Attachment_04_(PN01).doc
DOC document 26 KB Posted
- Attached to
- Infrastructure, Design, Engineering, Architecture, and Integration, (IDEAI-2) Full and Open Federal contract opportunity
- Solicitation number
- DOC52PAPT1300015
About this file
Attachment 4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP_DOC52PAPT1300015_Amendment_1.pdf | ||
| Attachment_05_(GD17).doc | DOC document | |
| Attachment_12_(Termination_Worksheet).doc | DOC document | |
| Attachment_13_(Experience_Reference_Worksheet).doc | DOC document | |
| Attachment_01_(FN01).doc | DOC document | |
| Attachment_06_(TM02).doc | DOC document | |
| Attachment_03_(GD16).doc | DOC document | |
| Attachment_10_Contract_Actuals_Templates.xls | XLS spreadsheet | |
| Attachment_02_(FN07).doc | DOC document | |
| Attachment_11_(Labor_Categories)_full_and_open.xls | XLS spreadsheet | |
| RFP_DOC52PAPT1300015_IDEAI2_Unrestricted.pdf | ||
| Attachment_07_(Document_Receipt).doc | DOC document | |
| Attachment_09_(Invoices).xls | XLS spreadsheet | |
| Attachment_08_(Weekly_Funding_Analysis).doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOC52PAPT1300015
Attachment 4
PN01
CONTRACT DELIVERABLE DESCRIPTION
Deliverable Number:
PN01
Title/Description:
Problem Notification Letter
Frequency of Submission:
As Required Number of Copies:
First Submission Due:
Twenty four (24) hours after problem identification
Subsequent Submissions Due:
N/A
Government Acceptance Required:
No
Government Response Due:
No
Remarks:
Verbal notification shall be made during normal work hours or at the beginning of the next Government work day. Verbal notification shall be followed by a written Problem Notification Letter.
Format/Content Requirements and Instructions:
The Problem Notification Letter shall include, as a minimum:
1.
The nature of the problem.
2.
How or why the problem occurred.
3.
The steps being taken to correct the problem.
4.
The consequences of the problem.
5.
Actions to prevent similar occurrences.
File details come from the government source that posted it. Updated .