This is a District 7 Highway Sweeping Work Location Sheet from the Kentucky Transportation Cabinet outlining sweeping maintenance services across multiple interstate and state highway routes in the Fayette, Scott, Clark, Madison, and Rockcastle counties. The project encompasses a total of 137.643 sweeping miles across Interstate 75, Interstate 64, Kentucky Route 4, Kentucky Route 9000, Kentucky Route 1878, U.S. Route 25, and associated ramps and barrier walls. The work includes 263.8 total sweeping miles to be completed in multiple cycles throughout the year, with a maximum completion timeframe of 15 calendar days per full sweeping cycle. Interstate sweeping totals 90.998 miles requiring 164.3 sweeping miles across seven cycles, while non-interstate sweeping totals 46.645 miles requiring 99.5 sweeping miles across two to four cycles depending on the route. Sweeping cycle start dates are scheduled for the second Monday in March, fourth Monday in April, second Monday in June, fourth Monday in July, second Monday in September, fourth Monday in October, and second Monday in December, with variations between partial cycle sweeps of seven occurrences and full cycle sweeps of two to seven occurrences.

The scope of work includes sweeping barrier walls, bridge decks, shoulders, curb lines, and elevated overpasses across designated project limits. Specific locations include sweeping bridges over Interstate 75 at multiple exit numbers and sweeping all four full-width shoulders on New Circle Road. The work requires regular maintenance with designated cycle frequencies, with some routes requiring seven partial sweeps annually and others requiring two to four full sweeps annually based on traffic volume and maintenance needs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

District 7
Highway Sweeping Work Location Sheet
Limits of ProjectProject
RouteProjectLengthSweeping# of
NumberCountyNumberBeginEnd(Miles)MilesCyclesNotes
I-75*MadisonFE01 076 0075Rockcastle Co. LineFayette Co. Line24.29534.07Sweep barrier wall and bridge decks
073-098(MP 73.408)(MP 97.703)
I-75 **FayetteFE01 034 0075Fayette Co. LineScott Co. Line23.08942.17Sweep barrier wall and bridge decks
097-121(MP 97.703)(MP 120.792)
I-75FayetteFE01 034 0075Beg. of Barr. Wall SBEnd of Barr. Wall0.3000.67Barrier wall seperating I-75 SB
117-118(MP 118.1)(MP 117.8)and I-64 WB ramp.
I-75***ScottFE01 105 0075Fayette Co. Line2 Mi. N. of KY 32 Int.17.67629.27Sweep barrier wall and bridge decks
120-139(MP 120.792)(MP 138.468)
I-75ScottFE01 105 0075SB Rest Area RampMerge Area1.2002.57Barrier wall seperating interchange
126-128(MP 127.5) **(MP 126.3) **and Rest Area.
I-64FayetteFE01 034 0064Begin of Barrier WallClark Co. Line7.26015.77Sweep barrier wall and bridge decks
082-090(MP 82.200)(MP 89.460)
I-64ClarkFE01 025 0064Fayette Co. LineNear Rest Area Ent.8.45016.97Sweep barrier wall and bridge decks
089-096(MP 89.460)(MP 97.910)
KY 4FayetteFE01 034 0004US 60Lexmark Overpass4.9897.87Median barrier wall
004-008(MP 4.611)(MP 9.600)
KY 4 RampFayette0.47Versailles Road fly-over ramp
at US 60Inner and outer shoulder
KY 9000ClarkFE01 025 90000.17WB lane on elevated overpass
(Mtn. Pkwy)000-001over I-64, left side only
District 7
Highway Sweeping Work Location Sheet
Limits of ProjectProject
RouteProjectLengthSweeping# of
NumberCountyNumberBeginEnd(Miles)MilesCyclesNotes
KY 1878FayetteFE01 034 1878KY 922US 4213.73915.07All shoulders
000-004(MP 0.000)(MP 3.739)

Total Interstate Sweeping Miles 90.998 164.3

KY 4FayetteFE01 034 0004Nicholasville RoadNicholasville Road19.28315.74Sweep barrier wall and bridge decks
New Circle Rd000-020(MP 0.000)(MP 19.283)
US 25FayetteFE01 034 0025KY 418KY 44.6365.24Sweep barrier wall and bridge decks
(Richmond Rd)006-011(MP 6.152)(MP 10.788)
US 25FayetteFE01 034 0025KY 4 RampsOakwood Drive0.4741.04Sweep shoulder curb lines
Georgetown Rd016-017(MP 16.247)(MP 16.721)
US 25FayetteFE01 034 0025Kearney Ridge RoadKY 19732.9690.54Sweep three bridge decks
Georgetown Rd018-022(MP 18.709)(MP 21.678)
KY 4FayetteFE01 034 0004Nicholasville RoadNicholasville Road19.28377.12Sweep all 4, full-width shoulders on
New Circle Rd000-020(MP 0.000)(MP 19.283)full length of New Circle Road
Total Non-Interstate Sweeping Miles46.64599.5
Total Sweeping Miles137.643263.8
Maximum time to complete a full sweeping cycle: 15 Calendar Days
* This will also include sweeping the bridges over I-75 at exit #'s 76, 77, 83, 87, 90, 95 and 97.
** This will also include sweeping the bridges over I-75 and the curbline on the on and off ramps at exit #'s 104, 108, 113 and 120.
*** This will also include sweeping the bridges over I-75 at exit #'s 125, 126, 129 and 136.
Sweeping Cycle Start Dates:
Second Monday in MarchPartial CycleSweep 7
Fourth Monday in AprilFull CycleSweep 4
Second Monday in JuneFull CycleSweep All
Fourth Monday in JulyPartial CycleSweep 7
Second Monday in SeptemberFull CycleSweep 4
Fourth Monday in OctoberPartial CycleSweep 7
Second Monday in DecemberFull CycleSweep All

File details come from the government source that posted it. Updated .