DMVbidspecifications.doc

DOC document 20 KB Posted

Attached to
Provide and installation of Herman Miller panel and surface
Solicitation number
RFQ - 29B - 07082300000000000128
Issued by
Kennebec County, Maine

About this file

This is a bid specification document for the Maine Department of Motor Vehicles outlining a phased renovation project involving the provision and installation of Herman Miller office panels and surfaces. The project is divided into four phases: Phase 1 (Admin Area), Phase 2 (Motor Carriers), Phase 3 (Dealer/Titles), and Phase 4 (Registration). Each phase requires bidders to submit separate quotes for both product and construction components. Phase 1 includes new panels, electrical connectors, and "as new" surfaces. Phases 2 through 4 require "as new" Herman Miller components and electrical connectors. Construction services involve dismantling existing workstations, relocating lateral and vertical files and related equipment, installing new carpeting, and reassembling workstations in the new configuration. All work must be completed during non-work hours, including evenings and weekends, to minimize disruption to DMV operations.

The specification document does not provide explicit information regarding pricing terms, bid submission deadlines, site visit requirements, bidders' conferences, award dates, contract duration, renewal options, set-asides, incumbent contractor status, or funding sources and amounts. Bidders should anticipate that project execution will require coordination with DMV staff to ensure work is scheduled during off-hours and that proper workspace restoration occurs following each phase's completion.

View the file

Other files

File Type Posted
DMVfloorplans.doc DOC document
Conditions and Instructions to Bidders.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request of bids on 4 separate projects named Phase 1- Admin. area; Phase 2 - Motor Carriers; Phase 3 -Dealer/Titles; Phase 4- Registration. Each phase has two components:

Product

Phase 1 new panels and electrical connectors, "as new" surfaces

Phase 2 "as new" Herman-Miller components, new electrical connectors

Phase 3 + 4 "as new" Herman-Miller components and connectors

Construction

This involves the dismantling of workstations, moving lateral and vertical files along with other items and the reassembling of workstations in the new configuration after the carpeting has been installed.

Each Phase needs be quoted for Product and Construction separately.

This work needs to be done during non-work hours, evening and weekends.

File details come from the government source that posted it. Updated .