94-1091-1602 1441
Project Title: EDUCATION, RECREATION & ADMINSTRATION BUILDINGS RENOVATION AT THE
BAMBERG JOB CORPS CENTER
The work includes services for the design and construction to do approximately 15,400 SF of extensive renovation on the existing three buildings at the Bamberg Job Corps Center, located in Bamberg, South Carolina. The work also includes services for the design and construction to renovate the interior of Building 1 for soft vocations and non-academic functions, the interior of Building 2 for bathroom renovations, the interior of Building 3 for Administration functions, and the interior of Building 20 to consolidate hard vocations and to expand Culinary Arts at the Bamberg Job Corps Center.
Bamberg Job Corps Center 19 Job Corps Avenue P.O. Box 967 Bamberg, SC 29003 (Bamberg County) Telephone: (803) 245-5101
Scheduled Site Visit: Wednesday, April 14, 2010 at 11:00 Eastern MARK MCCORMIC, Project Manager (703) 516-2293
PUBLICATION DISCLOSURE
This procurement is being funded under the American Recovery and Reinvestment Act (ARRA), Public Law 111-5 (February 17, 2009). For each such Government contract, DOL is required to post certain details of the contract on DOL's website, which is linked to Recovery.gov via the award number. For contracts over $500,000.00, DOL is also required to post a summary of the contract.
1. SOLICITATION NO. 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 4-85)STANDARD FORM 1442
Prescribed by GSA YFAR (48 CFR) 52.236-1(d)NSN 7540-01-155-3212
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATIONSOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
E-MAIL MIRIAM J. HOLST holst.miriam@dol.gov
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within 1 calendar days and complete it within 398 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _____________________________.)
YES NO
A. Sealed offers in original and 5 copies to perform the work required are due at the place specified in Item 8 by 4/30/10_
(hour) local time 3:00pm Eastern (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference
D. Offers providing less than 120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NOTICE: SET-ASIDE for Total HUBZONE SMALL BUSINESSES
DOL110RP20910 3/31/09 1 OF 104
X
OASAM Office of Procurement Services SEE SECTION L U. S. Department of Labor Suite N-4308 200 Constitution Ave., NW Washington DC 20210
52.211-10
X 10 DAYS
X
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO.
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS 0001 Education, Recreation, & Administration Buildings Renovation at the Bamberg Job Corp Center …………………………………… $____________________
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20B. SIGNATURE 20C. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation, is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work, requisitions identified award consummates the contract. which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER
TO SIGN
30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA
BY
OFFER
AWARD
STANDARD FORM 1442(REV. 4-85)BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14)
(Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
OASAM Office of Procurement Services U. S. Department of Labor Suite N-4308 200 Constitution Ave., NW Washington DC 20210
OASAM BRANCH OF INVOICE PAYMENTS
Suite S-5526
U.S. DEPARTMENT OF LABOR
200 CONSTITUTION AVENUE, NW
WASHINGTON DC 20210
Table of Contents
PART I - THE SCHEDULE............................................................................................................. A-1
SECTION A - SOLICITATION/CONTRACT FORM................................................................. A-1
SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)..... A-1
PART I - THE SCHEDULE..............................................................................................................B-1
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS ................................................B-1
B.1 PRICE/COST SCHEDULE ..................................................................................................B-1
B.2 DELIVERABLE - AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA)
REPORTING FROM THE PRIME RECIPIENTS…………………………………..……B-1
B.3 DELIVERABLE - RELEASABLE COPIES - FREEDOM
OF INFORMATION ACT………………………………………………………….……..B-2
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK...................... C-1
[For this Solicitation, there are NO clauses in this Section]
SECTION D - PACKAGING AND MARKING............................................................................ D-1
[For this Solicitation, there are NO clauses in this Section] ....................................................... D-1
SECTION E - INSPECTION AND ACCEPTANCE......................................................................E-1
E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE .......E-1
SECTION F - DELIVERIES OR PERFORMANCE.....................................................................F-1
F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE .......F-1
F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984) ALTERNATE I (APR 1984)........................................................................F-1
F.3 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEPT 2000) ALTERNATE I
(APR 1984) .........................................................................................................................F-1
SECTION G - CONTRACT ADMINISTRATION DATA…………………………..……….…G-1
G.1 PRE-CONSTRUCTION CONFERENCE……………………………………..…………G-1
G.2 PERIODIC PROJECT MEETINGS……………………………………..……………….G-1
G.3 SUBCONTRACTS………………………………………………………..……………...G-1
G.4 SHOP DRAWINGS……………………………………………………..………………..G-1
G.5 OPERATIONS, STORAGE AREAS AND SECURITY………………..……………….G-2
G.6 PROJECT SAFETY……………………………………………………..………………..G-3
G-7 DISPOSAL OF REFUSE………………………………………………...……………….G-3
G.8 SCHEDULE OF PROGRESS……………………………………………..……………...G-4
G.9 PAYMENTS TO CONTRACTOR………………………………………..……………...G-4
G.10 FURNISHING INFORMATION AND RECORDS………………………..……………G-5
G.11 WORKERS’ COMPENSATION LAWS…………………………………..…………….G-5
G.12 REQUIRED INSURANCE………………………………………………..……………..G-5
G.13 EQUITABLE ADJUSTMENTS………………………………………….……………...G-7
G.14 WEATHER DELAYS (EXCUSABLE DELAY)………………………….…………….G-9
G.15 TEST RESULTS…………………………………………………………...…………….G-9
G.16 AS-BUILT RECORD OF MATERIALS AND INSTALLATION……..….…………....G-9
G-17 SUBSTANTIAL COMPLETION……………………………………………….……….G-9
i
G-18 CONTRACT CLOSEOUT………………………………………………….…………...G-10
G.19 PRECEDENCE OF PLANS, SPECIFICATIONS, AND CLAUSES……….…………..G-11
SECTION H - SPECIAL CONTRACT REQUIREMENTS ........................................................ H-1
H.1 52.236-25 REQUIREMENTS FOR REGISTRATION OF DESIGNERS
(JUNE2003)……………………………………………………………………….……..H-1
H.2 DISPOSITION OF MATERIAL………………………………………………….….…....H-1
H.3 HAZARDOUS OCCUPATION ORDERS………………………………………………..H-1
H.4 RIGHTS AND OBLIGATIONS……………………………………………………..….....H-1
H.5 INITIATION OF LIQUIDATED DAMAGES………………………………….....………H-1
PART II - CONTRACT CLAUSES .................................................................................................I-1
SECTION I - CONTRACT CLAUSES...........................................................................................I-1
I.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE ......... I-1
I.2 52.203-15 WHISTLEBLOWER PROTECTIONS UNDER THE AMERICAN RECOVERY
AND REINVESTMENT ACT OF 2009 (MAR 2009)....................................... I-4
I.3 52.204-11 AMERICAN RECOVERY AND REINVESTMENT ACT—REPORTING
REQUIREMENTS (MAR 2009).......................................................................... I-4 I.4 52.219-3 NOTICE OF TOTAL HUBZONE SET-ASIDE (JAN 1999)................................. I-7
I.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(JUNE 2007)........................................................................................................... I-8
I.6 52.222-39 NOTIFICATION OF EMPLOYEE RIGHTS CONCERNING PAYMENT OF
UNION DUES OR FEES (DEC 2004)................................................................. I-9
I.7 52.225-21 REQUIRED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED
GOODS-BUY AMERICAN ACT-CONSTRUCTION
MATERIALS (Mar 2009) ............................................................................. .…I-11
I.8 52.227-23 RIGHTS TO PROPOSAL DATA (TECHNICAL)(JUN 1987)………..……..I-14
I.9 52.228-1 BID GUARANTEE (SEP 1996) ........................................................................ I-15
I.10 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION
(NOV 2006) ........................................................................................................ I-15
I.11 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (OCT 2008) .I-16
I.12 52.236-4 PHYSICAL DATA (APR 1984)....................................................................... I-24
I.13 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
ALTERNATE I (APR 1984)............................................................................ I-24 I.14 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) ....................................... I-25
I.15 52.249-14 EXCUSABLE DELAYS (APR 1984)………………………………………..I-26
I.16 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)...................... I-27
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS................. J-1
SECTION J - LIST OF ATTACHMENTS...................................................................................... J-1
DAVIS BACON WAGE RATES (ATTACHMENT J-1)………………………………………J-1
PART IV - REPRESENTATIONS AND INSTRUCTIONS....................................................... K-1
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF
OFFERORS .............................................................................................................................. K-1
K.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED
BY REFERENCE................................................................................................................ K-1 ii
K.2 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2006) ...... K-1
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS ...............L-1
L.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED
BY REFERENCE ...............................................................................................................L-1
L.2 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF
FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM
DESCRIPTIONS, FPMR PART 101-29 (AUG 1998).......................................................L-1
L.3 52.216-1 TYPE OF CONTRACT (APR 1984)..................................................................L-2
L.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999).........L-2
L.5 52.233-2 SERVICE OF PROTEST (SEP 2006) ................................................................L-3 L.6 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995).................................................L-4
L.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)..........................................................................................................................L-4 L.8 52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)...........................................L-4 L.9 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)........................L-4
L.10 PROPOSAL SUBMISSION REQUIREMENTS….……………………………………...L-5
SECTION M - EVALUATION FACTORS FOR AWARD......................................................... M-1
M.1 SELECTION CRITERIA………………………………………………………………….M-1
M.2 PRICE EVALUATION……………………………………………………………………M-1
iii
DOL110RP20910 SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
B-1
SECTION B - CONTINUATION BLOCK
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 PRICE/COST SCHEDULE
ITEM DESCRIPTION:
The work includes services for the design and construction to do approximately 15,400 SF of extensive renovation on the existing three buildings at the Bamberg Job Corps Center, located in Bamberg:
GRAND TOTAL ---$
B.2 DELIVERABLE - AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA)
REPORTING FROM THE PRIME RECIPIENTS
The ARRA requires extensive reporting from the prime contractors on contracts awarded with funds appropriated under ARRA. The contractor is required to provide the reports as deliverables under this contract. These reports will be posted on a website, www.recovery.gov which is accessible by the public.
Three (3) days after contract award the contractor shall register at www.federalreporting.gov. The Contractor shall provide copies of registration confirmations and report confirmations, via e-mail, to the Contracting Officer. The contractor shall complete the reports as required and provide a copy of the reports submitted under this website to the Office of Acquisition Management Services via e-mail to veatch.valerie@dol.gov.
(1) The total amount of ARRA fund received from this agency under this contract;
(2) The amount of ARRA funds received that were expended or obligated to projects or activities under this contract, or which remain unobligated.
(3) A detailed list of all projects or activities for which ARRA funds were expanded or obligated under this contract, including--
(A) The name of the project or activity;
(B) A description of the project or activity;
(C) An evaluation of the completion status of the project or activity;
(D) An estimate of the number of jobs created and the number of jobs retained by the project or activity; and
DOL110RP20910 SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
B-2
(4) Detailed information on any subcontracts awarded under this contract using ARRA funds, including the data elements required to comply with the Federal Funding Accountability and Transparency Act of 2006 (P.L. 109-282). Subcontract costs of less than $25,000 may be reported in the aggregate. It is anticipated that this data will potentially be submitted through the governments' Electronic Subcontract Reporting System, however if the system is not available, the reporting requirement will not be waived and all report shall be submitted to the DOL. The minimum required data elements are:
(A) contractor name;
(B) amount of award;
(C) information on the award, including transaction type, funding agency, NAICS code, programs source, and award title descriptive of the purpose of the funding action;
(D) the location of the contractor, and the primary location of contractor performance (city, state, congressional district, country)
(E) a unique identifier for the contract, and its parent, if any;
(F) any other relevant information required by the OMB.
(G) including the data elements required to comply with the Federal Funding Accountability and Transparency Act of 2006 (P.L. 109-282)
In the event the contractor has more than one ARRA funded contract with DOL, the reports may be combined with other DOL ARRA funded reporting. In this event, duplicate copies of the combined report must be submitted to each COTR.
B.3 DELIVERABLE - RELEASABLE COPIES - FREEDOM OF INFORMATION ACT
The Freedom of Information Act (FOIA) permits withholding information under several exemptions, including Exemption 4 which protects "trade secrets and commercial or financial information obtained from a person [that is] privileged or confidential," 5 U.S.C. 552(b)(4). Within 5 business days of contract award, the contractor shall provide a statement that the contract is available for full disclosure under the FOIA or provide a scanned PDF of the redacted copy of the contract identifying the specific potions the contractor believes are covered by the particular exemption requested. Any redactions must be fully supported under the FOIA. In the event the Government notifies the contractor that it does not agree with a proposed redaction, the contractor shall have 5 business days to submit additional information to support the requested redaction. For subcontracts, within 5 business days of the contractor's award of any subcontract over $500,000 the contractor shall provide the Government a scanned PDF copy of the subcontract with a statement that the copy is either available for full disclosure, or identifying the specific portions believed to be covered by the particular exemption requested. Redactions should be limited to those protections provided under the FOIA. Following the procedures above, the Government has the right to notify the contractor of any disagreement with proposed redaction or exemption requests.
DOL110RP20910 SECTION C
DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
ESC: ________________________
CASS: _______________________
APPROVED: _________________
DATE: _______________________
DESIGN-BUILD SCOPE OF WORK
FOR
PROGRAM YEAR 2009–EDUCATION, RECREATION AND
ADMINISTRATION RENOVATIONS
AT THE
BAMBERG JOB CORPS CENTER
BAMBERG, SOUTH CAROLINA
U.S. DEPARTMENT OF LABOR
PREPARED BY:
PBDewberry
PROJECT NO. 1441
February 2010
DBSOW
C-1
TABLE OF CONTENTS
I. GENERAL
II. DESIGN REQUIREMENTS/SPECIFIC INSTRUCTIONS
A. LEGALLY MANDATED STANDARDS
1. Code of Federal Regulations
2. National and State Building Codes
3. Permits and Licenses
B. JOB CORPS GUIDELINES
1. JCH-814: Planning, Design, and Construction Administration Guidelines for
Architects and Engineers
2. Equipment Manual
3. TAG J: Health and Wellness Facilities Guidelines -“NOT APPLICABLE”
C. OTHER STANDARDS
1. Life Cycle Cost (LCC) Analyses–NOT APPLICABLE
2. Energy Conservation - NOT APPLICABLE
3. Environmentally Preferable Products
4. Asbestos-Containing Materials and PCB Fluorescent Light Ballasts
D. SPECIFIC INSTRUCTIONS
1. Center Operation
2. Design-Build Contractor Responsibilities
3. Submittal Requirements
4. Building Design
5. Equipment
6. Optional Provisions
7. Design Meetings
8. Site Visits - Construction Observation
9. Contract Document Reproduction
10. Availability of Existing Documents
III. EXTENT OF WORK
A. SITE IMPROVEMENTS AND UTILITIES
1. Design Objectives - NOT APPLICABLE
2. Site Improvements - NOT APPLICABLE
3. Site Utilities - NOT APPLICABLE
B. GENERAL BUILDING DESIGN REQUIREMENTS
1. Architectural
2. Structural
3. Mechanical/Plumbing
4. Electrical
5. Radon - “NOT APPLICABLE”
6. Warranties
C. FUNCTIONAL BUILDING DESIGN REQUIREMENTS
1. Programmatic Requirements
IV. CONSTRUCTION REQUIREMENTS/ SPECIFIC INSTRUCTIONS
A. SPECIFIC INSTRUCTIONS
1. Quality Requirements
2. Temporary Facilities and Controls
C-2
3. Adherence to Scope of Work
4. Incidental Cutting and Patching
5. Coordination of Work
V. SKETCHES
A. VICINITY MAP
B. LOCATION MAP
C. SITE PLAN
D. BuildingS 1, 2, 3 AND 4 E. Building 20
VI. PROJECT SCHEDULE
ATTACHMENT 1 - DB CONTRACTOR QUICK REFERENCE CHECKLIST
C-3
DESIGN-BUILD SCOPE OF WORK
PY 2009 - EDUCATION, RECREATION AND
ADMINISTRATION RENOVATIONS
BAMBERG JOB CORPS CENTER
BAMBERG, SOUTH CAROLINA
I. GENERAL
The work includes services for the design and construction to do approximately 15,400 SF of renovation on the existing five buildings at the Bamberg Job Corps Center, located in Bamberg, South Carolina. The work also includes services for the design and construction to renovate the interior of Building 1 for soft vocations and non-academic functions with enclosed ramp connection and necessary interior renovations to Building 4, the interior of Building 2 for bathroom renovations, the interior of Building 3 for Administration functions, and the interior of Building 20 to consolidate hard vocations and to expand Culinary Arts at the Bamberg Job Corps Center. The work includes, but is not limited to, general clean-up and performing general repairs to the building. Mold, mildew, and asbestos remediation may be required as part of this contract. Life safety components that include, but are not limited to, fire and egress door replacement, fire alarm system repair or upgrade, and all code required safety systems need to be verified for proper operation. Verification and repair/replacement of all emergency lighting and exit signage in the normal and loss of permanent power modes are also required to assure proper operation.
Architectural repairs/replacements include, but are not limited to, damaged and inoperable doors and door frames, windows, interior finishes, ceilings, walls, floor tiles, interior and exterior painting and cleaning of exterior walls.
Electrical replacements include, but are not limited to, wiring, conduits, light fixtures, lamps, HVAC units and fire alarms.
Mechanical installation or repairs include, but are not limited to, cleaning of ductwork, providing additional or repairing existing HVAC equipment, fire dampers, grilles, diffusers, air filters and smoke detectors.
The national and local code design and upgrade/modification of the major building systems shall be accomplished to comply with requirements of the Scope of Work for the renovation of these three buildings. The work also includes interior building demolition and demolition and removal/abandonment of unused existing utility components, and restoration of site areas impacted by construction operations.
The work shall meet the design intent given in` the Scope of Work. The extent of work is described in Part IV & V of this scope of work.
“DB Contractor Quick Reference Checklist”,Attachment 1, is a required form that identifies a simplified but not all inclusive list of issues that the design-build contractor needs to include as bid documents. The JCH-814 paragraphs shown provide an initial design reference; however, reference to other sources may be required to fully address the issue.
II. DESIGN REQUIREMENTS/SPECIFIC INSTRUCTIONS
A. LEGALLY MANDATED STANDARDS
C-4
The design-build contractor will conform to:
1. Code of Federal Regulations
a. Safety and Health…………………………………………………………..OSHA CFR Part 1926.62 NESHAP 40 CFR 61 Subpart M
40 CFR 761
Because the work may disturb painted wall surfaces, the design-build contractor shall provide the services of an independent industrial hygiene consultant to conduct representative paint sampling as necessary (in buildings erected before 1979) to determine the lead content of painted surfaces affected by the renovation. If lead paint is identified on surfaces to be disturbed by renovation activities, the design-build contractor shall include the following information in the project documents:
a) The locations and concentrations of lead-containing paint in areas affected by the renovation.
a) A requirement of the contractor to comply with the OSHA Lead Standard for Construction Industry (29 CFR 1926.62), and other environmental or occupational safety and health regulations as applicable.
a) A statement prohibiting scraping or sanding of lead painted surfaces. Where removal or demolition of lead painted building components is required, these building components shall be removed intact wherever possible.
a) A requirement that all construction debris shall be disposed of in accordance with applicable solid and hazardous waste regulations. It is anticipated that lead-painted building components will be disposed as normal construction debris.
b. Disability/Accessibility…………………………………………….28 CFR Part 36
The facility/project must be in strict conformance with the Uniform Federal Accessibility Standards (UFAS) or the American with Disability Act - Accessibility Guidelines for Buildings and Facilities (ADAAG), whichever is more stringent. The design-build contractor shall conduct a thorough research of these guidelines and, without exception, comply to the fullest extent, including those guidelines pertaining to the visually and hearing impaired.
No deviations from these guidelines are allowed. However, if the design-build contractor, at any Design Review Submittal, demonstrates that the requirements would be technically infeasible or it would cause an undue burden as defined by the guidelines, the design-build contractor is obligated to bring this requirement to the attention of the Department of Labor for a decision on such requirements.
(These standards can be printed from the website at http://www.access.gpo.gov/nara/cfr/cfr-table-search.html).
c. Life Safety Code………………………………………………………NFPA-101
The design-build contractor’s responsibility for safety related requirements extends to all impacted areas and access ways effected by the work.
C-5
2. National and State Building Codes
The design-build contractor shall conform to all applicable construction codes, ordinances, and regulations, including the national building code used in the local area, laws and local ordinances.
Deviations and interpretations shall be subject to the approval of the Department of Labor.
3. Permits and Licenses
The design-build contractor shall research, and be responsible for obtaining, all regulatory, permitting and licensing requirements in accordance with JCH-814 Section 1.5.
a. The design-build contractor shall not submit plans or specifications to any local or state authority without the prior approval of the DOL/National Office, Job Corps. Since the center is owned by the Federal Government, the DOL may be required to seek permits as required by local utility companies prior to them rendering services to the project during construction.
b. Where required by DOL, the design-build contractor shall submit the plans/specification documents to local agencies for permitting purposes. Any and all regulatory agency comments received as a result of the agency review shall be forwarded to DOL for review and approval prior to their incorporation in documents. Once approved by DOL, the necessary work to bring the documents into compliance with the comments shall be performed by the design-build contractor as part of this contract, including any subsequent re-submittals that may be required.
c. It is required that the design-build contractor will need to assess the requirements of the State of South Carolina, Bamberg County, the Bamberg Board of Public Works Commission, and the City of Bamberg, Water Gas and Light, and all applicable codes with respect to this project.
d. Written authorization is required from the Department of Labor prior to communications with the State of South Carolina, Bamberg County, the Bamberg Board of Public Works Commission, and the City of Bamberg, Water Gas and Light.
e. The design-build contractor shall provide a fixed price to obtain all permits.
B. JOB CORPS GUIDELINES
JCH-814: Planning, Design, and Construction Administration Guidelines for Architects and Engineers.
1. For purpose of this project, any reference to Architect and Engineers shall equate to the Design-Build Contractor.
For purpose of this project, any reference to Architect and Engineers shall equate to the Design-Build Contractor.
Job Corps publication JCH-814, "Planning, Design, and Construction Administration Guidelines for Architects and Engineers," is a companion document to this scope of work. It presents the design-build contractor additional design criteria not specifically stated in the scope of work. Where conflicts occur between the requirements of the scope of work and JCH-814, the requirements of the scope of work shall take precedence.
C-6
2. Equipment Manual
The design-build contractor will be provided with a copy of the “Prototype Design Guidelines – Administration and Education.” The design-build contractor and its consultants shall use this manual as a guide and coordinate with the ESC to determine the actual equipment required.
3. TAG J: Health and Wellness Facilities Guidelines -“NOT APPLICABLE”
C. OTHER STANDARDS
1. Life Cycle Cost (LCC) Analyses–NOT APPLICABLE
2. Energy Conservation - NOT APPLICABLE
3. Environmentally Preferable Products
The design-build contractor shall evaluate options for the use of environmentally preferable products and environmentally preferable building design and shall include a description of recommended options in the design narrative (see JCH-814 for narrative requirements).
4. Asbestos-Containing Materials and PCB Fluorescent Light Ballasts
An asbestos survey of the center’s buildings was conducted in January, 1989. The results of the survey and subsequent lab tests confirm the presence of asbestos-containing materials (ACM) in certain locations of the buildings. A copy of the report will be made available to the design-build contractor.
It is not intended that all asbestos identified in the report be removed. Asbestos containing materials shall only be removed as necessary to complete the rehabilitation work.
Friable ACM shall be abated prior to building demolition. Non-friable ACM shall be abated prior to building demolition only as necessary to comply with the EPA National Emissions Standard for Hazardous Air Pollutants (NESHAP) (40 CFR 61 Subpart M), and applicable State and Local regulations.
All asbestos abatement or PCB ballast removal shall be done by licensed, trained asbestos workers, supervisors, and contractors. An asbestos abatement work plan shall be prepared by a licensed, trained asbestos project designer for submittal. Asbestos abatement work plan shall include the list and location of materials to be abated, methods of abatement, containment setup and location, decontamination procedures, respiratory protection, all worker licenses, training certifications and medical certifications, and disposal plan including transportation and final disposal location. All asbestos work shall be done in accordance with applicable federal, state, and local regulations. The design-build contractor shall provide the services of an independent industrial hygienist or environmental consultant to conduct on-site project monitoring and air monitoring services during asbestos abatement, including laboratory services as needed. The consultant shall:
a. Conduct a field investigation to identify ACM affected by the rehabilitation activities. It is not intended that the ACM previously identified will be retested. However, suspect ACM not previously identified should be sampled to determine asbestos-content.
b. Conduct a field investigation for PCB fluorescent light ballasts for light fixtures impacted by this project only. The consultant shall not sample dielectric fluid from ballasts but shall rely on labeling to determine PCB status. Unlabeled ballasts shall be assumed to be PCB-containing.
C-7
Note leaking PCB ballasts for special removal and disposal per 40 CFR 761.
c. Conduct on-site project monitoring and air-monitoring services during asbestos abatement including laboratory services as needed:
a) Baseline air sampling (prior to abatement) with Phase Contrast Microscopy (PCM) laboratory analyses.
b) In-progress air monitoring and sampling with PCM laboratory analyses.
c) Final visual clearance inspections and final clearance air sampling using aggressive air sampling techniques. Sampling shall be conducted in compliance with all applicable Federal, State, and Local requirements.
d) Submit a final abatement report certifying that asbestos abatement work has been completed in accordance with all applicable Federal, State, and Local regulations.
Note: The contractor will pay for all costs for additional sampling and analyses resulting from improper execution of the asbestos removal or final clean up.
D. SPECIFIC INSTRUCTIONS
1. Center Operation
The center shall remain in operation throughout the Construction Phase. The design-build contractor shall, as part of this contract, coordinate with the Engineering Support Contractor and evolve a set of construction documents that will minimize disruption of center operations during construction. Should Phasing of the construction work be required to allow the center to operate in a normal fashion during construction, Phased Plan shall be provided for approval prior to NTP.
2. Design-Build Contractor Responsibilities
An acceptable quality design must provide appropriate functional facilities at the lowest practical construction cost, with due consideration for economy in maintenance and operation.
The specified construction materials must be of quality that is consistent with the intended use of the facility, the center, and reflect local availability and construction skills. Innovative materials and methods should be considered, but only if they provide an economic or functional advantage.
Although this scope of work may identify specific elements of construction, it is the design-build contractor's responsibility to provide any and all elements which are incidental to provide a fully functional facility.
The design-build contractor will also provide minimum ten high quality photographs on digital and paper format to document the renovated facility.
3. Submittal Requirements
a. This project will require the following submittals
(1) The design-build contractor’s technical proposal shall include those items required in Section 7.5.1- Schematic Design Submittal (15%), of the Job Corps Handbook (JCH) 814, dated September 2006. Additionally, the technical proposal shall address the following items in the scope of work:
C-8
a) Provide a basis of design for renovation of Buildings 1, 2, 3, 4 and 20 complete with recommended finishes.
b) Verify the location, types, and capacities of existing utilities, within the limits of construction and as required to provide utility service to the five buildings.
c) Report on electrical infrastructure needs and requirements.
d) Provide a Schedule of Tests and Inspections requirements.
(2) The design-build contractor shall provide 60% Interim Submittal construction documents based on the schedule. The 60% Interim Submittal construction documents submission shall, at a minimum, contain the following:
a) Design narrative (All disciplines)
b) Civil and structural calculations - NOT APPLICABLE
c) Phasing plan
d) Updated quality control plan
e) Drawings (All disciplines)
f) Specifications as applicable (All disciplines)
The 60% Interim Submittal shall meet the requirements of Section 7.5.3 Construction Documents Progress Submittal (60%) of the JCH -814, Planning, Design and Construction Administration Guidelines for Architects and Engineers, dated September 2006.
(3) The design-build contractor shall provide “Construction Ready” documents based on the schedule. The “Construction Ready” documents submission shall, at a minimum, contain the following:
a) Final design narrative (all disciplines)
b) Final civil and structural calculations - NOT APPLICABLE
c) Final quality control plan
d) Drawings (all disciplines)
e) Specifications as applicable (all disciplines)
(4) The final submittal, to include all corrections to the design review comments, shall be submitted 2 weeks after the concurrence letter for the “construction ready” design review has been accepted.
b. Submittals for Review
C-9
For the submissions identified above, the design-build contractor shall submit four (4) sets of drawings and project documents (drawings shall consist of two full-size sets and two half-size sets), as well as three (3) sets of design calculations, at the 60% Interim Submittal and “Construction Ready”stages to the Department of Labor for review and concurrence. One (1) set of drawings at the60% Interim Submittal and “Construction Ready” design stage shall be submitted to the Job Corps Data Center. In addition, one (1) set of drawings and project documents shall be mailed directly by the design-build contractor to the Bamberg Job Corps Center at each submission stage.
Each submittal of drawings shall be incorporated into an AutoCAD (version 2004 or later) compatible electronic format on compact disc and be delivered to DOL by the design-build contractor in addition to the drawing/specification sets required. Complete project specification documents shall also be furnished on a compact disc in electronic format that is Microsoft Word compatible.
The design-build contractor will be responsible for the professional quality, technical accuracy and adherence to the requirements of the scope of work, and for all plan submittals required under this contract. DOL will perform review of the required submissions. The review will be limited to project constructability (e.g. site problems, existing obstructions or proposed utilities, proposed contract time for construction, omissions, discrepancies, known issues that have occurred at the site or with projects of similar scopes, phasing, and coordination problems that could lead to construction difficulties), design (conformance to the negotiated scope of work) and construction quality control procedures.
Unless stated otherwise, review comments and concurrence with the required submissions do not revise the scope or intent of the project and do not constitute a request for change beyond the negotiated scope of work. In the event DOL determines that any required submission is incomplete which precludes a meaningful review, or does not adhere to the scope of work, DOL will advise the design-build contractor of the shortcomings and direct the design-build contractor to revise and resubmit the plan. No time extension will be granted as a result of such action. In the event the design-build contractor believes that any review comment requires a change to the scope of agreed work, the design-build contractor shall first consult the DOL for clarification, and shall, within 10 days of receipt of the comments provide written notice to the Contracting Officer concerning the reasons why the design-build contractor believes the scope has been changed.
Following concurrence with the design documentation at the“Construction Ready” stage(s),the design-build contractor shall prepare plan sets for use during construction. All review comments shall be resolved in writing by the design-build contractor to the satisfaction of the DOL before the design-build contractor submits the final construction plans. Each plan sheet shall have its last revised date noted on the sheet and clearly marked “Approved for Construction”
c. In addition to the review, coordination and specification of interior building finishes, and an interior finishes/colors submittal is required.
4. Building Design
a. The design-build contractor must be familiar with Bamberg, South Carolina and local construction methods and building materials, and shall provide a design that exemplifies the optimum balance of economy, aesthetics, safety, ease of maintenance and speed of construction.
5. Equipment
C-10
The design-build contractor shall clearly differentiate equipment that is a part of the design-build contractor's responsibility from equipment that is the Government's responsibility.
In general, only "fixed" equipment will be part of the contract. The Department of Labor will provide the "movable" equipment. The responsibility for the procurement of equipment is discussed in the individual section for each building type in JCH-814 Chapter 4.
6. Optional Provisions
The design-buildcontractor’s responsibilities shall include interface activities with any, and all, local utility or service providers (i.e. water, electric, gas, fire alarm, etc). The purpose is not for obtaining permits but for informational purposes (design sizing and cost estimates) only. The design-build contractor shall:
a. Submit the required drawings and specifications to the local utility once written authorization has been given from the Department of Labor prior to communications with the State of South Carolina, Bamberg County, the Bamberg Board of Public Works Commission, and the City of Bamberg, Water Gas and Light.
b. Obtain written approval of the interface design, from the utility.
c. It will be required that the design-build contractor have a valid State of South Carolina contractor’s license to perform the work of the project. It is also anticipated that the design-build contractor will need to comply with code requirements for the design and construction requirements of the State of South Carolina, Bamberg County, the Bamberg Board of Public Works Water, Gas and Light Commission, and the City of Bamberg, Water Gas and Light.
Written authorization is required from the Department of Labor prior to communications with State of South Carolina, Bamberg County, the Bamberg Board of Public Works Commission, and the City of Bamberg, Water Gas and Light.
7. Design Meetings
In addition to those meetings noted above the design-build contractor should plan for a total of three
(3) meeting days with the Department of Labor and/or its representatives during the course of the design phase of the work. These meetings will be held either in the design-build contractor’s offices or at the site. The labor and travel cost for these meetings shall be included as part of the design-build contractor’s proposal.
A DOL ESC representative will visit the site once a month. During this visit, the design-build contractor’s payment application will be certified by the DOL ESC. In preparation for the monthly meeting, the design-build contractor shall prepare a monthly construction progress report. The reports shall include an updated CPM schedule, a minimum of 10 electronic photos of all aspects of the project and a list of open issues.
8. Site Visits - Construction Observation
NOT APPLICABLE
9. Contract Document Reproduction
Six (6) sets of the “Approved For Construction” documents and drawings, sealed and dated by the appropriate professionals, shall be reproduced for DOL use. In addition, one (1) set of the “Approved
C-11
For Construction” documents and drawings shall be mailed by the design-build contractor to the Bamberg Job Corps Center.
10. Availability of Existing Documents
Site verification of the existing conditions is required. The design-build contractor will be responsible for verification of all the dimensions and existing system types and conditions.
III. EXTENT OF WORK
A. SITE IMPROVEMENTS AND UTILITIES
1. Design Objectives - NOT APPLICABLE
2. Site Improvements - NOT APPLICABLE
3. Site Utilities - NOT APPLICABLE
B. GENERAL BUILDING DESIGN REQUIREMENTS
1. Architectural
a. General:
The work includes services for the design and construction of approximately 15,400 SF of extensive renovation in three existing buildings at the Bamberg Job Corps Center. The work includes services for the design and construction to renovate the interior of Building 1 for soft vocations and non-academic functions, the interior of Building 2 for bathroom renovations, the interior of Building 3 for Administration functions, and the interior of Building 20 to consolidate hard vocations and to expand Culinary Arts at the Center.
b. Gymnasium/Administration–Building No. 1 and 4 Provide design and construction services to renovate the existing gymnasium of approximately 8,000 S.F. to accommodate educational functions, including a Business Office Technology Classroom (1,000 S.F.), a Computer Services Technology Classroom (1,000 S.F.), a Social Development Classrooms (400 S.F.), a Non Academic Classroom (460 S.F.), Administration (400 S.F.), and storage.
Provide design and construction services to renovate the existing administration area to accommodate educational functions, including a Career Development Center (CDC) (450 S.F.), Career Preparations Program (CPP) (400 S.F.), Center Standards Incentive Department (CSID) (450 S.F.), Testing Classroom (775S.F.), Technology Classroom (1,000 S.F.), and Computer Services Technology Classroom (1,000 S.F.).
Design and construct a structure to connect the Gymnasium Building (Building No. 1) to the Administration/Finance Building (Building No. 4). The connection must provide a clear passage corridor between the two buildings. The design shall include an ADA compliant ramp from the Gymnasium Building to account for the elevation changes between the two buildings and the Administration/Finance Building shall be modified so that the corridor can connect.
C-12
The interior and exterior finishes for the connector building shall match the finishes for the adjacent buildings.
Provide foundations as required to support the new structure, and conditioned space as required for heating and cooling.
Provide temporary structural support of walls and the roof when the exterior walls are open for construction.
Provide design and construction services to renovate Building No. 4, to provide a corridor for the connector serving the two buildings. Relocate existing equipment as required.
Provide design and construction services to renovate the existing west wing for Counseling (420 SF) respectively.
Repair/replace/modify the existing fire alarm to comply with the current codes and to reflect the new work being performed. Provide new devices throughout to comply with NFPA and all applicable codes.
The following work includes, but is not limited to:
Remove the existing floor finishes throughout and repair all floors in Building 1. Repair the existing sub-floor as required and in accordance with the commercial grade vinyl floor tile manufacturers recommendations to receive new commercial grade vinyl composition tile.
After all partitions are removed fill all uneven sub-floor surfaces with plywood or other wood materials to create level sub-floors. Install one sheet of ¼ inch plywood underlayment over floors after all leveling of the existing subfloors is completed before installing new commercial grade composition tile.
Install new 4” high vinyl base at all new and existing walls.
Install all new one hour Underwriters Laboratories fire rated walls from floor to existing ceiling with 3-5/8” or 6” steel studs (as required) and 5/8” fire code drywall each side.
Coordinate all finish work with new electrical, new plumbing, and new mechanical work.
Install new 5/8” drywall on existing exterior walls. Provide new insulation in the exterior walls complete with a vapor barrier. Provide 3 ½’ fiberglass batt insulation in the 4” exterior walls and 6” fiberglass batt insulation in 6” exterior walls.
Install new UL fire labeled solid core wood doors, hollow welded metal steel frames, and fire labeled door hardware where required for a fire rated assembly,.
Install a new 2 foot by 4 foot suspended acoustical tile ceiling 10’-0” A.F.F. throughout the building with integral ceiling light fixtures, mechanical supplies and returns as needed.
The height of the ceiling in the old Gymnasium must take into account the head of the existing windows and the fixed transom must be retained to provide natural sun light into the space. The ceiling in the remainder of the space can be lowered to a height of 10’-0” A.F.F.
Design and provide an HVAC system that will heat and cool the structure to the required heating and cooling limits for the climate area of the center. The design should take into consideration the use of the existing heating and cooling systems in place.
C-13
c. Education and Training–Building No. 2 Provide design and construction services to reconfigure, remove, and re-construct the existing toilet rooms and the adjacent, unused mechanical room to create a new male and female ADA compliant toilets (approximately 400 S.F. each) and a new electrical closet, accessed from the main corridor (approximately 24 SF). The toilet rooms shall include the following:
Provide floor mounted, wall braced moisture resistant phenolic toilet partitions and urinal…