About this file

This document is a Data Item Description (DID) for a Production Surge Plan, with the identification number DI-MGMT-80969. The document provides detailed instructions for contractors to develop a plan that demonstrates their capability to rapidly accelerate and sustain production utilizing existing facilities and equipment during peacetime acquisition without a declaration of war or mobilization.

The Production Surge Plan must include several key components: a maximum sustainable production rate building schedule, two comprehensive lists of subcontracted and non-subcontracted items/components (with details like nomenclature, part number, leadtime, and critical/pacing items), a list of government contracts being performed at the contractor's facility, an impact assessment of surging the contract on performance and other government contracts, identification of additional skilled labor requirements, a list of strategic or critical materials needed, and a list of production equipment that could increase production rate or reduce leadtime. The document is marked for public release with unlimited distribution and supersedes a previous version (DI-P-1634A).

View the file

Other files

File Type Posted
PWS.pdf PDF
DID_CDM.pdf PDF
DID_ShipANDPack.pdf PDF
CAV_ReportingRequirements.pdf PDF
DID_GPI.pdf PDF
TRNSPDATA_REPORT.pdf PDF
EXHIBIT A CDRLS.pdf PDF
FA811825R0089 - Repair of B-52 Flow Control Sensor Venturi Valve.pdf PDF
DID_CAV.pdf PDF
PKGRQMT_REPORT.pdf PDF
GFP.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z Check the source to verify that this is the current version before use.

Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z Check the source to verify that this is the current version before use.

File details come from the government source that posted it. Updated .