Sol_DOIASAM270007_Amd_0001.pdf
PDF 281 KB Posted
- Attached to
- CCTV System Design A/E Services Great Plains
- Solicitation number
- DOIASAM270007
About this file
This document is Solicitation Amendment 0001 to federal contract DOIASAM270007, issued by the Bureau of Indian Affairs (BIA) Central office in Reston, Virginia on November 3, 2026. The amendment publishes Questions and Answers related to the solicitation and does not extend the solicitation close date, which remains December 3, 2026.
The underlying solicitation concerns CCTV Design for Standing Rock & Fort Totten Agency (A/E), specifically replacement of low-voltage CCTV and intercom systems at Fort Totten Building 106 and Standing Rock Building 900237. The Questions and Answers clarify that design documents must be prepared by or under the direct supervision of architects and/or engineers licensed in North Dakota, with final construction drawings and specifications signed and sealed by a licensed North Dakota professional. Physical security design credentials (CPP, CSPM) are insufficient to satisfy licensing requirements, though security specialists may prepare supporting design information under licensed professional supervision. The amendment confirms that Task 2 (asbestos and lead sampling, testing, and remediation), Task 3 (charrette with multiple engineering disciplines), and Task 8 (comprehensive plans across multiple disciplines) are required components. Additionally, only registered architects and engineers are permitted to conduct construction-phase site visits. Physical security design credentials and CCTV design experience will not be credited under evaluation criterion (a), which scores professional engineer registrations and multi-discipline professional engineer registrations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_DOIASAM270007.pdf | ||
| SOW-Standing_Rock_Agency.pdf | ||
| SOW-Fort_Totten_Agency.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Jessica Kidd
See continuation page
BIA CENTRAL 00016
12201 Sunrise Valley Drive Contracting Office Mail Stop-244 Reston VA 20192
A16
DOIASAM270007
11/03/2026
11/03/2026
1 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
DOIASAM270007/0001
The purpose of Solicitation Amendment 0001 is to publish the Question(s) and Answer(s).
The Solicitation Close Date remains December 3, 2026.
DOIASAM270007 CCTV Design for Standing Rock & Fort Totten Agency (A/E) Questions and Answers
1. Both SOWs state, "All design phase work will be completed by or under the direct supervision of architects and/or engineers licensed in the State of North Dakota."
The scope is replacement of the low-voltage CCTV and intercom systems at Fort Totten Building 106 and Standing Rock Building 900237. Will the Government accept design documents prepared by a physical security design firm whose staff hold security design credentials (CPP, CSPM), without supervision by a North Dakota licensed architect or engineer? If a seal is still required, which drawings or specification sections need it?
No, Under the SOW, design documents prepared by a physical security design firm whose staff hold CPP, CSPM, or similar security credentials would not satisfy the requirement of an architect or engineer licensed in the State of North Dakota. Final construction drawings and specifications shall be signed and sealed by a North Dakota licensed architect or engineer. Security specialists may prepare supporting design information under the responsible charge of the licensed professional.
2. Several SOW requirements read as building construction requirements:
Do these apply to this CCTV and intercom replacement, or can they be marked "NOT USED" as Tasks 5 and 6 are?
• Task 3 charrette with the "mechanical engineer, electrical engineer, fire protection engineer, and architect";
Task 3 is needed; it is good engineering to develop two rough draft schemes as to which option is the most cost effective for the government. The disciplines are included to ensure the design team has access to all professional disciplines that may be required to fully evaluate existing conditions and develop a complete design.
• Task 8's "architectural, landscape architectural, civil/survey, mechanical, structural, electrical plans";
Task 8, the disciplines are included to ensure the design team has access to all professional disciplines that may be required to fully evaluate existing conditions and develop a complete design.
• Task 2's asbestos and lead "sampling, testing, and remediation" Task 2, yes, it is needed.
• The requirement is that "Only registered architects and engineers" make the construction-phase site visits.
Yes, this is required.
3. Evaluation criterion (a) scores "professional engineer registrations, multi-discipline professional engineer registrations." Will physical security design credentials and CCTV design experience be credited under this criterion?
No, Under the SOW, design documents prepared by a physical security design firm whose staff hold CPP, CSPM, or similar security credentials would not satisfy the requirement of an architect or engineer licensed in the State of North Dakota. Final construction drawings and specifications shall be signed and sealed by a North Dakota licensed architect or engineer. Security specialists may prepare supporting design information under the responsible charge of the licensed professional.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .