Discrepancy_Reports_1.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- CCAO Fire Alarm Services Federal contract opportunity
- Solicitation number
- 140R2025Q0058
About this file
The file is a Discrepancy Reports Excel spreadsheet detailing fire alarm system maintenance issues across multiple Bureau of Reclamation facilities in California. The report documents 149 estimated labor hours for various repair and replacement activities, including battery replacements, detector testing, control panel investigations, and hose replacements at locations such as New Melones Dam, Folsom Dam, and Nimbus Dam power plants and associated facilities.
The related federal contract opportunity is a Sources Sought notice (Solicitation 140R2025Q0058) for fire alarm testing and inspection services at these facilities in Jamestown, Folsom, and Gold River, California. The Bureau of Reclamation is seeking vendors with capabilities in fire alarm system maintenance, with NAICS Code 541350 and a size standard of $11.5M. Interested firms must submit capability statements by May 29, 2025, at 1:00 PM Pacific Time, demonstrating experience, personnel qualifications, and business size status. Responses should include previous project experience and firm classification (e.g., small business, 8(a), HUBZONE).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PWS_CCAO_Fire_Alarm_Systems_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pivot Table
| Reports | https://doimspp-my.sharepoint.com/:f:/g/personal/bsmith_usbr_gov/EuPzhLte65BGvAlTBqYmJbgBsAT8HJ3Fm4CaWx7cnYFSGg?e=XaD1Nz |
| Row Labels | Sum of Hours estimated |
| C&I | 45 |
| Actuator | 2 |
| Folsom Admin Building | 2 |
| Battery | 3 |
| Emergency Generator | 0.3 |
| Folsom Admin Building | 0.3 |
| Folsom Auxiliary | 0.6 |
| Folsom Power Plant | 0.9 |
| New Melones | 0.6 |
| New Melones Oil Purification | 0.3 |
| Beam Detector | 2 |
| Nimbus | 2 |
| Control Panel | 4 |
| Emergency Generator | 4 |
| Damper Control | 2 |
| Nimbus | 2 |
| Heat Detector | 26 |
| Folsom Power Plant | 2 |
| New Melones Power Plant - CO2 | 24 |
| Smoke Detector | 6 |
| Folsom Power Plant | 6 |
| Elect | 56 |
| Control Panel | 40 |
| Civil Maintenance Building | 40 |
| Power Supply | 16 |
| Folsom Admin Building | 16 |
| Mech | 48 |
| Hose | 48 |
| Folsom Power Plant - CO2 | 24 |
| New Melones Power Plant - CO2 | 24 |
| Grand Total | 149 |
../../../../:f:/g/personal/bsmith_usbr_gov/EuPzhLte65BGvAlTBqYmJbgBsAT8HJ3Fm4CaWx7cnYFSGg?e=XaD1Nz Discrepancies
| Site | Component | Scan ID | Location | Solution | Model # | Notes | Craft | Hours estimated |
| Civil Maintenance Building | Control Panel | 64168293 | Electrical room/ Riser room | Fix | Ground Fault | Ground fault on PIV circuit at arrival and departure. |
- FAULT DATA CARD 1
- COMMON TROUBLE ACT SPRINKLER RISER
| - GROUND FAULT DATA CARD 1 | Elect | 40 | |||||||
| Emergency Generator | Battery | 64168341 | electrical room FACP left batt | Replace | 4010 | C&I | 0.15 | ||
| Emergency Generator | Battery | 64168342 | electrical room FACP right batt | Replace | 4010 | C&I | 0.15 | ||
| Emergency Generator | Control Panel | 64168340 | Electrical room | Investigate | CARD 8, NETWORK CARD MISSING | C&I | 4 | ||
| Folsom Admin Building | Battery | 69097630 | IT Room panel left battery | Replace | C&I | 0.15 | |||
| Folsom Admin Building | Battery | 69097631 | IT Room panel right battery | Replace | C&I | 0.15 | |||
| Folsom Admin Building | Actuator | 69097635 | IT Room cylinder | Replace/Test | C&I | 2 | |||
| Folsom Admin Building | Power Supply | IT Room | Alternate power source | In event of fire power trips main breaker and kills power to fire alarm control panel | Elect | 16 | |||
| Folsom Auxiliary | Battery | 64168362 | equipment room FCPS left battery | Replace | BPS | C&I | 0.15 | ||
| Folsom Auxiliary | Battery | 64168363 | equipment room FCPS right battery | Replace | BPS | C&I | 0.15 | ||
| Folsom Auxiliary | Battery | 64168372 | equipment room FACP Backup 3 | Replace | BPS | C&I | 0.15 | ||
| Folsom Auxiliary | Battery | 64168373 | equipment room FACP Backup 4 | Replace | BPS | C&I | 0.15 | ||
| Folsom Power Plant - CO2 | Hose | 69097578 | 2nd floor | Replace | All hoses should be replaced and hydrostatic tested every 5 years | Mech | 24 | ||
| New Melones | Battery | 64168603 | 5th pipe gallery F1B for F1A | Replace | 12v7ahr | C&I | 0.15 | ||
| New Melones | Battery | 64168604 | 5th pipe gallery F1B for F1A | Replace | 12v7ahr | C&I | 0.15 | ||
| New Melones | Battery | 64168547 | FSF 7 FSF4 left battery | Replace | 12v7ahr | C&I | 0.15 | ||
| New Melones | Battery | 64168548 | FSF 7 FSF4 right battery | Replace | 12v7ahr | C&I | 0.15 | ||
| New Melones Oil Purification | Battery | 69097527 | 2nd Fenwal panel left battery | Replace | C&I | 0.15 | |||
| New Melones Oil Purification | Battery | 69097528 | 2nd Fenwal panel left battery | Replace | C&I | 0.15 | |||
| New Melones Power Plant - CO2 | Heat Detector | 69097500 | Unit#1 housing entrance #1 | Replace/Test | 225 | C&I | 2 | ||
| New Melones Power Plant - CO2 | Heat Detector | 69097502 | Unit#1 housing entrance #2 | Replace/Test | 225 | C&I | 2 | ||
| New Melones Power Plant - CO2 | Heat Detector | 69097503 | Unit#1 housing entrance #3 | Replace/Test | 225 | C&I | 2 | ||
| New Melones Power Plant - CO2 | Heat Detector | 69097504 | Unit#1 housing entrance #4 | Replace/Test | 225 | C&I | 2 | ||
| New Melones Power Plant - CO2 | Heat Detector | 69097505 | Unit#1 housing entrance #5 | Replace/Test | 225 | C&I | 2 | ||
| New Melones Power Plant - CO2 | Heat Detector | 69097506 | Unit#1 housing entrance #6 | Replace/Test | 225 | C&I | 2 | ||
| New Melones Power Plant - CO2 | Heat Detector | 69097501 | Unit#2 housing entrance #1 | Replace/Test | 225 | C&I | 2 | ||
| New Melones Power Plant - CO2 | Heat Detector | 69097509 | Unit#2 housing entrance #2 | Replace/Test | 225 | C&I | 2 | ||
| New Melones Power Plant - CO2 | Heat Detector | 69097510 | Unit#2 housing entrance #3 | Replace/Test | 225 | C&I | 2 | ||
| New Melones Power Plant - CO2 | Heat Detector | 69097511 | Unit#2 housing entrance #4 | Replace/Test | 225 | C&I | 2 | ||
| New Melones Power Plant - CO2 | Heat Detector | 69097512 | Unit#2 housing entrance #5 | Replace/Test | 225 | C&I | 2 | ||
| New Melones Power Plant - CO2 | Heat Detector | 69097518 | Unit#2 housing entrance #6 | Replace/Test | 225 | C&I | 2 | ||
| New Melones Power Plant - CO2 | Hose | 62092542 | 1st Unit#2 by CO2 selector valves | Replace | Mech | 24 | |||
| Nimbus | Beam Detector | 64168413 | 3rd floor | Reenable | C&I | 2 | |||
| Nimbus | Damper Control | 64168425 | Trouble on Damper 1, 2, 3 | Fix | C&I | 2 |
File details come from the government source that posted it. Updated .