This is a District 7 Highway Sweeping Work Location Sheet from the Kentucky Transportation Cabinet outlining sweeping maintenance services across multiple interstate and state highway routes in the Fayette, Scott, Clark, Madison, and Rockcastle counties. The project encompasses a total of 137.643 sweeping miles across Interstate 75, Interstate 64, Kentucky Route 4, Kentucky Route 9000, Kentucky Route 1878, U.S. Route 25, and associated ramps and barrier walls. The work includes 263.8 total sweeping miles to be completed in multiple cycles throughout the year, with a maximum completion timeframe of 15 calendar days per full sweeping cycle. Interstate sweeping totals 90.998 miles requiring 164.3 sweeping miles across seven cycles, while non-interstate sweeping totals 46.645 miles requiring 99.5 sweeping miles across two to four cycles depending on the route. Sweeping cycle start dates are scheduled for the second Monday in March, fourth Monday in April, second Monday in June, fourth Monday in July, second Monday in September, fourth Monday in October, and second Monday in December, with variations between partial cycle sweeps of seven occurrences and full cycle sweeps of two to seven occurrences.
The scope of work includes sweeping barrier walls, bridge decks, shoulders, curb lines, and elevated overpasses across designated project limits. Specific locations include sweeping bridges over Interstate 75 at multiple exit numbers and sweeping all four full-width shoulders on New Circle Road. The work requires regular maintenance with designated cycle frequencies, with some routes requiring seven partial sweeps annually and others requiring two to four full sweeps annually based on traffic volume and maintenance needs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| District 7 | ||||||||
| Highway Sweeping Work Location Sheet | ||||||||
| Limits of Project | Project | |||||||
| Route | Project | Length | Sweeping | # of | ||||
| Number | County | Number | Begin | End | (Miles) | Miles | Cycles | Notes |
| I-75* | Madison | FE01 076 0075 | Rockcastle Co. Line | Fayette Co. Line | 24.295 | 34.0 | 7 | Sweep barrier wall and bridge decks |
| 073-098 | (MP 73.408) | (MP 97.703) |
| I-75 ** | Fayette | FE01 034 0075 | Fayette Co. Line | Scott Co. Line | 23.089 | 42.1 | 7 | Sweep barrier wall and bridge decks |
| 097-121 | (MP 97.703) | (MP 120.792) |
| I-75 | Fayette | FE01 034 0075 | Beg. of Barr. Wall SB | End of Barr. Wall | 0.300 | 0.6 | 7 | Barrier wall seperating I-75 SB |
| 117-118 | (MP 118.1) | (MP 117.8) | and I-64 WB ramp. |
| I-75*** | Scott | FE01 105 0075 | Fayette Co. Line | 2 Mi. N. of KY 32 Int. | 17.676 | 29.2 | 7 | Sweep barrier wall and bridge decks |
| 120-139 | (MP 120.792) | (MP 138.468) |
| I-75 | Scott | FE01 105 0075 | SB Rest Area Ramp | Merge Area | 1.200 | 2.5 | 7 | Barrier wall seperating interchange |
| 126-128 | (MP 127.5) ** | (MP 126.3) ** | and Rest Area. |
| I-64 | Fayette | FE01 034 0064 | Begin of Barrier Wall | Clark Co. Line | 7.260 | 15.7 | 7 | Sweep barrier wall and bridge decks |
| 082-090 | (MP 82.200) | (MP 89.460) |
| I-64 | Clark | FE01 025 0064 | Fayette Co. Line | Near Rest Area Ent. | 8.450 | 16.9 | 7 | Sweep barrier wall and bridge decks |
| 089-096 | (MP 89.460) | (MP 97.910) |
| KY 4 | Fayette | FE01 034 0004 | US 60 | Lexmark Overpass | 4.989 | 7.8 | 7 | Median barrier wall |
| 004-008 | (MP 4.611) | (MP 9.600) |
| KY 4 Ramp | Fayette | 0.4 | 7 | Versailles Road fly-over ramp |
| at US 60 | Inner and outer shoulder |
| KY 9000 | Clark | FE01 025 9000 | 0.1 | 7 | WB lane on elevated overpass |
| (Mtn. Pkwy) | 000-001 | over I-64, left side only |
| District 7 | ||||||||
| Highway Sweeping Work Location Sheet | ||||||||
| Limits of Project | Project | |||||||
| Route | Project | Length | Sweeping | # of | ||||
| Number | County | Number | Begin | End | (Miles) | Miles | Cycles | Notes |
| KY 1878 | Fayette | FE01 034 1878 | KY 922 | US 421 | 3.739 | 15.0 | 7 | All shoulders |
| 000-004 | (MP 0.000) | (MP 3.739) |
Total Interstate Sweeping Miles 90.998 164.3
| KY 4 | Fayette | FE01 034 0004 | Nicholasville Road | Nicholasville Road | 19.283 | 15.7 | 4 | Sweep barrier wall and bridge decks |
| New Circle Rd | 000-020 | (MP 0.000) | (MP 19.283) |
| US 25 | Fayette | FE01 034 0025 | KY 418 | KY 4 | 4.636 | 5.2 | 4 | Sweep barrier wall and bridge decks |
| (Richmond Rd) | 006-011 | (MP 6.152) | (MP 10.788) | |||||
| US 25 | Fayette | FE01 034 0025 | KY 4 Ramps | Oakwood Drive | 0.474 | 1.0 | 4 | Sweep shoulder curb lines |
| Georgetown Rd | 016-017 | (MP 16.247) | (MP 16.721) | |||||
| US 25 | Fayette | FE01 034 0025 | Kearney Ridge Road | KY 1973 | 2.969 | 0.5 | 4 | Sweep three bridge decks |
| Georgetown Rd | 018-022 | (MP 18.709) | (MP 21.678) | |||||
| KY 4 | Fayette | FE01 034 0004 | Nicholasville Road | Nicholasville Road | 19.283 | 77.1 | 2 | Sweep all 4, full-width shoulders on |
| New Circle Rd | 000-020 | (MP 0.000) | (MP 19.283) | full length of New Circle Road | ||||
| Total Non-Interstate Sweeping Miles | 46.645 | 99.5 | ||||||
| Total Sweeping Miles | 137.643 | 263.8 |
| Maximum time to complete a full sweeping cycle: 15 Calendar Days | ||
| * This will also include sweeping the bridges over I-75 at exit #'s 76, 77, 83, 87, 90, 95 and 97. | ||
| ** This will also include sweeping the bridges over I-75 and the curbline on the on and off ramps at exit #'s 104, 108, 113 and 120. | ||
| *** This will also include sweeping the bridges over I-75 at exit #'s 125, 126, 129 and 136. | ||
| Sweeping Cycle Start Dates: | ||
| Second Monday in March | Partial Cycle | Sweep 7 |
| Fourth Monday in April | Full Cycle | Sweep 4 |
| Second Monday in June | Full Cycle | Sweep All |
| Fourth Monday in July | Partial Cycle | Sweep 7 |
| Second Monday in September | Full Cycle | Sweep 4 |
| Fourth Monday in October | Partial Cycle | Sweep 7 |
| Second Monday in December | Full Cycle | Sweep All |