About this file

This document outlines packaging, handling, storage, and transportation requirements for the Dedicated Network Telecommunications System (DNTS) project under Screening Information Request (SIR) number 693KA8-24-R-00007 from the Department of Transportation Federal Aviation Administration. Items must be individually packaged according to commercial or military packaging standards and labeled with identification markings, barcodes, and hazardous material labels as specified. Successful bidders must support the FAA's barcode asset tracking system by recording unit serial numbers in the required XML format, attaching tracking files to shipments, and integrating with the FAA Life Cycle Asset Tracking System. Components, equipment, and spares must be transported by the most economical means considering dependability, safety, and urgency, with electronic notifications provided to the FAA Contracting Officer and Points of Contact regarding shipments.

View the file

Other files for this federal contract opportunity

Other files attached to Screening Information Request (SIR) Dedicated Network Telecommunications System (DNTS), newest first.
File Type Posted
DNTS Final SIR - Vendor QA 2023-12-22.pdf PDF
DNTS SIR Sect H_Amend 1.pdf PDF
693KA8-24-R-00007_Amend_0001.pdf PDF
DNTS SIR Sect C_Amend 1.pdf PDF
DNTS SIR Sect L Att L2_Amend 1.pdf PDF
DNTS SIR Sect J Att J2_Amend 1.pdf PDF
DNTS SIR Sect L_Amend 1.pdf PDF
Telcordia_PUB43801_ChannelBank.pdf PDF
DNTS SIR Sect M Att M1_Amend 1.pdf PDF
693KA8-24-R-00007.pdf PDF
DNTS SIR Applicable Documents.zip ZIP file
DNTS SIR Sect B.pdf PDF
DNTS SIR Sect J0 - List of Attachment.pdf PDF
DNTS SIR Sect L1 - Resume Template.docx DOCX document
DNTS SIR Sect L5 - Clarfication Form.docx DOCX document
DNTS SIR Sect L8 - Management Capability Form.docx DOCX document
DNTS SIR Sect M.pdf PDF
DNTS SIR Sect E.pdf PDF
DNTS SIR Sect F.pdf PDF
DNTS SIR Sect G.pdf PDF
DNTS SIR Sect I.pdf PDF
DNTS SIR Sect C.pdf PDF
DNTS SIR Sect H.pdf PDF
DNTS SIR Sect J3 - Labor Categories.pdf PDF
DNTS SIR Sect J4 - ISD Process.pdf PDF
DNTS SIR Sect K.pdf PDF
DNTS SIR Sect L3 - WJHTC Access Instructions.pdf PDF
DNTS SIR Sect M1 OCT Plan.pdf PDF
DNTS SIR Sect B Price Template.xlsx XLSX spreadsheet
DNTS SIR Sect J1 - FAA-P-2978e.pdf PDF
DNTS SIR Sect J2 - CDRLs and DIDs.pdf PDF
DNTS SIR Sect L.pdf PDF
DNTS SIR Sect L2 - Past Performance Survey.pdf PDF
DNTS SIR Sect L4 - Offeror Self Assessment Form.xlsx XLSX spreadsheet
DNTS SIR Sect L6 - OCT Participation.docx DOCX document
DNTS SIR Sect L7- Sample Testing VRTM.pdf PDF
DNTS SIR Sect M2 - VRTM for Evaluation.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dedicated Network Telecommunications System (DNTS) SIR # 693KA8-24-R-00007

D-1

PART I – SECTION D

PACKAGING, HANDLING, STORAGE, AND TRANSPORTATION

TABLE OF CONTENTS

D.1. PRESERVATION, PACKAGING, AND PACKING

D.2. BAR CODE ASSET TRACKING SYSTEM

D.3. STORAGE AND TRANSPORTATION

D-2

D.1. PRESERVATION, PACKAGING, AND PACKING

The contractor must provide preservation, packaging and packing on all system packaging and containers.

The following information is applicable to all containers.

a) All items must be individually packaged to the minimum requirements of the American Society for Testing and Materials (ASTM) D3951-10. Standard Practices for commercial packaging are encouraged unless it is shown that commercial packaging cannot provide adequate protection and preservation. Common hardware items may be packaged in multiple unit pack quantities compatible with the Unit of Issue (UI) or Quantity per Unit Pack (QUP). BULK QUANTITIES

ARE NOT ACCEPTABLE. RETAIL PACKAGING PRACTICES ARE NOT

ACCEPTABLE.

b) Items subject to damage by electromagnetic and electrostatic field forces must be initially wrapped in material conforming to MIL-PRF-81705E (1), Type III. ESD intermediate and exterior containers must be marked with the yellow and black ESD label IAW current standard of

MIL-STD-129R.

c) Packaging and marking for Hazardous materials must comply with applicable requirements for

Performance Oriented Packaging contained in the International Air Transport Association (IATA)

Dangerous Goods Regulations or the International Maritime Dangerous Goods Code (IMDG) and with Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49.

d) Unless specifically exempt in the contract or solicitation, the following identification information must be marked using current standard of MIL-STD-129R.

a. Assemblies, modules and equipment must be marked with a serial number to serve as a unique identifier.

e) Labels must include the following specifications from MIL-STD-129R paragraphs:

a. 5.1.1 Identification Marking

b. 5.4.1.1.1 Identification Barcode Marking

c. 5.13 Hazmat Marking and Labeling

D-3

D.2. BAR CODE ASSET TRACKING SYSTEM

As ordered by the Government, each equipment item delivered to the FAA must have a bar code identifying the item in accordance with the FAA approved Bar Code as described in Section C of this contract.

The contractor must support the FAA scanning initiative for tracking production units from their point of shipment originating at the production facility to receipt of production units by the FAA. To support this effort, the contractor must record the unit serial numbers in the FAA .XML file tracking format specified by the FAA. The contractor must also attach the tracking information to the shipment in a separate file.

The contractor must align the barcode scanning process to allow the interface with the FAA Life Cycle

Asset Tracking System (LCATS). The contractor must modify any existing processes to work with the

FAA Scanning Process as defined in Contract Section C.3.3.12.

D.3. STORAGE AND TRANSPORTATION

Components, equipment, and spares must be transported by the most economical means considering dependability, safety, urgency of need and the use of the least costly mode meeting these considerations to the FAA Logistics Center. All material must be shipped F.O.B. Destination.

For all shipments, the Contractor must send electronic mail messages to the FAA Contracting Officer and other FAA Points of Contract listed in Section G (Contracting Officer’s Representative, FAA Property

Manager, etc.) as follows:

Sixty (60) days prior to shipment - The Contracting Officer s the FAA Contracting Officer and other FAA Points of Contract listed in Section G the following pertinent information via electronic mail:

1. Contract Number;

2. National Stock Number & Material-Management-Code;

3. Number of Pieces;

4. Weight and Dimensions of each piece in each shipment;

5. Any special storage requirements; and

6. Expected Delivery Date

Upon shipment to Destination - The Contractor must send notification of shipment.

File details come from the government source that posted it. Updated .