dj051 overhaul description 01-602-9867.pdf
PDF 8 KB Posted
- Solicitation number
- 70Z08021QDJ051
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PACKAGING REQUIREMENTS FY 2015.doc | DOC document | |
| dj051 overhaul descripton 3010-01-530-1103.pdf | ||
| 52.212-5 nov.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHAUL DESCRIPTION
FOR OFFICIAL USE ONLY
ITEM NAME INTERCOMMUNICATION STATION
STOCK NUMBER 5830-01-602-9867
PART NUMBER RB8800
USED ON FRC 154
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
Refer to SFLC SPECIFICATION R-400-299-L
Each inspection report submittal shall be configured to read as follows for each piece of Equipment repaired.
1.) Hourly Labor Rate: __________ 2.) Hours needed for each piece of equipment being repaired: __________ 3.) A list of parts that are being replaced for each piece of equipment being repaired: __________ 4.) The cost of each part that is being replaced for each piece of equipment being repaired: __________ 5.) If any other costs are being implemented such as Packaging, Marking, Freight and or Delivering etc. these charges shall be individually identified on the inspection/repair report.
Failure in following these instructions will result in the termination of the contract.
EACH ITEM TO HAVE ELECTROSTATIC PROTECTION IAW TYPE III, CLASS I OF MIL-B-
81705E W_AMENDMENT 1 DTD 02/08/2010, IF REQUIRED.
EACH ITEM TO BE INDIVIDUALLY PACKAGED IAW THE FOLLOWING:
MIL-STD-2073-1E METHOD 10
SFLC SP-PP&M-001 REV D DTD 05/10
ASTM-D-3951-10.
EACH ITEM TO BE INDIVIDUALLY MARKED IAW THE FOLLOWING:
MIL-STD-129P W/CHANGE 4
SFLC SP-PP&M-001 REV D DTD 05/10.
BAR CODING REQUIRED, IF CAPABLE, TO COMPLY WITH THE FOLLOWING:
SFLC SP-PP&M-001 REV D DTD 05/10
WARRANTY:
X A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.
Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.
GOVERNMENT ACCEPTANCE:
SHELF LIFE CD 0
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative.
Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.
OVERHAUL DESCRIPTION
PACKAGING AND MARKING FOR SHIPMENT:
X
A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER
ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
5830-01-602-9867
INTERCOMMUNICATION STATION
RB8800
PRESERVATION / PACKAGING:
X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.
B. See Attachments
B. See Attachments
And the words: "Coast Guard SFLC Material, Condition "A"
RECOMMENDED SOURCES:
FURUNO USA INC
70 ENGERMAN AVE.
DENTON,MD. 21629
PH:410-479-4420, 800-343-9171
ATT:KELLY
GEODESICX, INC.
616 INNOVATION DRIVE
CHESAPEAKE VA 23320-3826
SALES@GEODESICX.COM
757-312-0790 EXT 232
WRITTEN BY:
DATE :
KEVIN CANTRELL
22 JUN 21
Cost Estimate for Overhaul NOT TO EXCEED: $2,000
File details come from the government source that posted it. Updated .