This Notice to Contractors is issued by the California Department of Water Resources for physical security upgrades at three San Joaquin Field Division facilities. The project encompasses security enhancements at the Operations and Maintenance (O&M) Center, Chrisman Pumping Plant, and Edmonston Pumping Plant, with work including impact-rated gates, bollards, fencing with barbed wire, security camera poles, prefabricated guard shacks with HVAC systems, reinforced concrete equipment pads, security hardening of doors and windows, electrical and gas line installations, and site work including demolition, earthwork, asphalt paving, concrete liners, and traffic striping. Sealed bids will be received at Pearblossom Project Headquarters, 34534 116th Street East, Pearblossom, California 93553, until 11:00 A.M. on Thursday, February 19, 2026, with a public bid opening to follow at an announced location and via webinar. A mandatory site inspection trip will be conducted as detailed in Document 00003. Prospective bidders must be prequalified by the Department and possess California contractor license classifications A and HAZ, or A with a HAZ subcontractor. Questions and requests for clarification must be submitted to doe_specs@water.ca.gov at least five days before bid opening, and brand and trade name alternatives must be submitted no later than 14 days prior to bid opening.
The estimated project cost is between $9,000,000 and $12,500,000. A Disabled Veteran Business Enterprise (DVBE) incentive will be applied during bid evaluation, and the Department has established a 25 percent Small Business Enterprise (SBE) participation goal. Bidders are encouraged to obtain Small Business and DVBE certifications through the California Department of General Services website. Prevailing wage rate determinations are on file and available for inspection at the Department of Water Resources Traditional Delivery Section office in Sacramento or online. The successful bidder will be required to comply with Department of Industrial Relations registration and prevailing wage monitoring requirements as outlined in Document 00703. A nondisclosure agreement must be signed to obtain access to contract documents, and interested parties should register as plan holders or bidders by contacting doe_specs@water.ca.gov. The Department will permit substitution of securities for moneys withheld in accordance with Public Contract Code section 10263.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24-07_Non-Disclosure_Agreement_(General).pdf | ||
| Document_00003_Notice_of_Inspection_Trip.pdf | ||
| Safety_Prequal_February_2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notice to Contractors
00002-1 K-24
DOCUMENT 00002
NOTICE TO CONTRACTORS
STATE OF CALIFORNIA
CALIFORNIA NATURAL RESOURCES AGENCY
DEPARTMENT OF WATER RESOURCES
Sealed bids for
PHYSICAL SECURITY UPGRADES (SOUTH) – SJFD – PHASE I
SAN JOAQUIN FIELD DIVISION O&M CENTER,
CHRISMAN PUMPING PLANT, EDMONSTON PUMPING PLANT
STATE WATER FACILITIES
CALIFORNIA AQUEDUCT
KERN COUNTY
CALIFORNIA
SPECIFICATION NO. 24-07
CONTRACT NO. C51668
will be received by the Department of Water Resources at Pearblossom Project Headquarters, 34534 116th Street East, Pearblossom, California 93553, between 9:00 A.M. and not later than 11:00 A.M. on THURSDAY, FEBRUARY 19, 2026. A public bid opening will be conducted live at an announced location in the vicinity of such office and via webinar.
NOTE: The Pearblossom Pumping Plant is a gated facility. Prospective bidders are advised to arrive early to allow sufficient time for checking in with Security at the gate. Prospective bidders will be directed to proceed to Building “A” where the bid opening will take place.
Bid forms for this work are provided in a separate booklet titled BID FORM.
Bids will be considered only if submitted for all the work required for the above project.
00002-2 K-24
The work is defined in Section 01110 – Summary of Work, and includes but is not limited to the following principal features:
1. San Joaquin Field Division Operation & Maintenance (O&M) Center:
a. Fencing: chain link with barbed wire.
b. Impact rated gate (cantilevered sliding type) with automatic gate operator systems.
c. Bollards (impact rated and standard).
d. Reinforced concrete equipment pad.
e. A precast reinforced concrete box culvert with cast-in-place headwalls at each end.
f. A prefabricated guard shack furnished with office and restroom facilities, including:
1) Slab-on-grade.
2) Guard shack.
3) Heating, ventilation, and air conditioning (HVAC) system.
4) Interior lighting, power, data and communication system connectivity.
5) Water connections.
6) Sewer pump system and connections.
g. Security camera pole with cast-in-drilled-hole foundation.
h. Trenching and constructing electrical conduits as shown.
i. Gas line installation.
j. Site work:
1) Demolition of existing facilities.
2) Earthwork.
3) Concrete liner installation.
4) Concreted rock slope protection placement.
00002-3 K-24
5) Aggregate base and hot mix asphalt pavement.
6) Concrete curb installation.
7) Metal beam guardrail replacement.
8) Chain link fence replacement.
9) Traffic striping and signage.
2. Chrisman Pumping Plant:
a. Impact rated gates (swing type) with and without automatic gate operator systems.
b. Bollards (standard).
c. Reinforced concrete equipment pads.
d. Security hardening of doors and windows.
e. Trenching and constructing electrical conduits as shown.
f. Site work:
1) Demolition of existing facilities.
2) Earthwork.
3) Aggregate base and hot mix asphalt pavement.
4) Metal beam guardrail replacement.
5) Traffic striping and signage.
3. Edmonston Pumping Plant:
a. Fencing: chain link with barbed wire.
b. Impact rated gates (swing and cantilevered sliding type) with and without automatic gate operator systems.
c. Manual personnel gates.
d. Bollards (standard).
e. Reinforced concrete equipment pads.
f. Security camera pole with cast-in-drilled-hole foundation.
00002-4 K-24
g. Security hardening of doors and windows.
h. Trenching and constructing electrical conduits as shown.
i. Site work:
1) Demolition of existing facilities.
2) Earthwork.
3) Aggregate base and hot mix asphalt pavement.
4) Metal beam guardrail replacement.
5) Chain link fence replacement.
6) Traffic striping and signage.
7) Type K railings.
Quantities of work, materials, and equipment required for completion of the work are specified in Document 00410 – Bid Schedule.
1. LICENSING
Bidders shall be licensed for the work as required by the Business and Professions Code. Contractor’s license classification(s) for this work: A and HAZ, or A with HAZ subcontractor.
2. BIDDING
Submit requests for drawings and specifications for the project by e-mail to doe_specs@water.ca.gov.
Submit questions or requests for clarification by email to doe_specs@water.ca.gov. at least 5 days before the scheduled opening of bids. Responses, if appropriate, will be sent to all prospective bidders.
3. PREQUALIFICATION
All bidders shall be prequalified by the Department. Bid forms will be furnished only to prequalified bidders who meet the requirements of the State Contract Act and Document 00040 – Prequalification.
4. SITE INSPECTION TRIP
An inspection trip for prospective bidders will be conducted at the work site, as per Document 00003 – Notice of Inspection Trip.
mailto:doe_specs@water.ca.gov file://///doe-file/co/CSB/DOE-CDS/Specs/Current_specs/K-24%20(24-07%20Phys%20Security-%20San%20Joaquin%20Field%20Division)/1%20Transitional/doe_specs@water.ca.gov
00002-5 K-24
5. DVBE AND SMALL BUSINESS PARTICIPATION
Participation by Disabled Veteran Business Enterprises (DVBE) and qualification for Small Business Preference shall be as provided by Document 00206 – Instructions for DVBE Goal and Incentive and Document 00201 – Instructions for Small Business Preference. A DVBE incentive will be applied during bid evaluation in accordance with Document 00206, Paragraph 2 – DVBE Incentive.
In addition, the Department has set a 25 percent Small Business Enterprise (SBE) participation goal in its contracting and is tracking Small Business participation in its contracts. The Department encourages bidders to explore certification as a Small Business and/or Disabled Veteran Business Enterprise and to utilize certified Small Business and Disabled Veteran Business Enterprises during the contract term.
The Department of General Services, Procurement Division, Office of Small Business and DVBE Services:
Certification information:
https://caleprocure.ca.gov/pages/sbdvbe-index.aspx
Database of certified SB/DVBE Firms:
https://caleprocure.ca.gov/pages/PublicSearch/supplier-search.aspx
6. PREBID BRAND AND TRADE NAME REQUESTS
Pursuant to Public Contract Code section 10129, alternatives to a designated material, product, thing, or service by specific brand or trade name that are of equal quality and of required characteristics for the purpose intended may be proposed during the bidding period, provided the bidder complies with the following:
A. Proposals for alternatives to a designated material, product, thing, or service, requested during the bidding period, shall be submitted to the Department via email to doe_specs@water.ca.gov, not later than 14 days prior to the date and time of the bid opening.
B. Proposals shall be accompanied by complete information and descriptive data necessary to determine equality of the material, product, thing or service. Samples shall be provided when requested by the Department. Burden of proof as to availability, comparative quality, suitability, and performance of the material, product, thing, or service shall be upon the bidder. The Department will be the sole judge as to https://caleprocure.ca.gov/pages/sbdvbe-index.aspx https://caleprocure.ca.gov/pages/PublicSearch/supplier-search.aspx https://caleprocure.ca.gov/pages/PublicSearch/supplier-search.aspx doe_specs@water.ca.gov
00002-6 K-24 such matters. If the proposal is accepted, bidders will be notified by information letter or addenda.
C. Refer to Document 00706 – Control of Work, Paragraph 5, for substitution requests after issuance of Notice to Begin Work.
7. SUBSTITUTION OF SECURITIES
Pursuant to Public Contract Code section 10263, the successful bidder will be permitted to substitute securities for any moneys withheld by the Department as provided by Public Contract Code section 10261.
8. DEPARTMENT OF INDUSTRIAL RELATIONS REGISTRATION AND
PREVAILING WAGE MONITORING AND ENFORCEMENT
A. Department of Industrial Relations (DIR) registration and prevailing wage monitoring and enforcement shall comply with Document 00703 – Compliance with Applicable Laws and Regulations.
B. Prevailing Wage Rate Determinations rates are on file for inspection at the office of the Department of Water Resources, Traditional Delivery Section, 715 P Street, Room 4-407, Sacramento, California 95814 and posted on the website listed on Document 00300 – Information Available.
KARLA A. NEMETH
Director of Water Resources
Dated: January 16, 2026 (Advertisement)