DOL-OPS-15-R-00006.pdf
PDF 589 KB Posted
- Solicitation number
- DOL-OPS-15-R-00006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| STATEMENT_OF_WORK.pdf | ||
| Questions_and_Answers.pdf | ||
| Technical_Pricing_Matrix.xlsx | XLSX spreadsheet | |
| Instructions_to_Offerors_Evaluation_of_Offers.pdf | ||
| SF30_DOL-OPS-15-R-00006_Amd_000004.pdf | ||
| Sol_DOL-OPS-15-R-00006_Amd_000002.pdf | ||
| Excel_for_pricing.xlsx | XLSX spreadsheet | |
| CMQA_SOW_17_Apr_2015.docx | DOCX document | |
| SDLCM-v2-4.doc | DOC document | |
| DOL-OPS-15-R-00006_Amendment_000001.pdf | ||
| UPDATED-OIST_Responses-DOL-OPS-15-R-00006_Solicitation_Questions_from_vendors_9_Apr_2015.docx | DOCX document | |
| Past_Performance_Questionnaire.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
OPS
S4307 200 Constitution Ave, NW Office of Procurment Services US Department of Labor
ETA CODE 16. ADMINISTERED BYCODE
X
X
X
541512
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED OROPS
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
04/13/2015 1400 ES
03/11/2015
202-693-4578STEPHEN ROANE JR.
(No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
DOL-OPS-15-R-00006
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 121 15-ETA-OIT-CNTR-0031OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
Washington DC 20210-0001
TELEPHONE NO.
17a. CONTRACTOR/
Washington DC 20210 S5206 200 Constitution Ave NW Department of Labor
15. DELIVER TO
Washington DC 20210-0001 S-4307 200 Constitution Ave, NW Office of Procurement Services
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$27.5
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULE
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
US Department of Labor
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
X
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
THE CONTRACTOR SHALL PROVIDE QUALITY ASSURANCE
(QA), QUALITY CONTROL-INDEPENDENT VERIFICATION,
VALIDATION & TESTING (QC-IVV&T), SOFTWARE CHANGE
MANAGEMENT (SCM) AND INFRASTRUCTURE CHANGE
MANAGEMENT (ICM) SERVICES.
Period of Performance: 05/19/2015 to 05/18/2020
0001 PROJECT MANAGER (PM) (BASE YEAR) 3760 LH
Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
X
XX
DATED
Jeanetta Roberson
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
0002 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 3760 LH
(BASE YEAR)
0003 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) (BASE 3760 LH
YEAR)
0004 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 3760 LH
(BASE YEAR)
0005 SCM CONFIGURATION MANAGER (SCM) (BASE YEAR) 3760 LH
0006 SCM CONFIGURATION ANALYST (SCA) (BASE YEAR) 3760 LH
0007 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 3760 LH
(BASE YEAR)
0008 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) (BASE 3760 LH
YEAR)
0009 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 3760 LH
(QCLT) (BASE YEAR)
Continued ...
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
121 2 of
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
0010 QUALITY CONTROL APPLICATION ANALYST (TESTER) 3760 LH
(QCT) (BASE YEAR)
0011 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 3760 LH
(BASE YEAR)
0012 PROJECT MANAGER (PM) (BASE YEAR) 600 LH
0013 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 600 LH
(BASE YEAR)
0014 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) (BASE 600 LH
YEAR)
0015 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 600 LH
(BASE YEAR)
0016 SCM CONFIGURATION MANAGER (SCM) (BASE YEAR) 600 LH
0017 SCM CONFIGURATION ANALYST (SCA) (BASE YEAR) 600 LH
0018 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 600 LH
(BASE YEAR)
0019 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) (BASE 600 LH
YEAR)
0020 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 600 LH
(QCLT) (BASE YEAR)
0021 QUALITY CONTROL APPLICATION ANALYST (TESTER) 600 LH
(QCT) (BASE YEAR)
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
4 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
0022 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 600 LH
(BASE YEAR)
0023 PROJECT MANAGER (PM) ON CALL ESTIMATE. (BASE YEAR) 480 LH
0024 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) ON 480 LH
CALL ESTIMATE. (BASE YEAR)
0025 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) ON 480 LH
CALL ESTIMATE. (BASE YEAR)
0026 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) ON 480 LH
CALL ESTIMATE. (BASE YEAR)
0027 SCM CONFIGURATION MANAGER (SCM) ON CALL ESTIMATE. 480 LH
(BASE YEAR)
0028 SCM CONFIGURATION ANALYST (SCA) ON CALL ESTIMATE. 480 LH
(BASE YEAR)
0029 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) ON 480 LH
CALL ESTIMATE. (BASE YEAR)
0030 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) ON CALL 480 LH
ESTIMATE. (BASE YEAR)
0031 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 480 LH
(QCLT) ON CALL ESTIMATE. (BASE YEAR)
0032 QUALITY CONTROL APPLICATION ANALYST (TESTER) 480 LH
(QCT) ON CALL ESTIMATE. (BASE YEAR)
0033 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 480 LH
(BASE YEAR)
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
5 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
Period of performance for CLIN 00001-0033 is
5/19/2015 - 5/18/2016
1001 PROJECT MANAGER (PM) OPTION PERIOD ONE (1) - 3760 LH
LABOR ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1002 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 3760 LH
OPTION PERIOD ONE (1) - LABOR ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1003 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 3760 LH
OPTION PERIOD ONE (1) - LABOR ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1004 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 3760 LH
OPTION PERIOD ONE (1)- LABOR ESTIMATE.
(Option Line Item)
05/19/2016
Delivery: 05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1005 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD ONE 3760 LH
(1)- LABOR ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1006 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD ONE 3760 LH
(1)- LABOR ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
6 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
1007 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 3760 LH
OPTION PERIOD ONE (1)- LABOR ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1008 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 3760 LH
PERIOD ONE (1)- LABOR ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1009 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 3760 LH
(QCLT) OPTION PERIOD ONE (1)- LABOR ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1010 QUALITY CONTROL APPLICATION ANALYST (TESTER) 3760 LH
(QCT) OPTION PERIOD ONE (1) - LABOR ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1011 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 3760 LH
OPTION PERIOD ONE (1)- LABOR ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1012 PROJECT MANAGER (PM) OPTION PERIOD ONE (1)- 600 LH
OVERTIME ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1013 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 600 LH
OPTION PERIOD ONE (1) - OVERTIME ESTIMATE.
(Option Line Item)
05/19/2016
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
7 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
Delivery: 05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1014 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 600 LH
OPTION PERIOD ONE (1) - OVERTIME ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1015 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 600 LH
OPTION PERIOD ONE (1) - OVERTIME ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1016 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD ONE 600 LH
(1)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1017 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD ONE 600 LH
(1)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1018 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 600 LH
OPTION PERIOD ONE (1)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1019 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 600 LH
PERIOD ONE (1)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1020 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 600 LH
(QCLT) OPTION PERIOD ONE (1)- OVERTIME ESTIMATE.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
8 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1021 QUALITY CONTROL APPLICATION ANALYST (TESTER) 600 LH
(QCT) OPTION PERIOD ONE (1)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1022 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 600 LH
OPTION PERIOD ONE (1)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1023 PROJECT MANAGER (PM) OPTION PERIOD ONE (1)- ON 480 LH
CALL ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1024 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 480 LH
OPTION PERIOD ONE (1)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1025 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 480 LH
OPTION PERIOD ONE (1)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1026 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 480 LH
OPTION PERIOD ONE (1)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
9 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
1027 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD ONE 480 LH
(1)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1028 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD ONE 480 LH
(1)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1029 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 480 LH
OPTION PERIOD ONE (1)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1030 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 480 LH
PERIOD ONE (1)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1031 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 480 LH
(QCLT) OPTION PERIOD ONE (1)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2016
Delivery: 05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1032 QUALITY CONTROL APPLICATION ANALYST (TESTER) 480 LH
(QCT) OPTION PERIOD ONE (1)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
1033 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 480 LH
OPTION PERIOD ONE (1)- ON CALL ESTIMATE.
(Option Line Item)
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
10 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
05/19/2016
Period of Performance: 05/19/2016 to 05/18/2017
Period of performance for CLIN 1001-1003 is
5/19/2016 - 5/18/2017
2001 PROJECT MANAGER (PM) OPTION PERIOD TWO (2) - 3760 LH
LABOR ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2002 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 3760 LH
OPTION PERIOD TWO (2) - LABOR ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2003 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 3760 LH
OPTION PERIOD TWO (2) - LABOR ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2004 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 3760 LH
OPTION PERIOD TWO (2) - LABOR ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2005 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD TWO 3760 LH
(2) - LABOR ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2006 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD TWO 3760 LH
(2) - LABOR ESTIMATE.
(Option Line Item)
05/19/2017
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
11 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
Period of Performance: 05/19/2017 to 05/18/2018
2007 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 3760 LH
OPTION PERIOD TWO (2) - LABOR ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2008 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 3760 LH
PERIOD TWO (2) - LABOR ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2009 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 3760 LH
(QCLT) OPTION PERIOD TWO (2) - LABOR ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2010 QUALITY CONTROL APPLICATION ANALYST (TESTER) 3760 LH
(QCT) OPTION PERIOD TWO (2) - LABOR ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2011 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 3760 LH
OPTION PERIOD ONE (1) - LABOR ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2012 PROJECT MANAGER (PM) OPTION PERIOD TWO (2)- 600 LH
OVERTIME ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2013 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 600 LH
OPTION PERIOD TWO (2)- OVERTIME ESTIMATE.
(Option Line Item)
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
12 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2014 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 600 LH
OPTION PERIOD TWO (2)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2015 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 600 LH
OPTION PERIOD TWO (2)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2016 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD TWO 600 LH
(2)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2017 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD TWO 600 LH
(2)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2018 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 600 LH
OPTION PERIOD TWO (2)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2019 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 600 LH
PERIOD TWO (2)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2020 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 600 LH
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
13 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
(QCLT) OPTION PERIOD TWO (2)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2021 QUALITY CONTROL APPLICATION ANALYST (TESTER) 600 LH
(QCT) OPTION PERIOD TWO (2)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2022 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 600 LH
OPTION PERIOD TWO (2)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2023 PROJECT MANAGER (PM) OPTION PERIOD TWO (2)- ON 480 LH
CALL ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2024 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 480 LH
OPTION PERIOD TWO (2)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2025 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 480 LH
OPTION PERIOD ONE (1)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2026 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 480 LH
OPTION PERIOD TWO (2)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
14 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
2027 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD TWO 480 LH
(2)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2028 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD TWO 480 LH
(2)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2029 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 480 LH
OPTION PERIOD TWO (2)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2030 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 480 LH
PERIOD TWO (2)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2031 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 480 LH
(QCLT) OPTION PERIOD TWO (2)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2032 QUALITY CONTROL APPLICATION ANALYST (TESTER) 480 LH
(QCT) OPTION PERIOD TWO (2)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
2033 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 480 LH
OPTION PERIOD TWO (2)- ON CALL ESTIMATE.
(Option Line Item)
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
15 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
05/19/2017
Period of Performance: 05/19/2017 to 05/18/2018
3001 PROJECT MANAGER (PM) OPTION PERIOD THREE (3) - 3760 LH
LABOR ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3002 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 3760 LH
OPTION PERIOD THREE (3) - LABOR ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3003 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 3760 LH
OPTION PERIOD THREE (3) - LABOR ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3004 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 3760 LH
OPTION PERIOD THREE (3) - LABOR ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3005 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD 3760 LH
THREE (3) - LABOR ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3006 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD 3760 LH
THREE (3) - LABOR ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3007 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 3760 LH
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
16 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
OPTION PERIOD THREE (3) - LABOR ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3008 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 3760 LH
PERIOD THREE (3) - LABOR ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3009 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 3760 LH
(QCLT) OPTION PERIOD THREE (3) - LABOR ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3010 QUALITY CONTROL APPLICATION ANALYST (TESTER) 3760 LH
(QCT) OPTION PERIOD THREE (3) - LABOR ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3011 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 3760 LH
OPTION PERIOD THREE (3) - LABOR ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3012 PROJECT MANAGER (PM) OPTION PERIOD THREE (3)- 600 LH
OVERTIME ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3013 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 600 LH
OPTION PERIOD THREE (3)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
17 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
3014 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 600 LH
OPTION PERIOD THREE (3)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3015 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 600 LH
OPTION PERIOD THREE (3)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3016 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD 600 LH
THREE (3)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3017 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD 600 LH
THREE (3)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3018 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 600 LH
OPTION PERIOD THREE (3)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3019 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 600 LH
PERIOD THREE (3)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3020 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 600 LH
(QCLT) OPTION PERIOD THREE (3)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2018
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
18 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
Period of Performance: 05/19/2018 to 05/18/2019
3021 QUALITY CONTROL APPLICATION ANALYST (TESTER) 600 LH
(QCT) OPTION PERIOD THREE (3)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3022 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 600 LH
OPTION PERIOD THREE (3)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3023 PROJECT MANAGER (PM) OPTION PERIOD THREE (3)- ON 480 LH
CALL ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3024 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 480 LH
OPTION PERIOD THREE (3)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3025 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 480 LH
OPTION PERIOD THREE (3)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3026 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 480 LH
OPTION PERIOD THREE (3)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3027 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD 480 LH
THREE (3)- ON CALL ESTIMATE.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
19 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3028 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD 480 LH
THREE (3)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3029 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 480 LH
OPTION PERIOD THREE (3)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3030 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 480 LH
PERIOD THREE (3)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3031 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 480 LH
(QCLT) OPTION PERIOD THREE (3)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3032 QUALITY CONTROL APPLICATION ANALYST (TESTER) 480 LH
(QCT) OPTION PERIOD THREE (3)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
3033 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 480 LH
OPTION PERIOD THREE (3)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2018
Period of Performance: 05/19/2018 to 05/18/2019
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
20 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
4001 PROJECT MANAGER (PM) OPTION PERIOD FOUR (4) - 3760 LH
LABOR ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4002 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 3760 LH
OPTION PERIOD FOUR (4) - LABOR ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4003 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 3760 LH
OPTION PERIOD FOUR (4) - LABOR ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4004 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 3760 LH
OPTION PERIOD FOUR (4) - LABOR ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4005 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD 3760 LH
FOUR (4) - LABOR ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4006 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD 3760 LH
FOUR (4) - LABOR ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4007 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 3760 LH
OPTION PERIOD FOUR (4) - LABOR ESTIMATE.
(Option Line Item)
05/19/2019
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
21 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
Period of Performance: 05/19/2019 to 05/18/2020
4008 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 3760 LH
PERIOD FOUR (4) - LABOR ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4009 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 3760 LH
(QCLT) OPTION PERIOD FOUR (4) - LABOR ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4010 QUALITY CONTROL APPLICATION ANALYST (TESTER) 3760 LH
(QCT) OPTION PERIOD FOUR (4) - LABOR ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4011 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 3760 LH
OPTION PERIOD FOUR (4) - LABOR ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4012 PROJECT MANAGER (PM) OPTION PERIOD FOUR (4)- 600 LH
OVERTIME ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4013 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 600 LH
OPTION PERIOD FOUR (4)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4014 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 600 LH
OPTION PERIOD FOUR (4)- OVERTIME ESTIMATE.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
22 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4015 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 600 LH
OPTION PERIOD FOUR (4)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4016 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD 600 LH
FOUR (4)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4017 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD 600 LH
FOUR (4)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4018 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 600 LH
OPTION PERIOD FOUR (4)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4019 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 600 LH
PERIOD FOUR (4)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4020 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 600 LH
(QCLT) OPTION PERIOD FOUR (4)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
23 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
4021 QUALITY CONTROL APPLICATION ANALYST (TESTER) 600 LH
(QCT) OPTION PERIOD FOUR (4)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4022 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 600 LH
OPTION PERIOD FOUR (4)- OVERTIME ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4023 PROJECT MANAGER (PM) OPTION PERIOD FOUR (4)- ON 480 LH
CALL ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4024 INFRASTRUCTURE CONFIGURATION MANAGEMENT (ICM) 480 LH
OPTION PERIOD FOUR (4)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4025 INFRASTRUCTURE CONFIGURATION ANALYSIS (ICA) 480 LH
OPTION PERIOD FOUR (4)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4026 INFRASTRUCTURE APPLICATION ENGINEERING (IAE) 480 LH
OPTION PERIOD FOUR (4)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4027 SCM CONFIGURATION MANAGER (SCM) OPTION PERIOD 480 LH
FOUR (4)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2019
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
24 121
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DOL-OPS-15-R-00006
Period of Performance: 05/19/2019 to 05/18/2020
4028 SCM CONFIGURATION ANALYST (SCA) OPTION PERIOD 480 LH
FOUR (4)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4029 SCM APPLICATIONS SYSTEM ADMINISTRATOR (SASA) 480 LH
OPTION PERIOD FOUR (4)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4030 QUALITY ASSURANCE MANAGEMENT ANALYST (QA) OPTION 480 LH
PERIOD FOUR (4)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4031 QUALITY CONTROL APPLICATION ANALYST LEAD (TESTER) 480 LH
(QCLT) OPTION PERIOD FOUR (4)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4032 QUALITY CONTROL APPLICATION ANALYST (TESTER) 480 LH
(QCT) OPTION PERIOD FOUR (4)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
4033 QUALITY CONTROL LOAD TEST SPECIALIST (QCLTS) 480 LH
OPTION PERIOD FOUR (4)- ON CALL ESTIMATE.
(Option Line Item)
05/19/2019
Period of Performance: 05/19/2019 to 05/18/2020
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
DOL-OPS-15-R-00006
B – SUPPLIES OR SERVICES/PRICE
B.1. GENERAL
The contractor shall furnish Quality Assurance (QA), Quality Control- Independent Verification, Validation, & Testing (QC-IVV&T), software Change Management (sCM) and infrastructure Change Management (iCM) services for the U.S. Department of Labor, Employment and Training Administration (ETA), Office of Information Systems and Technology (OIST) in accordance with the terms and conditions as set forth in the Solicitation document (including all amendments), and resulting contract.
B.2. CONTRACT TYPE
The Government anticipates awarding a labor hours (LH), indefinite delivery, indefinite quantity (IDIQ) type contract for a one year base period and four one year option periods. All options will be exercised at the unilateral discretion of the Government.
B.3. PERIOD OF PERFORMANCE
This contract shall be in effect for a Base Period of one (1) year from date of contract award. The anticipated performance periods are as follows:
Base Period: 5/19/2015 – 5/18/2016 Option Period 1: 5/19/2016 – 5/18/2017 Option Period 2: 5/19/2017 – 5/18/2018 Option Period 3: 5/19/2018 – 5/18/2019 Option Period 4: 5/19/2019 – 5/18/2020
B.4. MINIMUM GURANTEED
The Government’s only obligation is the Guaranteed Minimum Amount of Service for the Base Period under the contract. The minimum amount is $2,000.00 for the contract. The five year ceiling amount is $43,111,482.19. Ceiling labor hours is 18,800 labor hours. Ceiling overtime hours is 3000 labor hours. Ceiling on-call hours is 2400 labor hours.
B.5. DELIVERY SCHEDULE
Employee & Training Administration, U.S. Department of Labor, 200 Constitution Avenue, NW, Washington, DC 20210. Attn: COR Florence Davidson.
B.6. INCREMENTAL FUNDING
Funds are not presently available for performance under this contract beyond the base period. The Government's obligation for performance of this contract beyond that date is contingent upon the availability of funds from which payment for contract purposes can be made through the benefits fund. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond the existing period of performance, until funds are made available to the Contracting Officer for performance and until the contractor receives notice of availability which must be confirmed in writing by the Contracting Officer.
B.8. ESTIMATED QUANTITIES
CLIN Base Year Estimated Labor Category Est Hrs
0001 Project Manager (PM)
0002 infrastructure Configuration Management(iCM)
0003 infrastructure Configuration Analysis (iCA)
0004 infrastructure Application Engineering (iAE)
0005 sCM Configuration Manager (sCM)
0006 sCM Configuration Analyst (sCA)
0007 sCM Applications Systems Administrator (sASA)
0008 Quality Assurance Management Analyst (QA)
Quality Control Application Analyst Lead (Tester) (QCLT)
Quality Control Application Analyst (Tester)
(QCT)
0011 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
41360
CLIN Base Year Estimated Labor Category Overtime Est Hrs
0012 Project Manager (PM)
0013 infrastructure Configuration Management(iCM)
0014 infrastructure Configuration Analysis (iCA)
0015 infrastructure Application Engineering (iAE)
0016 sCM Configuration Manager (sCM)
0017 sCM Configuration Analyst (sCA)
0018 sCM Applications Systems Administrator (sASA)
0019 Quality Assurance Management Analyst (QA)
0022 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
CLIN Base Year Estimted Labor Category On Call Est Hrs
0023 Project Manager (PM)
0024 infrastructure Configuration Management(iCM)
0025 infrastructure Configuration Analysis (iCA)
0026 infrastructure Application Engineering (iAE)
0027 sCM Configuration Manager (sCM)
0028 sCM Configuration Analyst (sCA)
0029 sCM Applications Systems Administrator (sASA)
0030 Quality Assurance Management Analyst (QA)
0033 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
CLIN Option Period One (1) Estimated Labor Category Est Hrs
1001 Project Manager (PM)
1002 infrastructure Configuration Management(iCM)
1003 infrastructure Configuration Analysis (iCA)
1004 infrastructure Application Engineering (iAE)
1005 sCM Configuration Manager (sCM)
1006 sCM Configuration Analyst (sCA)
1007 sCM Applications Systems Administrator (sASA)
1008 Quality Assurance Management Analyst (QA)
1011 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
41360
CLIN Option Period One (1) Estimated Labor Category Overtime
Est Hrs
1012 Project Manager (PM)
1013 infrastructure Configuration Management(iCM)
1014 infrastructure Configuration Analysis (iCA)
1015 infrastructure Application Engineering (iAE)
1016 sCM Configuration Manager (sCM)
1017 sCM Configuration Analyst (sCA)
1018 sCM Applications Systems Administrator (sASA)
1019 Quality Assurance Management Analyst (QA)
1022 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
CLIN Option Period One (1) Estimted Labor Category On Call
Est Hrs
1023 Project Manager (PM)
1024 infrastructure Configuration Management(iCM)
1025 infrastructure Configuration Analysis (iCA)
1026 infrastructure Application Engineering (iAE)
1027 sCM Configuration Manager (sCM)
1028 sCM Configuration Analyst (sCA)
1029 sCM Applications Systems Administrator (sASA)
1030 Quality Assurance Management Analyst (QA)
1033 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
CLIN Option Period Two (2) Estimated Labor Category
Est Hrs
2001 Project Manager (PM)
2002 infrastructure Configuration Management(iCM)
2003 infrastructure Configuration Analysis (iCA)
2004 infrastructure Application Engineering (iAE)
2005 sCM Configuration Manager (sCM)
2006 sCM Configuration Analyst (sCA)
2007 sCM Applications Systems Administrator (sASA)
2008 Quality Assurance Management Analyst (QA)
2011 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
41360
CLIN Option Period Two (2) Estimated Labor Category Overtime
Est Hrs
2012 Project Manager (PM)
2013 infrastructure Configuration Management(iCM)
2014 infrastructure Configuration Analysis (iCA)
2015 infrastructure Application Engineering (iAE)
2016 sCM Configuration Manager (sCM)
2017 sCM Configuration Analyst (sCA)
2018 sCM Applications Systems Administrator (sASA)
2019 Quality Assurance Management Analyst (QA)
2022 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
CLIN Option Period Two (2) Estimted Labor Category On Call
Est Hrs
2023 Project Manager (PM)
2024 infrastructure Configuration Management(iCM)
2025 infrastructure Configuration Analysis (iCA)
2026 infrastructure Application Engineering (iAE)
2027 sCM Configuration Manager (sCM)
2028 sCM Configuration Analyst (sCA)
2029 sCM Applications Systems Administrator (sASA)
2030 Quality Assurance Management Analyst (QA)
2033 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
CLIN Option Period Three (3) Base Year Estimated Labor Category
Est Hrs
3001 Project Manager (PM)
3002 infrastructure Configuration Management(iCM)
3003 infrastructure Configuration Analysis (iCA)
3004 infrastructure Application Engineering (iAE)
3005 sCM Configuration Manager (sCM)
3006 sCM Configuration Analyst (sCA)
3007 sCM Applications Systems Administrator (sASA)
3008 Quality Assurance Management Analyst (QA)
3011 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
41360
CLIN Option Period Three (3) Estimated Labor Category Overtime
Est Hrs
3012 Project Manager (PM)
3013 infrastructure Configuration Management(iCM)
3014 infrastructure Configuration Analysis (iCA)
3015 infrastructure Application Engineering (iAE)
3016 sCM Configuration Manager (sCM)
3017 sCM Configuration Analyst (sCA)
3018 sCM Applications Systems Administrator (sASA) 600
3019 Quality Assurance Management Analyst (QA) 600
3022 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
CLIN Option Period Three (3) Estimted Labor Category On Call
Est Hrs
3023 Project Manager (PM)
3024 infrastructure Configuration Management(iCM)
3025 infrastructure Configuration Analysis (iCA)
3026 infrastructure Application Engineering (iAE)
3027 sCM Configuration Manager (sCM)
3028 sCM Configuration Analyst (sCA)
3029 sCM Applications Systems Administrator (sASA)
3030 Quality Assurance Management Analyst (QA)
3033 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
CLIN Option Period Four (4) Estimated Labor Category
Est Hrs
4001 Project Manager (PM)
4002 infrastructure Configuration Management(iCM)
4003 infrastructure Configuration Analysis (iCA)
4004 infrastructure Application Engineering (iAE)
4005 sCM Configuration Manager (sCM)
4006 sCM Configuration Analyst (sCA)
4007 sCM Applications Systems Administrator (sASA)
4008 Quality Assurance Management Analyst (QA)
4011 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
41360
CLIN Option Period Four (4) Estimated Labor Category Overtime
Est Hrs
4012 Project Manager (PM)
4013 infrastructure Configuration Management(iCM)
4014 infrastructure Configuration Analysis (iCA)
4015 infrastructure Application Engineering (iAE)
4016 sCM Configuration Manager (sCM)
4017 sCM Configuration Analyst (sCA)
4018 sCM Applications Systems Administrator (sASA)
4019 Quality Assurance Management Analyst (QA)
4022 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
CLIN Option Period Four (4) Estimted Labor Category On Call
Est Hrs
4023 Project Manager (PM)
4024 infrastructure Configuration Management(iCM)
4025 infrastructure Configuration Analysis (iCA)
4026 infrastructure Application Engineering (iAE)
4027 sCM Configuration Manager (sCM)
4028 sCM Configuration Analyst (sCA)
4029 sCM Applications Systems Administrator (sASA)
4030 Quality Assurance Management Analyst (QA)
4033 Quality Control Load Test Specialist (QCLTS)
TOTAL ESTIMATED HOURS
C – STATEMENT OF WORK
CHANGE MANAGEMENT/QUALITY ASSURANCE/QUALITY CONTROL
PWS STATEMENT OF WORK
OBJECTIVES
The purpose of this solicitation is to award a contract for Quality Assurance (QA), Quality Control-Independent Verification, Validation, & Testing (QC-IVV&T), software Change Management (sCM) and infrastructure Change Management (iCM) services. In response to this solicitation, vendors are requested to submit their proposed plan regarding how they will execute the services/tasks as described within this SOW. This includes services/tasks such as but limited to, (not listed in any particular order):
The vendor shall be a certified Capability Maturity Model Integration Maturity Level -2, (for Services preferred) company, providing Capability Maturity Model Integration - Level 2, (for Development) services to:
DOL/OCIO, infrastructure Configuration Management (iCM):
o Project Management o Infrastructure Configuration Management(iCM) o Infrastructure Configuration Analysis (iCA) o Infrastructure Application Engineering (iCAE)
ETA/OIST
o Project Management o Software Configuration Management (sCM) o Software Configuration Analysis (sCA) o Software Application Engineering (sAE) o Software Applications Systems Administration o Quality Assurance (QA) o Quality Control-Independent Verification, Validation & Testing
(QC-IVV&T)
Pursuant to the execution of these services, the vendor is expected to have:
Knowledgeable and experienced in industry accepted Change Management, Quality Assurance and Quality Control-IVV&T principles, network and data center operations and architectures, current techniques and tools for monitoring enterprise IT environments, analytics, industry and Government best practices and Government IT security regulations and policies.
Demonstrated experience with applying industry and government best practices to all service activities identified above.
Demonstrated experience and knowledge with applications development and governance processes (e.g. Organizational Configuration
Management Board (OCMB), Change Control Board (CCB) and Release Management (RM))
Demonstrated experience and knowledge with the practical application of Software Development Life-Cycle Management principles
Demonstrated experience and design, implementation, maintenance and management of a configuration Management Database (CMDB).
Demonstrated experienced in QA, QC-IVV&T, sCM as they applied to software development operations throughout the product’s life-cycle.
This includes but is not limited to, continuous monitoring of policy and process compliance, governance, current application testing techniques, defects (bug) reporting and change control activities;
maintaining the integrity of the application and documentation repository; developing and maintaining configuration management plans; monitoring system configurations e.g. assessing and testing the level of compliance with established baseline configurations;
static and dynamic functional and regression applications testing &verification; static and dynamic application security testing; 508 compliance testing; mobile application testing, web portal testing, defects (bugs) reporting techniques; monitoring updates to baseline configurations; and configuration status of the enterprise IT environment.
Demonstrated experienced in providing overarching Continuous Quality Improvement program that is inclusive of processes, policies, governance and operations. It is incumbent upon the vendor to ensure the integrity and quality of applications and subsidiary products developed to support the execution of ETA/OIST’s mission. The vendor must be certified at a CMMI – Level 2 (for Services preferred).
DOL/OCIO’s Infrastructure Change Management
DOL/OCIO’s iCM is a closely focused and distinct specialty that places rigorous adherence to well-engineered processes, rigid quality assurance standards and quality control measurements, continuous and real-time enterprise IT infrastructure monitoring inclusive of all environments, rapid and precise management controls for responding to risks and unauthorized changes.
Infrastructure Change Management
ICM activities include all activities associated with monitoring and documenting DOL’s enterprise IT environments (Production Network/Data Center environment, QA/QC Testing environment, QA/QC UAT Testing environment and Developmental environments)
ICM shall document and annually update all DOL OCIO policies and procedures associated with Infrastructure Change Management
ICM shall identify and verify enterprise IT assets and configurations within the DOL enterprise IT environments.
ICM shall identify Configuration Items (CI) to include collecting, recording and maintaining accurate information about CIs.
ICM shall create, managing and maintain DOL’s CMDB.
ICM shall document all authorized and approved configuration changes to DOL’s IT enterprise infrastructure.
ICM shall develop, document, and maintain baseline configurations, configuration management plans, as well as system component inventories.
ICM shall monitor, manage and control all authorized changes, according to DOL OCIO policies and guidance, to the enterprise IT infrastructure.
ICM shall document and report all authorized changes made to DOL’s enterprise IT infrastructure to include but not limited to:
o Hardware o Software (GSS, COTS, Govt. developed application) o Firmware o Other
ICM shall report all unauthorized changes to the Enterprise IT infrastructure according to DOL Policies and guidelines.
ICM Develop and implement procedures to routinely monitor and manage hardware, software, and firmware configurations.
ICM shall routinely monitor changes to the configuration settings in accordance with DOL policies and procedures.
ICM shall develop, document and maintain baseline configurations of the Enterprise IT Infrastructure and shall provide this report at the beginning of each month to OCIO Federal Manager, and provide adhoc reports as requested.
ICM shall perform system administrative functions, e.g. major/minor software release version upgrades, service pack installations, software patch releases for OCIO’s CM operations:
OCIO Application Suite o Remedy ver. 7.x o Remedy ver. 8.x
ICM shall provide custom development applications and tools capabilities using current OCIO CM Software Suite to maximize efficiencies and/or to exploit the applications capabilities and deploy value-add tools that improve or enhances OCIO’s business operations.
ICM shall perform a variety of system engineering tasks and activities relative to current OCIO CM Software Suite.
ICM shall develop and maintain automated workflows that comply with CMMI II standards using software products owned by DOL:
Application Suite o Remedy ver. 7.x o Remedy ver. 8.x
ETA/OIST’s Change Management
In the broadest of terms, provides the framework from which processes are designed that governs the logical flow of any change type from initiation/creation, through technical review and vetting, to approval, implementation, monitoring, and reporting. Often, Change Management is thought of within the context of an organization’s IT infrastructure, hardware, firmware, Operating Systems and applications. CM is accountable to oversee a collection of processes that collectively bring about an assurance that a Change Request is meticulously vetted, and if approved, becomes a sanctioned change that is acted upon in a definitive manner, ensuring activities and resources are coordinated, stringent management controls are in place and monitoring validates only the authorized change, as approved, is implemented. Risk is well defined and risk response plans are in place to effectively mitigate the impact of any known risk should they occur.