DIDSurge.pdf

PDF 173 KB Posted

Attached to
Remanufacture of B1 Fuel Valves
Solicitation number
FA811825R0066
Issued by

About this file

This document is a Data Item Description (DID) for a Production Surge Plan, identified by the number DI-MGMT-80969. The document provides detailed instructions for contractors to develop a plan demonstrating their capability to rapidly accelerate and sustain production utilizing existing facilities and equipment during a peace-time acquisition environment, potentially in preparation for emergency or war-related scenarios.

The Production Surge Plan must include specific elements such as: the maximum sustainable production rate (including a production building schedule), two comprehensive lists of subcontracted and non-subcontracted items/components, potential critical items that could impact production, labor requirements for skilled workers, a list of strategic or critical materials, and an inventory of production equipment and tooling. The plan should also describe the potential impact of surging production on current government contracts and the contractor's commercial business, and identify any additional equipment or tooling needed to increase production capacity by up to 10 percent within existing facility limitations.

View the file

Other files

File Type Posted
0001ITEMDESCRIPTION_Redacted.pdf PDF
DIDGP.pdf PDF
GFP.pdf PDF
SpecialPackagingInstructions.pdf PDF
0001IUID_Redacted.pdf PDF
0001QR_Redacted.pdf PDF
0003QR_Redacted.pdf PDF
CAVAF.pdf PDF
DIDCAVAF.pdf PDF
PACKAGING.pdf PDF
TRANSPORTATION.pdf PDF
0003ITEM DESCRIPTION_Redacted.pdf PDF
0003IUID_Redacted.pdf PDF
SOW.pdf PDF
FA811825R0066.pdf PDF
CDRLs.pdf PDF
DIDCDM.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .