CDRLs.pdf
PDF 2 MB Posted
- Attached to
- Remanufacture of B1 Fuel Valves
- Solicitation number
- FA811825R0066
About this file
This document is a Contract Data Requirements List (CDRL) for a Department of Defense contract with the contract number FD2030240230, issued by the 423 SCMS/GUMC at Tinker Air Force Base, Oklahoma. The CDRL outlines four primary data reporting requirements for the contractor:
- Commercial Asset Visibility (CAV) Reporting: Requires daily reporting within 24 hours of supply or maintenance transactions, with electronic submission through the CAV AF website in XML format. 2. Contract Depot Maintenance (CDM) Monthly Production Report: To be submitted monthly within 5 business days of the previous month's last calendar date, covering repair locations, subcontractor facilities, and production details. 3. Government Property Inventory Report: An annual report to be delivered within 7 calendar days of the reporting period end or upon government request, detailing the contractor's internal property control system. 4. Production Surge Plan: A capability analysis plan that outlines the contractor's maximum sustainable delivery rate and capacity to increase production during potential surge scenarios, particularly in the event of national emergency or increased theater warfare demands.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0001IUID_Redacted.pdf | ||
| 0001QR_Redacted.pdf | ||
| 0003QR_Redacted.pdf | ||
| CAVAF.pdf | ||
| DIDCAVAF.pdf | ||
| PACKAGING.pdf | ||
| TRANSPORTATION.pdf | ||
| 0001ITEMDESCRIPTION_Redacted.pdf | ||
| DIDGP.pdf | ||
| GFP.pdf | ||
| SpecialPackagingInstructions.pdf | ||
| FA811825R0066.pdf | ||
| DIDCDM.pdf | ||
| 0003ITEM DESCRIPTION_Redacted.pdf | ||
| 0003IUID_Redacted.pdf | ||
| DIDSurge.pdf | ||
| SOW.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .