NGWSP_Industry_Day_Slides_2APR25_2.pdf
PDF 14 MB Posted
- Attached to
- Navajo Gallup Water Supply Project (NGWSP)
- Solicitation number
- DOIRFBO250011
About this file
These are presentation slides for the Navajo-Gallup Water Supply Project (NGWSP) Industry Day event held on April 2, 2025. The slides provide a comprehensive overview of a major water infrastructure project aimed at delivering water to communities in the Navajo Nation and surrounding areas in New Mexico. Key project components include multiple water intake and pumping facilities, pipelines spanning approximately 12 miles, and infrastructure to support water distribution, such as reservoirs, tanks, and regulatory systems. The project is being developed through collaboration between multiple entities, including the Bureau of Reclamation, Navajo Nation, and local water authorities. The estimated total construction cost is approximately $2.2 billion, with funding sources including federal appropriations and tribal resources. The project timeline indicates phased construction from 2025 to 2030, with various segments like the Reach 1 Bypass Tank, Block 2-3 Pipeline, and multiple pumping plants scheduled for different completion dates. The presentation also highlights the project's significance in addressing water access and infrastructure needs for Native American communities in the region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .