About this file

This document is a Data Item Description (DID) for a Production Surge Plan, identified by the number DI-MGMT-80969. The document provides detailed instructions for contractors to develop a plan that demonstrates their capability to rapidly accelerate and sustain production utilizing existing facilities and equipment during a peace-time acquisition environment, without a declaration of war or mobilization.

The Production Surge Plan must include specific elements such as the maximum sustainable production rate, building a production schedule, comprehensive lists of subcontracted and non-subcontracted items/components, lists of government contracts being performed at the contractor's facility, detailed impact assessments of surging production, identification of additional skilled labor requirements, and an inventory of strategic or critical materials and production equipment. The plan aims to help contractors improve surge protection capability and enable accelerated production planning for select items, with a focus on reducing production lead times and increasing production rates by at least 10 percent.

View the file

Other files

File Type Posted
SOW.pdf PDF
TRNSPDATA_REPORT.pdf PDF
GFP.pdf PDF
CDRL1_REPORT.pdf PDF
PKGRQMT_REPORT.pdf PDF
DID_CAV.pdf PDF
FA811825R0078 - Remanufacture of F-15 Heat Air Exchangers.pdf PDF
DID_CDM.pdf PDF
CAV_Reporting_Requirements.pdf PDF
DID_GPI.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z Check the source to verify that this is the current version before use.

Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z Check the source to verify that this is the current version before use.

File details come from the government source that posted it. Updated .