2024 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 480 LH

OPTION PERIOD TWO (2)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2025 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 480 LH

OPTION PERIOD ONE (1)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2026 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 480 LH

OPTION PERIOD TWO (2)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

14 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

2027 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD TWO 480 LH

(2)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2028 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD TWO 480 LH

(2)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2029 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 480 LH

OPTION PERIOD TWO (2)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2030 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 480 LH

PERIOD TWO (2)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2031 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 480 LH

(QCLT) OPTION PERIOD TWO (2)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2032 QUALITY CONTROL APPLICATION ANALYST (TESTER) 480 LH

(QCT) OPTION PERIOD TWO (2)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

2033 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 480 LH

OPTION PERIOD TWO (2)- ON CALL ESTIMATE.

(Option Line Item)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

15 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

05/19/2017

Period of Performance: 05/19/2017 to 05/18/2018

3001 PROJECT MANAGER (PM) OPTION PERIOD THREE (3) - 3760 LH

LABOR ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3002 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 3760 LH

OPTION PERIOD THREE (3) - LABOR ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3003 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 3760 LH

OPTION PERIOD THREE (3) - LABOR ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3004 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 3760 LH

OPTION PERIOD THREE (3) - LABOR ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3005 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD 3760 LH

THREE (3) - LABOR ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3006 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD 3760 LH

THREE (3) - LABOR ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3007 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 3760 LH

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

16 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

OPTION PERIOD THREE (3) - LABOR ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3008 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 3760 LH

PERIOD THREE (3) - LABOR ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3009 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 3760 LH

(QCLT) OPTION PERIOD THREE (3) - LABOR ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3010 QUALITY CONTROL APPLICATION ANALYST (TESTER) 3760 LH

(QCT) OPTION PERIOD THREE (3) - LABOR ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3011 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 3760 LH

OPTION PERIOD THREE (3) - LABOR ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3012 PROJECT MANAGER (PM) OPTION PERIOD THREE (3)- 600 LH

OVERTIME ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3013 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 600 LH

OPTION PERIOD THREE (3)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

17 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

3014 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 600 LH

OPTION PERIOD THREE (3)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3015 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 600 LH

OPTION PERIOD THREE (3)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3016 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD 600 LH

THREE (3)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3017 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD 600 LH

THREE (3)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3018 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 600 LH

OPTION PERIOD THREE (3)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3019 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 600 LH

PERIOD THREE (3)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3020 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 600 LH

(QCLT) OPTION PERIOD THREE (3)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2018

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

18 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

Period of Performance: 05/19/2018 to 05/18/2019

3021 QUALITY CONTROL APPLICATION ANALYST (TESTER) 600 LH

(QCT) OPTION PERIOD THREE (3)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3022 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 600 LH

OPTION PERIOD THREE (3)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3023 PROJECT MANAGER (PM) OPTION PERIOD THREE (3)- ON 480 LH

CALL ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3024 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 480 LH

OPTION PERIOD THREE (3)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3025 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 480 LH

OPTION PERIOD THREE (3)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3026 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 480 LH

OPTION PERIOD THREE (3)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3027 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD 480 LH

THREE (3)- ON CALL ESTIMATE.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

19 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3028 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD 480 LH

THREE (3)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3029 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 480 LH

OPTION PERIOD THREE (3)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3030 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 480 LH

PERIOD THREE (3)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3031 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 480 LH

(QCLT) OPTION PERIOD THREE (3)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3032 QUALITY CONTROL APPLICATION ANALYST (TESTER) 480 LH

(QCT) OPTION PERIOD THREE (3)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

3033 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 480 LH

OPTION PERIOD THREE (3)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2018

Period of Performance: 05/19/2018 to 05/18/2019

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

20 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

4001 PROJECT MANAGER (PM) OPTION PERIOD FOUR (4) - 3760 LH

LABOR ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4002 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 3760 LH

OPTION PERIOD FOUR (4) - LABOR ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4003 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 3760 LH

OPTION PERIOD FOUR (4) - LABOR ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4004 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 3760 LH

OPTION PERIOD FOUR (4) - LABOR ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4005 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD 3760 LH

FOUR (4) - LABOR ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4006 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD 3760 LH

FOUR (4) - LABOR ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4007 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 3760 LH

OPTION PERIOD FOUR (4) - LABOR ESTIMATE.

(Option Line Item)

05/19/2019

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

21 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

Period of Performance: 05/19/2019 to 05/18/2020

4008 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 3760 LH

PERIOD FOUR (4) - LABOR ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4009 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 3760 LH

(QCLT) OPTION PERIOD FOUR (4) - LABOR ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4010 QUALITY CONTROL APPLICATION ANALYST (TESTER) 3760 LH

(QCT) OPTION PERIOD FOUR (4) - LABOR ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4011 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 3760 LH

OPTION PERIOD FOUR (4) - LABOR ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4012 PROJECT MANAGER (PM) OPTION PERIOD FOUR (4)- 600 LH

OVERTIME ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4013 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 600 LH

OPTION PERIOD FOUR (4)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4014 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 600 LH

OPTION PERIOD FOUR (4)- OVERTIME ESTIMATE.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

22 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4015 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 600 LH

OPTION PERIOD FOUR (4)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4016 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD 600 LH

FOUR (4)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4017 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD 600 LH

FOUR (4)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4018 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 600 LH

OPTION PERIOD FOUR (4)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4019 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 600 LH

PERIOD FOUR (4)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4020 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 600 LH

(QCLT) OPTION PERIOD FOUR (4)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

23 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

4021 QUALITY CONTROL APPLICATION ANALYST (TESTER) 600 LH

(QCT) OPTION PERIOD FOUR (4)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4022 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 600 LH

OPTION PERIOD FOUR (4)- OVERTIME ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4023 PROJECT MANAGER (PM) OPTION PERIOD FOUR (4)- ON 480 LH

CALL ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4024 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 480 LH

OPTION PERIOD FOUR (4)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4025 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 480 LH

OPTION PERIOD FOUR (4)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4026 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 480 LH

OPTION PERIOD FOUR (4)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4027 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD 480 LH

FOUR (4)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2019

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

24 121

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DOL-OPS-15-R-00006

Period of Performance: 05/19/2019 to 05/18/2020

4028 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD 480 LH

FOUR (4)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4029 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 480 LH

OPTION PERIOD FOUR (4)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4030 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 480 LH

PERIOD FOUR (4)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4031 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 480 LH

(QCLT) OPTION PERIOD FOUR (4)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4032 QUALITY CONTROL APPLICATION ANALYST (TESTER) 480 LH

(QCT) OPTION PERIOD FOUR (4)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

4033 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 480 LH

OPTION PERIOD FOUR (4)- ON CALL ESTIMATE.

(Option Line Item)

05/19/2019

Period of Performance: 05/19/2019 to 05/18/2020

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

DOL-OPS-15-R-00006

B – SUPPLIES OR SERVICES/PRICE

B.1. GENERAL

The contractor shall furnish Quality Assurance (QA), Quality Control- Independent Verification, Validation, & Testing (QC-IVV&T), software Change Management (sCM) and infrastructure Change Management (iCM) services for the U.S. Department of Labor, Employment and Training Administration (ETA), Office of Information Systems and Technology (OIST) in accordance with the terms and conditions as set forth in the Solicitation document (including all amendments), and resulting contract.

B.2. CONTRACT TYPE

The Government anticipates awarding a labor hours (LH), indefinite delivery, indefinite quantity (IDIQ) type contract for a one year base period and four one year option periods. All options will be exercised at the unilateral discretion of the Government.

B.3. PERIOD OF PERFORMANCE

This contract shall be in effect for a Base Period of one (1) year from date of contract award. The anticipated performance periods are as follows:

Base Period: 5/19/2015 – 5/18/2016 Option Period 1: 5/19/2016 – 5/18/2017 Option Period 2: 5/19/2017 – 5/18/2018 Option Period 3: 5/19/2018 – 5/18/2019 Option Period 4: 5/19/2019 – 5/18/2020

B.4. MINIMUM GURANTEED

The Government’s only obligation is the Guaranteed Minimum Amount of Service for the Base Period under the contract. The minimum amount is $2,000.00 for the contract. The five year ceiling amount is $43,111,482.19. Ceiling labor hours is 18,800 labor hours. Ceiling overtime hours is 3000 labor hours. Ceiling on-call hours is 2400 labor hours.

B.5. DELIVERY SCHEDULE

Employee & Training Administration, U.S. Department of Labor, 200 Constitution Avenue, NW, Washington, DC 20210. Attn: COR Florence Davidson.

B.6. INCREMENTAL FUNDING

Funds are not presently available for performance under this contract beyond the base period. The Government's obligation for performance of this contract beyond that date is contingent upon the availability of funds from which payment for contract purposes can be made through the benefits fund. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond the existing period of performance, until funds are made available to the Contracting Officer for performance and until the contractor receives notice of availability which must be confirmed in writing by the Contracting Officer.

B.8. ESTIMATED QUANTITIES

CLIN Base Year Estimated Labor Category Est Hrs

0001 Project Manager (PM)

0002 infrastructure Configuration Management(iCM)

0003 infrastructure Configuration Analysis (iCA)

0004 infrastructure Application Engineering (iAE)

0005 sCM Configuration Manager (sCM)

0006 sCM Configuration Analyst (sCA)

0007 sCM Applications Systems Administrator (sASA)

0008 Quality Assurance Management Analyst (QA)

Quality Control Application Analyst Lead (Tester) (QCLT)

Quality Control Application Analyst (Tester)

(QCT)

0011 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

41360

CLIN Base Year Estimated Labor Category Overtime Est Hrs

0012 Project Manager (PM)

0013 infrastructure Configuration Management(iCM)

0014 infrastructure Configuration Analysis (iCA)

0015 infrastructure Application Engineering (iAE)

0016 sCM Configuration Manager (sCM)

0017 sCM Configuration Analyst (sCA)

0018 sCM Applications Systems Administrator (sASA)

0019 Quality Assurance Management Analyst (QA)

0022 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

CLIN Base Year Estimted Labor Category On Call Est Hrs

0023 Project Manager (PM)

0024 infrastructure Configuration Management(iCM)

0025 infrastructure Configuration Analysis (iCA)

0026 infrastructure Application Engineering (iAE)

0027 sCM Configuration Manager (sCM)

0028 sCM Configuration Analyst (sCA)

0029 sCM Applications Systems Administrator (sASA)

0030 Quality Assurance Management Analyst (QA)

0033 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

CLIN Option Period One (1) Estimated Labor Category Est Hrs

1001 Project Manager (PM)

1002 infrastructure Configuration Management(iCM)

1003 infrastructure Configuration Analysis (iCA)

1004 infrastructure Application Engineering (iAE)

1005 sCM Configuration Manager (sCM)

1006 sCM Configuration Analyst (sCA)

1007 sCM Applications Systems Administrator (sASA)

1008 Quality Assurance Management Analyst (QA)

1011 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

41360

CLIN Option Period One (1) Estimated Labor Category Overtime

Est Hrs

1012 Project Manager (PM)

1013 infrastructure Configuration Management(iCM)

1014 infrastructure Configuration Analysis (iCA)

1015 infrastructure Application Engineering (iAE)

1016 sCM Configuration Manager (sCM)

1017 sCM Configuration Analyst (sCA)

1018 sCM Applications Systems Administrator (sASA)

1019 Quality Assurance Management Analyst (QA)

1022 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

CLIN Option Period One (1) Estimted Labor Category On Call

Est Hrs

1023 Project Manager (PM)

1024 infrastructure Configuration Management(iCM)

1025 infrastructure Configuration Analysis (iCA)

1026 infrastructure Application Engineering (iAE)

1027 sCM Configuration Manager (sCM)

1028 sCM Configuration Analyst (sCA)

1029 sCM Applications Systems Administrator (sASA)

1030 Quality Assurance Management Analyst (QA)

1033 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

CLIN Option Period Two (2) Estimated Labor Category

Est Hrs

2001 Project Manager (PM)

2002 infrastructure Configuration Management(iCM)

2003 infrastructure Configuration Analysis (iCA)

2004 infrastructure Application Engineering (iAE)

2005 sCM Configuration Manager (sCM)

2006 sCM Configuration Analyst (sCA)

2007 sCM Applications Systems Administrator (sASA)

2008 Quality Assurance Management Analyst (QA)

2011 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

41360

CLIN Option Period Two (2) Estimated Labor Category Overtime

Est Hrs

2012 Project Manager (PM)

2013 infrastructure Configuration Management(iCM)

2014 infrastructure Configuration Analysis (iCA)

2015 infrastructure Application Engineering (iAE)

2016 sCM Configuration Manager (sCM)

2017 sCM Configuration Analyst (sCA)

2018 sCM Applications Systems Administrator (sASA)

2019 Quality Assurance Management Analyst (QA)

2022 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

CLIN Option Period Two (2) Estimted Labor Category On Call

Est Hrs

2023 Project Manager (PM)

2024 infrastructure Configuration Management(iCM)

2025 infrastructure Configuration Analysis (iCA)

2026 infrastructure Application Engineering (iAE)

2027 sCM Configuration Manager (sCM)

2028 sCM Configuration Analyst (sCA)

2029 sCM Applications Systems Administrator (sASA)

2030 Quality Assurance Management Analyst (QA)

2033 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

CLIN Option Period Three (3) Base Year Estimated Labor Category

Est Hrs

3001 Project Manager (PM)

3002 infrastructure Configuration Management(iCM)

3003 infrastructure Configuration Analysis (iCA)

3004 infrastructure Application Engineering (iAE)

3005 sCM Configuration Manager (sCM)

3006 sCM Configuration Analyst (sCA)

3007 sCM Applications Systems Administrator (sASA)

3008 Quality Assurance Management Analyst (QA)

3011 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

41360

CLIN Option Period Three (3) Estimated Labor Category Overtime

Est Hrs

3012 Project Manager (PM)

3013 infrastructure Configuration Management(iCM)

3014 infrastructure Configuration Analysis (iCA)

3015 infrastructure Application Engineering (iAE)

3016 sCM Configuration Manager (sCM)

3017 sCM Configuration Analyst (sCA)

3018 sCM Applications Systems Administrator (sASA) 600

3019 Quality Assurance Management Analyst (QA) 600

3022 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

CLIN Option Period Three (3) Estimted Labor Category On Call

Est Hrs

3023 Project Manager (PM)

3024 infrastructure Configuration Management(iCM)

3025 infrastructure Configuration Analysis (iCA)

3026 infrastructure Application Engineering (iAE)

3027 sCM Configuration Manager (sCM)

3028 sCM Configuration Analyst (sCA)

3029 sCM Applications Systems Administrator (sASA)

3030 Quality Assurance Management Analyst (QA)

3033 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

CLIN Option Period Four (4) Estimated Labor Category

Est Hrs

4001 Project Manager (PM)

4002 infrastructure Configuration Management(iCM)

4003 infrastructure Configuration Analysis (iCA)

4004 infrastructure Application Engineering (iAE)

4005 sCM Configuration Manager (sCM)

4006 sCM Configuration Analyst (sCA)

4007 sCM Applications Systems Administrator (sASA)

4008 Quality Assurance Management Analyst (QA)

4011 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

41360

CLIN Option Period Four (4) Estimated Labor Category Overtime

Est Hrs

4012 Project Manager (PM)

4013 infrastructure Configuration Management(iCM)

4014 infrastructure Configuration Analysis (iCA)

4015 infrastructure Application Engineering (iAE)

4016 sCM Configuration Manager (sCM)

4017 sCM Configuration Analyst (sCA)

4018 sCM Applications Systems Administrator (sASA)

4019 Quality Assurance Management Analyst (QA)

4022 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

CLIN Option Period Four (4) Estimted Labor Category On Call

Est Hrs

4023 Project Manager (PM)

4024 infrastructure Configuration Management(iCM)

4025 infrastructure Configuration Analysis (iCA)

4026 infrastructure Application Engineering (iAE)

4027 sCM Configuration Manager (sCM)

4028 sCM Configuration Analyst (sCA)

4029 sCM Applications Systems Administrator (sASA)

4030 Quality Assurance Management Analyst (QA)

4033 Quality Control Load Test Specialist (QCLTS)

TOTAL ESTIMATED HOURS

C – STATEMENT OF WORK

CHANGE MANAGEMENT/QUALITY ASSURANCE/QUALITY CONTROL

PWS STATEMENT OF WORK

OBJECTIVES

The purpose of this solicitation is to award a contract for Quality Assurance (QA), Quality Control-Independent Verification, Validation, & Testing (QC-IVV&T), software Change Management (sCM) and infrastructure Change Management (iCM) services. In response to this solicitation, vendors are requested to submit their proposed plan regarding how they will execute the services/tasks as described within this SOW. This includes services/tasks such as but limited to, (not listed in any particular order):

The vendor shall be a certified Capability Maturity Model Integration Maturity Level -2, (for Services preferred) company, providing Capability Maturity Model Integration - Level 2, (for Development) services to:

DOL/OCIO, infrastructure Configuration Management (iCM):

o Project Management o Infrastructure Configuration Management(iCM) o Infrastructure Configuration Analysis (iCA) o Infrastructure Application Engineering (iCAE)

ETA/OIST

o Project Management o Software Configuration Management (sCM) o Software Configuration Analysis (sCA) o Software Application Engineering (sAE) o Software Applications Systems Administration o Quality Assurance (QA) o Quality Control-Independent Verification, Validation & Testing

(QC-IVV&T)

Pursuant to the execution of these services, the vendor is expected to have:

Knowledgeable and experienced in industry accepted Change Management, Quality Assurance and Quality Control-IVV&T principles, network and data center operations and architectures, current techniques and tools for monitoring enterprise IT environments, analytics, industry and Government best practices and Government IT security regulations and policies.

Demonstrated experience with applying industry and government best practices to all service activities identified above.

Demonstrated experience and knowledge with applications development and governance processes (e.g. Organizational Configuration

Management Board (OCMB), Change Control Board (CCB) and Release Management (RM))

Demonstrated experience and knowledge with the practical application of Software Development Life-Cycle Management principles

Demonstrated experience and design, implementation, maintenance and management of a configuration Management Database (CMDB).

Demonstrated experienced in QA, QC-IVV&T, sCM as they applied to software development operations throughout the product’s life-cycle.

This includes but is not limited to, continuous monitoring of policy and process compliance, governance, current application testing techniques, defects (bug) reporting and change control activities;

maintaining the integrity of the application and documentation repository; developing and maintaining configuration management plans; monitoring system configurations e.g. assessing and testing the level of compliance with established baseline configurations;

static and dynamic functional and regression applications testing &verification; static and dynamic application security testing; 508 compliance testing; mobile application testing, web portal testing, defects (bugs) reporting techniques; monitoring updates to baseline configurations; and configuration status of the enterprise IT environment.

Demonstrated experienced in providing overarching Continuous Quality Improvement program that is inclusive of processes, policies, governance and operations. It is incumbent upon the vendor to ensure the integrity and quality of applications and subsidiary products developed to support the execution of ETA/OIST’s mission. The vendor must be certified at a CMMI – Level 2 (for Services preferred).

DOL/OCIO’s Infrastructure Change Management

DOL/OCIO’s iCM is a closely focused and distinct specialty that places rigorous adherence to well-engineered processes, rigid quality assurance standards and quality control measurements, continuous and real-time enterprise IT infrastructure monitoring inclusive of all environments, rapid and precise management controls for responding to risks and unauthorized changes.

Infrastructure Change Management

ICM activities include all activities associated with monitoring and documenting DOL’s enterprise IT environments (Production Network/Data Center environment, QA/QC Testing environment, QA/QC UAT Testing environment and Developmental environments)

ICM shall document and annually update all DOL OCIO policies and procedures associated with Infrastructure Change Management

ICM shall identify and verify enterprise IT assets and configurations within the DOL enterprise IT environments.

ICM shall identify Configuration Items (CI) to include collecting, recording and maintaining accurate information about CIs.

ICM shall create, managing and maintain DOL’s CMDB.

ICM shall document all authorized and approved configuration changes to DOL’s IT enterprise infrastructure.

ICM shall develop, document, and maintain baseline configurations, configuration management plans, as well as system component inventories.

ICM shall monitor, manage and control all authorized changes, according to DOL OCIO policies and guidance, to the enterprise IT infrastructure.

ICM shall document and report all authorized changes made to DOL’s enterprise IT infrastructure to include but not limited to:

o Hardware o Software (GSS, COTS, Govt. developed application) o Firmware o Other

ICM shall report all unauthorized changes to the Enterprise IT infrastructure according to DOL Policies and guidelines.

ICM Develop and implement procedures to routinely monitor and manage hardware, software, and firmware configurations.

ICM shall routinely monitor changes to the configuration settings in accordance with DOL policies and procedures.

ICM shall develop, document and maintain baseline configurations of the Enterprise IT Infrastructure and shall provide this report at the beginning of each month to OCIO Federal Manager, and provide adhoc reports as requested.

ICM shall perform system administrative functions, e.g. major/minor software release version upgrades, service pack installations, software patch releases for OCIO’s CM operations:

OCIO Application Suite o Remedy ver. 7.x o Remedy ver. 8.x

ICM shall provide custom development applications and tools capabilities using current OCIO CM Software Suite to maximize efficiencies and/or to exploit the applications capabilities and deploy value-add tools that improve or enhances OCIO’s business operations.

ICM shall perform a variety of system engineering tasks and activities relative to current OCIO CM Software Suite.

ICM shall develop and maintain automated workflows that comply with CMMI II standards using software products owned by DOL:

Application Suite o Remedy ver. 7.x o Remedy ver. 8.x

ETA/OIST’s Change Management

In the broadest of terms, provides the framework from which processes are designed that governs the logical flow of any change type from initiation/creation, through technical review and vetting, to approval, implementation, monitoring, and reporting. Often, Change Management is thought of within the context of an organization’s IT infrastructure, hardware, firmware, Operating Systems and applications. CM is accountable to oversee a collection of processes that collectively bring about an assurance that a Change Request is meticulously vetted, and if approved, becomes a sanctioned change that is acted upon in a definitive manner, ensuring activities and resources are coordinated, stringent management controls are in place and monitoring validates only the authorized change, as approved, is implemented. Risk is well defined and risk response plans are in place to effectively mitigate the impact of any known risk should they occur.