- AMERICAN RECOVERY AND REINVESTMENT ACT - Atterbury Job Corps Center -Edinburgh, IN - General Construction
- Solicitation number
- DOL099RP20763-AtterburyJobCorpsCenter
About this file
Amendment Number 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment Number 0001 9-15-09.pdf | ||
| JCH814September2006.pdf | ||
| RFP DOL099RP20763 - Atterbury Job Corps Center.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X
Solicitation Number DOL099RP20763 for the repair and replacement of roofs as well as interior/exterior doors and frames, replacement of water heaters, storage tanks; the installation replacement and repair of HVAC equipment; the installation of new windows and the demolition of existing partitions and walls, as well as the construction of new partitions and walls.
a. The attached changes to the Contract Provisions, Scope of Work and questions and answers are hereby incorporated into this FBO Notice.
EXCEPT AS STATED ABOVE ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
5. PROJECT NO.
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NO.
CODE
6. ISSUED BY 1605
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED
1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended, X
(a) By completing Items 8 and 15, and returning ____1______ copies of the amendment; (b) By acknowledging receipt of this amendment of each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 10-83)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30STANDARD FORM 30
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(No., street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(If applicable)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
(X)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
9-16-09
OASAM Office of Procurement Services U.S. Department of Labor Suite N-4308 200 Constitution Avenue, NW Washington, DC 20210
TO ALL OFFERORS/BIDDERS X DOL099RP20763
8-19-09
Solicitation Number DOL099RP20763 Page 2 of 4 Amendment Number 0002
ROOF, HVAC, AND WATER HEATER REPAIRS
ATTERBURY JOB CORPS CENTER
EDINBURG, IN
Form 1442, Block 11
The Contractor shall begin performance within 10 calendar days and complete it within 322 calendar days after receiving NTP.
I. I. EXTENT OF WORK
A. A. SITE IMPROVEMENTS AND UTILITIES
1. 1. Design Objectives The work involves providing design/build services for various improvements in numerous existing buildings at the Atterbury Job Corps Center. The work will include but not be limited to ACM remediation, demolition, interior renovations and build-outs, installation of associated HVAC systems, electrical power and lighting systems, plumbing systems, roofing replacement; flooring finishes and doors/frames replacements. The work is divided in to several parts as described below:
Design services to develop construction drawings and specifications from conceptual to final design for the demolition and new renovation work of the spaces.
a. To facilitate but not overly burden the security control, carefully plan siting of staging areas required to support construction of the buildings so that students’ activities will be unaffected
b. The entire design should not adversely impact the relatively quiet and peaceful environment. Any trees and vegetation should be preserved as much as possible to retain a natural buffer that is presently there.
c. To a maximum extent feasible, maintain or restore the predevelopment hydrology of the site with regards to temperature, rate, and duration of flow.
Building 1025
In the utilities room, provide heat trace wiring controlled by a line voltage thermostat and insulate water pipes with fiberglass insulation. Energize from nearest available electrical source using in accordance with NEC.
Solicitation Number DOL099RP20763 Page 3 of 4
ROOF, HVAC, AND WATER HEATER REPAIRS
ATTERBURY JOB CORPS CENTER
EDINBURG, IN
Building 1038
For each of the five furnaces located in the attic, install a water level detection device conforming to UL 508 that will shut off the equipment in the event that the primary drain is blocked.
Building 1039
For each of the eight furnaces located in the attic, install a water level detection device conforming to UL 508 that will shut off the equipment in the event that the primary drain is blocked.
Building 1040
Replace the furnace and outdoor condensing unit. Provide a gas-fired furnace with 165 MBH gross input heating capacity and an air conditioning capacity of 48 MBH total cooling capacity. Select equipment that meets Energy Star requirements and uses a non-ozone depleting refrigerant. Modify the existing ductwork, controls, gas supply, electric power supply, and service disconnect as required by manufacturer recommendations.
Building 1086
Replace the three rooftop units. Provide two 120 MBH total cooling capacity and 200 MBH gross input heating capacity packaged units and one 36 MBH total cooling capacity and 80 MBH gross input heating capacity packaged unit, all with gas heat and DX cooling. Select equipment that meets Energy Star requirements applicable at the time of purchase and uses a non-ozone depleting refrigerant. Modify existing ductwork, controls, gas supply, electric power supply, service disconnects, roof curbs, and maintenance platforms.
Replace the two existing main entry metal doors and frames with new 3' x 7' metal doors, metal frames and panic hardware.
Replace the existing metal doors at the north and south wall of lobby with new 3' x 7' metal door and metal frames. Re-use existing panic hardware. (2 each)
Solicitation Number DOL099RP20763 Page 4 of 4
ROOF, HVAC, AND WATER HEATER REPAIRS
ATTERBURY JOB CORPS CENTER
EDINBURG, IN
Building 1087
Provide one 90 MBH total cooling capacity and 150 MBH gross input heating capacity packaged unit and two split systems each rated 60 MBH total cooling capacity and 120 MBH gross input heating capacity, all with gas heat and DX cooling. Select equipment that meets Energy Star requirements and uses a non-ozone depleting refrigerant. Modify existing ductwork, controls, gas supply, electric power supply, and service disconnects as required by manufacturer recommendations.
Remove existing waterproofing system and clean around the roof-top equipment areas (13 units). Install isocratic roof insulation board to match roof rib and overlay area with dens-deck roof cover board. Install white color 0.060 EPDM.