DMVbidspecifications.doc
DOC document 20 KB Posted
- Solicitation number
- RFQ - 29B - 07082300000000000128
- Issued by
- Kennebec County, Maine
About this file
This is a bid specification document for the Maine Department of Motor Vehicles outlining a phased renovation project involving the provision and installation of Herman Miller office panels and surfaces. The project is divided into four phases: Phase 1 (Admin Area), Phase 2 (Motor Carriers), Phase 3 (Dealer/Titles), and Phase 4 (Registration). Each phase requires bidders to submit separate quotes for both product and construction components. Phase 1 includes new panels, electrical connectors, and "as new" surfaces. Phases 2 through 4 require "as new" Herman Miller components and electrical connectors. Construction services involve dismantling existing workstations, relocating lateral and vertical files and related equipment, installing new carpeting, and reassembling workstations in the new configuration. All work must be completed during non-work hours, including evenings and weekends, to minimize disruption to DMV operations.
The specification document does not provide explicit information regarding pricing terms, bid submission deadlines, site visit requirements, bidders' conferences, award dates, contract duration, renewal options, set-asides, incumbent contractor status, or funding sources and amounts. Bidders should anticipate that project execution will require coordination with DMV staff to ensure work is scheduled during off-hours and that proper workspace restoration occurs following each phase's completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DMVfloorplans.doc | DOC document | |
| Conditions and Instructions to Bidders.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request of bids on 4 separate projects named Phase 1- Admin. area; Phase 2 - Motor Carriers; Phase 3 -Dealer/Titles; Phase 4- Registration. Each phase has two components:
Product
Phase 1 new panels and electrical connectors, "as new" surfaces
Phase 2 "as new" Herman-Miller components, new electrical connectors
Phase 3 + 4 "as new" Herman-Miller components and connectors
Construction
This involves the dismantling of workstations, moving lateral and vertical files along with other items and the reassembling of workstations in the new configuration after the carpeting has been installed.
Each Phase needs be quoted for Product and Construction separately.
This work needs to be done during non-work hours, evening and weekends.