AMENDMENT NUMBER 0002 IS EXTENDED FROM MARCH 26 2010 2 00PM edt TO APRIL 2 2010 2 00pm edt. THIS AMENDMENT ALSO INCORPORATES QUESTIONS AND ANSWERS AND ADDITIONAL ATTACHMENTS
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Labor OASAM Office of Procurement Services Suite N-4308 200 Constitution Avenue Washington, DC 20210
X
CINCINNATI JOB CORPS CENTER: ASBESTOS ABATEMENT, MODIFICATION, AND ALTERATION OF STEAM HEATING
SYSTEM, AND WINDOW REPLACEMENT.
Solicitation Number DOL110RP20890 for asbestos abatement, modification, and alterations of steam heating system, and window replacement at the Cincinnati Job Corps Center is amended as follows:
1. Extend the Response date from March 26, 2010 2:00pm edt to April 2, 2010 2:00pm edt.
2. Incorporate Questions and Clarifications
3. Incorporate Drawings
4. Incorporate asbestos survey and abatement record.
5. Incorporate the Pre-Bid Sign-In Sheet.
EXCEPT AS STATED ABOVE ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
5. PROJECT NO.
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NO.
CODE
6. ISSUED BY 1605
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED
1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment of each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 10-83)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30STANDARD FORM 30
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(No., street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(If applicable)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
(X)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
3-23-10
TO ALL OFFERORS/BIDDERS DOL110RP20890
X
2-26-2010
Solicitation Number DOL110RPB20890 Page 2 of 2 Amendment Number 0002
MULTIPLE DEFICIENCIES
CINCINNATI JOB CORPS CENTER
CINCINNATI, OH
The response date for submissions is hereby extended from March 26, 2010 2:00pm edt to April 2, 2010 2:00pm edt.
Clarifications and Responses to Questions
1. QUESTION: Are there existing Blue Prints for this facility?
Response: Existing blueprints of the facility are not available. AutoCad floor plans will be made available to the successful Proposer.
2. QUESTION: There has been plaster removed and replaced by drywall and some replaced with plaster. What determines which material is to be used?
Response: Plaster that is removed shall be replaced with plaster to match adjacent existing finishes.
3. QUESTION: At what percentage of capacity are the dorm rooms at present time?
Response: The Center is currently at full capacity.
4. QUESTION: Is the budget accurate for this project?
Response: The anticipated budget range for this project is as stated in the Solicitation.
5. QUESTION: If prices for this project exceeds projected budget what happens?
Response: Solicitation Sections L and M define the procedure for the award of this project. Both the technical proposal and price proposals will be reviewed by the Contracting Officer and/or her designated representatives to evaluate proposals that are in the best interest of the Government.
6. QUESTION: Who will be responsible for the removal of the furniture in the dorms and anywhere else that is necessary?
Response: The Center staff will be removing and relocating furniture in the dorms and in areas impacted by the work.
Supplemental Drawings
1. The Center has furnished the attached Asbestos Survey information for reference only. The Proposer shall remain responsible for preparing a current hazardous materials abatement report as part of the proposal
END OF AMENDMENT