Wind_River_Utility_Estimate.pdf

PDF 187 KB Posted

Attached to
Operation of the Wind River Job Corps Center
Solicitation number
DOL141RP20770
Issued by

About this file

Wind River Utility Estimate

View the file

Other files

File Type Posted
Wind_River_Student_Build-Up_Plan.pdf PDF
Wind_River_Proposed_GSA_Vehicles.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Electricity ($/kWh) Natural Gas ($/CCF) Water ($/kGallon)

October 0.116$ 0.973$ 3.530$

November 0.111$ 1.051$ 3.500$

December 0.107$ 1.211$ 5.233$

January 0.120$ 1.146$ 3.574$

February 0.116$ 1.350$ 3.574$

March 0.110$ 1.162$ 5.225$ April 0.108$ 0.931$ 3.492$

May 0.110$ 0.879$ 3.376$

June 0.134$ 0.965$ 5.466$

July 0.115$ 1.219$ 3.318$ Electricity (kWh) Natural Gas (CCF) Electricity (kWh) Natural Gas (CCF) August 0.109$ 0.925$ 3.323$ Use 1,398,681 77,009 Use 1,678,417 92,411 September 0.110$ 0.925$ 5.127$ Cost 136,966$ 160,711$ Cost 252,434$ 119,272$

Average 0.114$ 1.061$ 4.062$ Cost per Unit 0.098$ 2.087$ Cost per Unit 0.150$ 1.291$

Electricity Natural Gas Electricity Natural Gas

Electricity ($/GSF) Natural Gas ($/GSF) Water ($/GSF) GSF GSF

Annual 1.110$ 1.013$ 0.154$ Cost per GSF 0.892$ 1.046$ Cost per GSF 1.643$ 0.776$

Projected Cost 170,432.88$ 155,557.38$ 23,675.90$ Cost 136,966$ 160,711$ Projected Cost 252,434$ 119,272$

Electricity ($/GSF) Natural Gas ($/GSF) Water ($/GSF)

Annual 1.221$ 1.071$ 0.077$

Projected Cost 187,476.17$ 164,579.71$ 11,850.58$

ESC's Estimate

Wind River - Based on averages from other Centers (FY2012-FY2013)

Cost Per Unit

A/E's Estimate

A/E Proposed Design + 20% A/E Proposed Design FY2015

Wind River - Projected FY2015

Cost Per GSF

Wind River - Based on averages from other Centers (FY2012-FY2013) A/E Proposed Design + 20% A/E Proposed Design FY2015

Cost Per GSF 153,605 153,605