DMEA_STTR_26TZ_R5.pdf

PDF 186 KB Posted

Attached to
Cable Connector Enhancement
Solicitation number
DME26TZ05-NP001
Issued by

About this file

This document is the Defense Microelectronics Activity (DMEA) FY26 Small Business Technology Transfer (STTR) Broad Agency Announcement (BAA), Release 05, containing proposal submission instructions and one open research topic.

The solicitation is administered by DMEA's Office of Small Business Programs and requires all proposals be submitted through the DoW SBIR/STTR Innovation Portal (DSIP). Phase I efforts are limited to $100,000 with a maximum three-month performance period and must address the feasibility of innovative solutions with technical risk. Phase I proposals require a 10-page maximum technical volume (Volume 2), cost volume (Volume 3) with detailed itemization, proposal coversheet (Volume 1), Company Commercialization Report (Volume 4), supporting documents (Volume 5), fraud and abuse training completion (Volume 6), and foreign affiliations disclosure (Volume 7). Cost proposals must be fair and reasonable and will be negotiated; cost sharing is permitted but not required or evaluated. Phase II awards are limited to $1,340,000 with a 24-month performance period and require a 40-page technical volume; Phase I awardees may submit Phase II proposals within 60 days of Phase I contract completion. DMEA offers up to $6,500 per Phase I project and $50,000 per Phase II project in discretionary Technical and Business Assistance. The single open topic (DME26TZ05-NP001) addresses Cable Connector Enhancement, requiring development of a robust, multiform factor solution to strengthen COTS cable connections on existing fabricated boards compatible with potting processes, without requiring custom cable manufacturing or tooling. Phase I requires a feasibility study addressing compatibility with specified connectors and performance against MIL-STD testing standards; Phase II requires physical testing and long-term electrical validation. Small business concerns may submit only one proposal per open topic, with only the most recent certified submission evaluated prior to the deadline.

View the file

Other files

File Type Posted
DME26TZ05-NP001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DMEA - 1

Defense Microelectronics Activity (DMEA) FY26 Small Business Technology Transfer (STTR)

BAA

Release 05

Proposal Submission Instructions

INTRODUCTION

The Defense Microelectronics Activity (DMEA) SBIR/STTR Program is implemented, administrated, and managed by the DMEA Office of Small Business Programs (OSBP).

Proposers responding to a topic in this solicitation must follow all general instructions provided in the Department of War (DoW) STTR Program solicitation. DMEA requirements in addition to or deviating from the DoW Program solicitation are provided in the instructions below.

Proposers are encouraged to thoroughly review the DoW solicitation and register for the DSIP Listserv to remain apprised of important programmatic and contractual changes.

• The full DoW solicitation is available on DSIP at https://www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations. Be sure to select the tab for the appropriate solicitation cycle.

• Register for the DSIP Listserv at: https://www.dodsbirsttr.mil/submissions/login.

Specific questions pertaining to the administration of the DMEA SBIR/STTR Program and these proposal preparation instructions should be directed to: DMEA SBIR/STTR Program at osd.mcclellanpark.dmea.list.sbir-sttr1@mail.mil

This release contains an open topic. As outlined in section 7 of the SBIR and STTR Extension Act of 2022, innovation open topic activities—

(A) Increase the transition of commercial technology to the Department of War;

(B) Expand the small business nontraditional industrial base;

(C) Increase commercialization derived from investments of the Department of War; and

(D) Expand the ability for qualifying small business concerns to propose technology solutions to meet the needs of the Department of War.

Unlike conventional topics, which specify the desired technical objective and output, open topics can use generalized mission requirements or specific technology areas to adapt commercial products or solutions to close capability gaps, improve performance, or provide technological advancements in existing capabilities.

A small business concern may only submit one (1) proposal to each open topic. If more than one proposal from a small business concern is received for a single open topic, only the most recent proposal to be certified and submitted prior to the submission deadline will receive an evaluation. All prior proposals submitted by the small business concern for the same open topic will be marked as nonresponsive and will not receive an evaluation.

PHASE I PROPOSAL GUIDELINES

The DoW SBIR/STTR Innovation Portal (DSIP) is the official portal for DoW SBIR/STTR proposal submission. Proposers are required to submit proposals via DSIP; proposals submitted by any other means will be disregarded. Detailed instructions regarding registration and proposal submission via DSIP are provided in the DoW solicitation.

https://www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations https://www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations https://www.dodsbirsttr.mil/submissions/login https://www.dodsbirsttr.mil/submissions/login https://www.dodsbirsttr.mil/submissions/login

DMEA - 2

DMEA intends for Phase I to be only an examination of the merit of the concept or technology that still involves technical risk, with a cost not exceeding $ 100,000.00. The technical period of performance for the Phase I effort shall be no more than three (3) months

Proposal Coversheet (Volume 1)

The proposal coversheet is prepared on DSIP and in accordance with the DoW solicitation.

Technical Volume (Volume 2) The technical volume is not to exceed 10 pages and must follow the formatting requirements provided in the DoW STTR solicitation. Technical volumes exceeding 10 pages will be deemed non-compliant and will not be evaluated.

Content of the Technical Volume Read the DoW STTR Program BAA for detailed instructions on proposal format and program requirements. When you prepare your proposal submission, keep in mind that Phase I should address the feasibility of a solution to the topic. Only UNCLASSIFIED proposals will be accepted.

DMEA will evaluate and select Phase I proposals using the evaluation criteria contained in the DoW STTR Program BAA. Due to limited funding, DMEA reserves the right to limit awards under any topic, and only proposals considered to be of superior quality will be funded.

Cost Volume (Volume 3) The Phase I Base amount must not exceed $100,000.00. DMEA will conduct a price analysis to determine whether cost proposals, including quantities and prices, are fair and reasonable.

Contractors should expect that cost proposals will be negotiated. Costs must be separated and clearly identified on the Proposal Cover Sheet (Volume 1) and in Volume 3.

The on-line cost volume for Phase I proposal submissions must be at a level of detail that would enable DMEA personnel to determine the purpose, necessity, and reasonability of each cost element. Provide sufficient information (a. through h. below) on how funds will be used if the contract is awarded. Include the itemized cost volume information (a. through h. below) as an appendix in your technical proposal. The itemized cost volume information (a. through h. below) will not count against the 10-page limit on Phase I proposal submissions.

a. Special Tooling and Test Equipment and Material: The inclusion of equipment and materials will be carefully reviewed relative to need and appropriateness of the work proposed.

The purchase of special tooling and test equipment must, in the opinion of the Contracting Officer, be advantageous to the Government and relate directly to the specific effort. They may include such items as innovative instrumentation and/or automatic test equipment. Title to property furnished by the Government or acquired with Government funds will be vested with the DoW Component; unless it is determined that transfer of the title to the contractor would be more cost effective than recovery of the equipment by the DoW Component.

b. Direct Cost Materials: Justify costs for materials, parts, and supplies with an itemized list containing types, quantities, price, and where appropriate, purposes.

DMEA - 3

c. Other Direct Costs: This category of costs includes specialized services such as machining or milling, special testing or analysis, costs incurred in obtaining temporary use of specialized equipment. Proposals, which include teased hardware, must provide an adequate lease versus purchase justification or rationale.

d. Direct Labor: Identify key personnel by name if possible or by labor category if specific names are not available. The number of hours, labor overhead and/or fringe benefits and actual hourly rates for each individual are also necessary.

e. Travel: Travel costs must relate to the needs of the project. Break out travel cost by trip, with the number of travelers, airfare, and per diem. Indicate the destination, duration, and purpose of each trip.

f. Cost Sharing: Cost sharing is permitted. However, cost sharing is not required, nor will it be an evaluation factor in the consideration of a proposal.

g. Subcontracts: Involvement of university or other consultants in the planning and /or research stages of the project may be appropriate. If the offeror intends such involvement, describe the involvement in detail and include information in the cost proposal. The proposed total of all consultant fees, facility leases, or usage fees and other subcontract or purchase agreements may not exceeding one-third of the total contract price or cost, unless otherwise approved in writing by the Contracting Officer. Support subcontract costs with copies of the subcontract agreements. The supporting agreement documents must adequately describe the work to be performed (i.e., Cost Volume). At the very least, a statement of work with a corresponding detailed cost volume for each planned subcontract must be provided.

h. Consultants: Provide a separate agreement letter for each consultant. The letter should briefly state what service or assistance will be provided, the number of hours required, and the hourly rate.

Please review the updated Percentage of Work (POW) calculation details included in the DoW solicitation. Deviations from the POW requirements are not permitted.

Company Commercialization Report (CCR) (Volume 4) Completion of the CCR as Volume 4 of the proposal submission in DSIP is required. Please refer to the DoW solicitation for full details on this requirement. Information contained in the CCR will be considered by DMEA during proposal evaluations.

Supporting Documents (Volume 5) Volume 5 is provided for proposing SBCs to submit additional documentation to support the Coversheet (Volume 1), Technical Volume (Volume 2), and the Cost Volume (Volume 3). Please refer to the DoW solicitation for more information.

Fraud, Waste and Abuse Training (Volume 6) Fraud, Waste and Abuse training material can be found in the Volume 6 section of the proposal submission module in DSIP and must be thoroughly reviewed once per year to proceed with proposal submission.

DMEA - 4

Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7) Small business concerns must complete the Disclosures of Foreign Affiliations or Relationships to Foreign Countries webform in Volume 7 of the DSIP proposal submission. Please be aware that the Disclosures of Foreign Affiliations or Relationships to Foreign Countries WILL NOT be accepted as a PDF Supporting Document in Volume 5 of the DSIP proposal submission. Do not upload any previous versions of this form to Volume 5. For additional details, please refer to the DoW Program BAA.

PHASE II PROPOSAL GUIDELINES

Phase II proposals may only be submitted by Phase I awardees. Phase II is the prototype/demonstration of the technology that was found feasible in Phase I. DMEA encourages, but does not require partnership and outside investment as part of discussions with DMEA sponsors for potential Phase II efforts.

The Technical Volume is not to exceed forty (40) pages and consists of a single PDF file with your firm name, topic number, and proposal number in the header of each page. All documentation should use no smaller than 10-point font on standard 8.5" X 11" paper with one-inch margins and not be in two-column format. Do not include blank pages.

Phase II proposals may be submitted for an amount not to exceed $1,340,000.00. The technical period of performance for the Phase II effort shall be no more than twenty-four (24) months.

Phase I awardees may submit a Phase II proposal without invitation not later than sixty (60) calendar days following the end of the Phase I contract. The Phase II proposal submission instructions are identified in the Phase I contract, Special Contract Requirements, “STTR Phase II Proposal Submission Instructions”.

All Phase II proposals must have a complete electronic submission per the Proposal Volumes area listed in Phase I. Your proposal must be submitted via the submission site on or before the DMEA-specified deadline or it will not be considered for award.

Due to limited funding, DMEA’s ability to award any Phase II, regardless of proposal quality or merit, is subject to availability of funds. Please ensure that your proposal is valid for 180 days after submission Any extension to that time period will be requested by the Contracting Officer.

A Phase II contractor may receive up to one sequential Phase II award for continuing work on a project. A sequential Phase II award has the same guideline amounts and limits as an initial Phase II award. The sequential Phase II proposals shall be initiated by the Government Technical Point of Contact and must be approved by the DMEA SBIR/STTR Program Manager in advance.

DISCRETIONARY TECHNICAL AND BUSINESS ASSISTANCE (TABA)

The Small Business Innovation and Economic Security Act Section 7 mandates agencies to offer TABA.

DMEA will provide up to $6,500 per Phase I project and up to $50,000 per Phase II project.

EVALUATION AND SELECTION

All proposals will be evaluated in accordance with the evaluation criteria listed in the DoW solicitation.

Proposing firms will be notified of selection or non-selection status for a Phase I award within 90 days of the closing date of the topic.

DMEA - 5

Refer to the DoW solicitation for procedures to protest the Announcement.

As further prescribed in FAR 33.106(b), FAR 52.233-3, Protests after Award should be submitted to:

DMEA SBIR/STTR Program at osd.mcclellan-park.dmea.list.sbir-sttr1@mail.mil

DMEA - 6

DMEA STTR DOW 2026 BAA

Topic Index

Release 5

DME26TZ05-NP001 TITLE: Cable Connector Enhancement

DMEA - 7

DME26TZ05-NP001 TITLE: Cable Connector Enhancement

OUSW (R&E) CRITICAL TECHNOLOGY AREA(S): Contested Logistics Technologies (LOG)

COMPONENT TECHNOLOGY PRIORITY AREA(S): Microelectronics

PROJECTED CMMC LEVEL REQUIREMENT: Level 1

OBJECTIVE: Development and validation of a robust, multiform factor applicable solution that is able to strengthen commercial of the shelf (COTS) cable connection points on variety of existing fabricated boards to remove the burden and re design and fabrication with custom solutions for enabling more robust connections. Solution should not require custom cable manufacturing, or tooling, and be compatible with traditional printed circuit board (PCB) assembly, coating and potting processes. The solution should be evaluated against an unmodified connector, as each condition is subjected to a range of shock, vibration, and immersion testing.

DESCRIPTION: It is widely known that the cable to board connection is a common failure prone interface for electronics systems due to the thermal and mechanical stress they are exposed to. For new designs this connection can be engineered such that risk is lowered as much as reasonably possible but for existing design, there are limited options to overcome the difficulty of maintaining a strong reliable electrical connection in stressful environments.

Potting PCBA and electronics assemblies offer great moisture, vibration and shock protection but when potting connectors the potting material is limited to the height of the connector below the electrical contact to prevent potting material from disrupting the connection between each end [3]. This ensures the board side of the connector is secure but not the full connection joint. That connection is still easily severed if it is strained beyond its mechanical limits, which for commercial grade connectors are a relatively low threshold. Commercial connectors could be swapped with more specialized connectors if they exist and the pad footprint on the board is still sufficient but removal of existing connectors from PCBAs still require considerable time for technicians. Reworking existing boards for the purpose of swapping the connector adds additional risk of board fallout from damage or thermal cycling. Repeated use of heat guns for removing and replacing a new connector or cable solution can degrade the heat affected zone and reduce reliability of the board and neighboring components. Especially for densely populated boards with limited distance from a connector to neighboring components which may prevent the use of a heat shield due to limited space. A heat shield can typically be used to avoid thermal and mechanical damage to adjacent components on a PCBA [4]

Other options have the connector removed entirely in favor of a direct solder connection, be the board to cable or board to board. Alternative joining methods to replace the connector connection such as Hot Bar Soldering (HBS) can be cumbersome in both time and resources for small production efforts for any singular design. HBS uses pulse heated to reflow the solder material between a PCBA and the wire to form a strong junction [1]. The Hot Bar Solder (HBS) process for any given design requires tooling, fixturing and a compatible Anisotropic Conductive Film (ACF); the space between conductors, minimum pad area, the plating and substrates involved. For an existing connector footprint within a design compatible ACF may not exist and may not be able to be sourced in reasonable quantities as ACF is commonly sold by the case. While recent advancement exists for mitigating use of ACF [2] other challenges remain with design the tooling and the rework required to remove existing connectors. The design of the tool shape is critically important to the temperature distribution across the reflow area and

DMEA - 8

has significant impact on the resultant mechanical and electrical properties achieved [1]. Tooling design and fabrication iterations increase schedule requirements for assembly efforts with increasing difficulty for adequate tooling shape on densely populated boards.

These different paths or full board redesign and fabrication are expensive, time consuming and limited solutions because they are assembly specific. To enhance prototyping and system integration efforts a more versatile and efficient solution is needed to address this deficiency.

PHASE I: Perform a feasibility study of innovative approaches to enhance the connection of COTS connectors so that it can be applied to highly stressed environmental conditions and compatible with potted and immersion applications. The target specifications for the solution are as follows:

• Capable of operating at temperatures between -50oC to 140oC

• Not impact core functionality of the connector

• Compatible with MMCX, SMA, UFL, Panasonic and Samtec connectors

• Be compatible with potting materials having a viscosity of 20,000 cp and higher

• Able to be applied to small densely populated boards

• Show compatibility with existing manufacturing techniques • Be compatible with the following connector types at minimum:

• Pass MIL-STD-202 Method 201A Vibration testing

• Pass MIL-STD-202 Method 213B condition B Shick testing

• Pass MIL-STD-810 Method 501.5, and 503.5 Thermal testing For a potting scenario it is assumed that the connector is fully submerged in the potting material not just potted below the contact area.

PHASE II: Using method(s) developed in phase 1, perform physical testing of systems through the outlined environmental conditions and long-term testing of solution implemented across compatible connectors. Information to be reported for the following tests/conditions:

• Thermal testing o Pass MIL-STD-810 Method 501.5, and 503.5

• Shock testing o Pass MIL-STD-810 Method 516.6 o Pass MIL-STD-202 Method 213B condition B

• Vibration testing o Pass MIL-STD-810 Method 514.6 o Pass MIL-STD-202 Method 201A

• Long term electrical testing at three different temperature conditions (-15oC, 23oC, and 45oC) for a duration of 1, 2, and 4 weeks

• Potting viscosity test with potting material(s) possessing viscosities of 20,000, to 60,000 cp

• Expand compatibility investigation with addition connector types

Performer is expected to show repeatability in the data collected, provide the information and a sample of materials/tools necessary for performing the enhancement as applicable. If the performer cannot perform any of the testing outlined, justification must be provided for the exclusion of the relevant data set.

PHASE III DUAL USE APPLICATIONS: The developed solution could be brought to market and targeted at other electronics solutions areas such as defense contractors, consumer electronics companies or the common hobbyist for commercial applications. The solution would also be directly marketable to the DOD and other government agencies who implement electronic systems into harsh or demanding environments.

REFERENCES:

DMEA - 9

1. Lin, Meng / Lee, Jen / Hwan, Chung / Liao, Jung Effect of Hot Bar Shape on Temperature Consistency 2008-03 Advanced Materials Research , Vol. 33-37 p. 1319-1326

2. Payne, Dean / Nash, Chris / Lasky, Ron Recent Advancements in Hot Bar Soldering 2023-10 SMTA International , Vol. 25 p. 579-585

3. Molex, Potting-Capable Low-power and signal Vertical Headers 2023/10/31

4. Ismail AA, Bakar MA, Ehsan AA, Jalar A, Burke J, Zolkefli ZE, Basiron E. Effect of heat shield locations on rework-induced thermal management in ball grid array solder joint. Sci Rep. 2022 Sep 6;12(1):15118. doi: 10.1038/s41598-022-19436-6. PMID: 36068289; PMCID: PMC9448760.

KEYWORDS: PCBA, Connector, Header, environmental testing, potting

INTRODUCTION
PHASE I PROPOSAL GUIDELINES
Technical Volume (Volume 2)
Content of the Technical Volume
Cost Volume (Volume 3)
Company Commercialization Report (CCR) (Volume 4)
Supporting Documents (Volume 5)
Fraud, Waste and Abuse Training (Volume 6)
PHASE II PROPOSAL GUIDELINES
DISCRETIONARY TECHNICAL AND BUSINESS ASSISTANCE (TABA)
EVALUATION AND SELECTION
Topic Index
Release 5

File details come from the government source that posted it. Updated .