DNTS SIR Sect F.pdf
PDF 184 KB Posted
- Attached to
- Screening Information Request (SIR) Dedicated Network Telecommunications System (DNTS) Federal contract opportunity
- Solicitation number
- 693KA8-24-R-00007
About this file
This document outlines the delivery and performance requirements for a federal contract solicitation for a Dedicated Network Telecommunications System (DNTS). The solicitation is for a base period of three years plus seven additional option periods, with a period of performance from contract award through 120 months. Key requirements include delivery of operational test equipment within 120 days of order and production equipment within 120 days of an in-service decision targeted between 18-24 months. The contractor must also provide equipment repairs under warranty and time and materials support services as specified in task orders. Data items defined in the Contract Data Requirements List must be delivered per the schedule in the attachment. Meetings and events will take place at the contractor's facility or as directed. The solicitation was issued by the Department of Transportation Federal Aviation Administration Headquarters as number 693KA8-24-R-00007 for a DNTS.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dedicated Network Telecommunications System (DNTS) SIR # 693KA8-24-R-00007
F-1
PART I – SECTION F
DELIVERIES OR PERFORMANCE
TABLE OF CONTENTS
F.1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE
F.2 FULL TEXT CLAUSES AND PROVISIONS
F.3 PERIOD OF PERFORMANCE
F.4 SCHEDULE AND DELIVERY TIMEFRAMES
F.4.1 Projected Milestone Timeframes
F.4.2 Delivery Timeframes
F.5 PLACE OF DELIVERY
F.6 CONTRACTOR REQUEST FOR SHIPPING INSTRUCTIONS
F-2
PART I – SECTION F
DELIVERIES OR PERFORMANCE
F.1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE
AMS 3.1-1 Clauses and Provisions Incorporated by Reference (July 2019)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via the Internet at: https://fast.faa.gov/contractclauses.cfm.
Clause # Clause Title
3.10.1-9 Stop-Work Order (October 1996)
3.10.1-24 Notice of Delay (March 2009)
3.11-34 F.O.B. Destination (April 1999)
3.11-48 F.O.B. Destination - Evidence of Shipment (April 1999)
F.2 FULL TEXT CLAUSES AND PROVISIONS
3.2.2.8-2 Variation in Quantity (October 2019)
(a) A variation in the quantity of any contract item will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) below.
(b) The permissible variation must be limited to: 0_ % increase and 0 % decrease. This permissible variation must be limited to each quantity specified in the delivery schedule.
(End of clause)
3.8.2-22 Substitution or Addition of Personnel (October 2006)
(1) The Contractor must assign only those individuals whose resumes, personnel data, or personnel qualification statements have been submitted and determined by the Contracting
Officer to meet the minimum requirements of the contract. The Contractor must not substitute or add personnel except in accordance with this clause.
https://fast.faa.gov/contractclauses.cfm
F-3
(2) Substitution of Personnel.
(a) For the first 90 calendar days of contract performance, the Contractor must not substitute personnel for the individuals whose resumes or other personal qualification were submitted with its offer and that were determined by the Contracting Officer to be acceptable at the time of contract award, unless such substitutions are because of an individual's sudden illness, death, or termination of employment. In any of these events, the Contractor must promptly notify the Contracting Officer and propose substitute personnel as required by paragraph (4) below.
(b) If an individual becomes, for whatever reason, unavailable for work under the contract for a continuous period exceeding thirty (30) working days, or is expected to devote substantially less effort to the planned work, the Contractor must propose a substitute personnel as required by paragraph (4) below.
(3) Addition of Personnel. If an FAA requirement will increase the specified level of effort for a designated labor category, but not the overall level of effort of the contract, then the Contractor must notify the Contracting Officer to add personnel to the designated labor category. The
Contractor must request added personnel as required by paragraph (4) below.
(4) Request and Review. The Contractor must submit the request for substitute or added personnel in writing to the Contracting Officer at least 15 business days (if a security clearance must be obtained, at least 45 calendar days) before the proposed date of substitution or addition.
The Contractor's request must provide a detailed explanation of the circumstances causing the proposed substitution or addition, a complete resume for the proposed substitute or added personnel, and any additional information required by the Contracting Officer. Proposed substitutes and added personnel must have qualifications equal to or higher than those stated in the contract for the labor category. The Contracting Officer will evaluate the Contractor's request and promptly notify the Contractor of the decision to accept or reject the qualifications of the substitute or added personnel.
(5) The Contracting Officer may terminate the contract if the Contractor has not made suitable, timely, and reasonably forthcoming replacement of personnel who have been reassigned or terminated or otherwise become unavailable to work under the contract or the resulting loss of productive effort would impair the successful completion of the contract. Alternatively, if the
Contracting Officer finds the Contractor to be at fault for the condition, then the Contracting
Officer may equitably adjust (downward) the contract price or fixed fee to compensate the
Government for any delay, loss or damage as a result of the Contractor's action.
(End of clause)
F-4
F.3 PERIOD OF PERFORMANCE
This contract is for a Base Period of three (3) years and seven (7) additional Option Periods.
The Period of Performance (PoP) for the Base Period and Option Periods are as follows:
Contract Period Months after Date of Award (DOA) Calendar Dates
Base Period
(Year 1)
Months 0 through 12 following DOA To be determined (TBD)
Base Period
(Year 2)
Months 13 through 24 following DOA TBD
Base Period
(Year 3)
Months 25 through 36 following DOA TBD
Option Period 1
(Year 4)
Months 37 through 48 following DOA TBD
Option Period 2
(Year 5)
Months 49 through 60 following DOA TBD
Option Period 3
(Year 6)
Months 61 through 72 following DOA TBD
Option Period 4
(Year 7)
Months 73 through 84 following DOA TBD
Option Period 5
(Year 8)
Months 85 through 96 following DOA TBD
Option Period 6
(Year 9)
Months 97 through 108 following DOA TBD
Option Period 7
(Year 10)
Months 109 through 120 following DOA TBD
F.4 SCHEDULE AND DELIVERY TIMEFRAMES
F.4.1 Projected Milestone Timeframes
The Target Milestones Schedule provided in Table F-1 below identifies the Government’s activities and projected timeframes to obtain In-Service Decision (ISD). See Attachment J4 -
DNTS ISD Flow Diagram for the process, activities, and events required to achieve the milestones.
The Contractor must support the Government in achieving the target timeframes to achieve ISD.
Production units are generally ordered only after ISD has been achieved; however, the
Government reserves the right to place orders before or after the dates provided.
Delivery dates in the Contractor’s Integrated Master Schedule (i.e. CDRL-A004) will take precedence after Government review and approval.
F-5
Table F- 1 Contract and Programmatic Milestones
Milestone Timeframe after Contract Award
Post Award Conference (PAC) Not Later Than (NLT) 30 Days
Factory Acceptance Test (FAT) Complete 6 - 12 Months
Field Familiarization Complete 14 - 20 Months
Technical Instruction Books (TIB) Updated 17 - 18 Months
Training Materials Complete and Approved 17 - 18 Months
Operational Test and Evaluation (OT&E) Complete 12 - 20 Months
In-Service Decision (ISD) 18 – 24 Months
F.4.2 Delivery Timeframes
The Contractor must support the delivery schedule for CLINs and CDRLs, as provided in Table
F-2 below. CLINs indicated with an “x” are for each year of the contract unless otherwise specified.
F-6
Table F- 2 Delivery Timeframe Requirements
CLINs Description Contract
Period
Delivery Date
0001 a-h, 0002 a-r
Operational Test Equipment: includes all DNTS Equipment and Miscellaneous
Equipment used for Operational Testing
Base Period only
120 Calendar Days After
Receipt of Order (ARO) x001 a-h, x002 a-r
Production Equipment: includes all
DNTS Equipment and Miscellaneous
Equipment (after In-Service Decision)
Base Period plus all
Option
Periods
120 Calendar Days ARO x004 a-h, x005 a–r
11001 a-h
11002 a-r
Equipment Repairs: includes all DNTS
Equipment and Miscellaneous equipment repairs
Base Period plus all
Option
Periods
As specified in Section H.3
Warranty x011, x012, x013
Contractor Time and Materials
Support Services: includes Labor, Materials, and Travel
Base Period plus all
Option
Periods
As Specified in Task Order x020 through x064
Individual Data Items as specified in in
Contract Attachment J-2, Contract Data
Requirements List (CDRLs)/Data Items
Definitions (DIDs)
Base Period plus all
Option
Periods
The required delivery date is defined in Contract
Attachment J-2, Blocks 10-
14 for each of the CDRLs.
x014 a-j Meetings/Events - Meetings/Events and
Conferences
Base Period plus all
Option
Periods
The required delivery date is defined in Contract Section
C, Statement of Work
F-7
F.5 PLACE OF DELIVERY
Equipment/Software/Peripherals. Unless otherwise directed in the purchase order or by
Contracting Officer (CO) instructions, the Contractor must ship all equipment, peripheral, and software deliveries to the addresses shown in Table F-3 below.
Table F- 3 Delivery Location Requirements
CLINs Description Delivery Location
0001 a - h, 0002 a - r
Operational Test
Equipment: includes all
DNTS Equipment and
Miscellaneous Equipment used for Operational Testing
As specified in order, within the Continental
United States x001 a - h, x002 a - r
Production Equipment:
includes all DNTS
Equipment and
Miscellaneous Equipment
(after In-Service Decision)
Thomas Road F&E Warehouse
6973WD FAA Thomas Road Storage Facility
Mark For: F&E Stock
3601 S. Thomas Road
Oklahoma City, OK 73179-8436 x003 a - h, x004 a – r
11001 a-h
11002 a-r
Equipment Repairs:
includes all DNTS
Equipment and
Miscellaneous equipment repairs
FAA OPS Warehouse
6973FF FAA Aeronautical Center
Mark For: OPS Stock
6500 S. MacArthur Boulevard
Oklahoma City, OK 73169-6901
If directed by the FAA, the Contractor must ship some repairs to the Thomas Road F&E
Warehouse at the address above.
Occasional equipment shipments will be required to other FAA facilities within the Continental
United States (CONUS).
Data Deliverables. All CDRLs must be delivered as specified in Contract Attachment J-2, (CDRLs and DIDs). The DNTS Data Manager (To be provided after Contract Award) must be included in the distribution list for all CDRLs.
Meetings and Events. Factory Acceptance Testing and other DNTS meetings/event must take place at the Contractor’s facility unless otherwise noted in the Statement of Work or order.
F.6 CONTRACTOR REQUEST FOR SHIPPING INSTRUCTIONS
1. At least 60 calendar days before the date the Contractor expects to make shipment of any item (or portion thereof when authorized) the Contractor must send a request for shipping instructions to the Contracting Officer. The Contractor must copy the DNTS COR and
F-8
DNTS Materiel Manager (To be provided after Contract Award) on each request for shipping instructions and include the following information:
a. The expected date of shipment;
b. Contract number and delivery or task order number(s);
c. The Contract Line Item Number(s) involved and quantities of each;
d. The current contract unit price of each contract line item to be shipped;
e. Whether commercial bill of lading forms or Government procedures are desired to be used; and
f. The weight and cube of the shipment and statement of any specialized carriage that may be necessary (e.g., whether padded van or flat bed is needed; if shipment is to be made by air; etc.).
2. The Contracting Officer or the DNTS Materiel Manager will issue shipping instructions on an FAA Form 4500-1, “Project Materiel Shipping Notice / Receiving Report”.
3. FAA Forms 4500-1 will be used by the Program Office, unless the Contracting Officer specifically authorizes otherwise. The Contractor must make no shipment unless and until an FAA Form 4500-1 has been received. Failure of the Contractor to observe these requirements may delay payment.