This document is a Single Source Justification (SSJ) for the Western Area Power Administration (WAPA) to award a firm-fixed-price contract to Utility Systems Inc. (USI) for the Disturbance Monitoring Equipment (DME) M9000 controller system at the Liberty and Pinnacle Peak substations. WAPA requires the updated controllers to satisfy the North American Electric Reliability Corporation (NERC) Protection and Control (PRC)-002-2 compliance requirement. USI is the only vendor that can provide the compatible controllers that communicate with the existing USI DME equipment and offer the necessary technical support. WAPA has standardized on USI DME equipment within the Desert Southwest region to meet the NERC PRC-002-2 requirement. The contract will also include 3 days of on-site technical services support from USI. This is not a request for competitive quotes or proposals, but WAPA will consider responses from responsible sources within 7 days to determine if a competitive procurement should be conducted instead of the sole source award to USI.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Single Source Justification Western Area Power Administration (WAPA) FAR 13.106-1(b)(1), Simplified Acquisitions

24WA152920/24WA152912

1. Identification of the agency and the contracting office.

Department of Energy, WAPA, Desert Southwest Region (DSW), G1500- Procurement Office 615 S. 43rd Ave.

Phoenix, AZ 85009

2. Description of supply or service required to meet the agency’s needs This is a single source (firm-fixed-price) acquisition to Utility Systems Inc. (USI) for the Disturbance Monitoring Equipment (DME) M9000 controller system at Liberty & Pinnacle Peak Substations.

3. The rationale or circumstances for limiting competition.

The Disturbance Monitoring Equipment was installed to satisfy North American Electric Reliability Corporation (NERC) Protection and Control (PRC)-002-2 compliance requirement.

Liberty and Pinnacle Peak USI DME equipment require updated controllers. The controllers communicate with other USI DME equipment gathering and updating information. The information is used to satisfy NERC PRC-002-2.

The USI M9000 is the only controller that communicates with other USI DME equipment gathering the necessary information. USI is the only vendor that sells a controller for gathering and updating information from USI DME equipment.

USI is the only source that can provide technical support to install and operate USI equipment, and no other vendor can offer these services for USI DME controllers.

Desert Southwest standardized on the USI DME. USI DME is the only equipment used to perform NERC PRC-002-2 within DSW. The only vendor that makes a controller that works with USI DME equipment is USI. A three day on site technical services support is also required with this request.

File details come from the government source that posted it. Updated .