DID Production Surge Plan.pdf

PDF 368 KB Posted

Attached to
Remanufacture of Electro-Mechanical Actuator
Solicitation number
FD20302502293
Issued by

About this file

This document is a Data Item Description (DID) for a Production Surge Plan (Identification Number DI-MGMT-80969) with a focus on a contractor's capability to rapidly accelerate and sustain production in a peace-time acquisition environment. The document outlines specific requirements for developing a comprehensive surge plan that includes:

Key components of the Production Surge Plan must detail the maximum sustainable production rate, critical components with potential surge impact, and lists of subcontracted and non-subcontracted items/components. The plan requires identifying strategic or critical materials, potential production bottlenecks, additional skilled labor requirements, and production equipment details. Contractors must provide information on how they would increase production rates by up to 10 percent, including considerations for lead times, critical or pacing items, and potential impacts on existing government contracts. The document is approved for public release with unlimited distribution and is designed to help contractors demonstrate their production surge capabilities in a non-wartime context.

View the file

Other files

File Type Posted
GFP Attachment.pdf PDF
DID TECHNICAL DATA PACKAGE.pdf PDF
CAV AF REPORTING REQUIREMENTS.docx DOCX document
PACKAGING REQUIREMENTS.pdf PDF
DID COMMERCIAL ASSET VISIBILITY (CAV) REPORTING.pdf PDF
TRANSPORTATION DATA.pdf PDF
DID Report of Shipping and Packaging Discrepancy.pdf PDF
SOW.docx DOCX document
DID Government Property (GP) Inventory Report.pdf PDF
DID CONTRACT DEPOT MAINTENANCE.pdf PDF
CDRL.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .