This document is a Data Item Description (DID) that establishes the format and content requirements for a Contractor's Safety Plan applicable to shipyard employment work.
The DI-SAFT-82080 specifies that contractors must prepare a safety plan in their own format complying with 29 CFR 1915, Occupational Safety and Health Standards for Shipyard Employment. The plan must include: methods for communicating potential hazards (including emergency evacuation and muster policy, confined space, and energy control) to both contractor employees and subcontractors prior to task initiation; processes for performing Job Safety Analysis/Job Hazard Analysis (JSA/JHA) for new processes and equipment as well as existing processes involved in mishaps or near misses; procedures for identifying, communicating, abating, and preventing unsafe conditions and work practices; methods to account for personnel working in isolated areas such as confined spaces; approaches to ensure adequate illumination of work areas and walkways; processes for maintaining good housekeeping practices; methods to ensure medical services and first aid accessibility; provisions for adequate and accessible sanitation facilities; and procedures for notifying the Quarterdeck and initiating emergency response. The DID was approved October 4, 2016, under project number SAFT-2016-015 and is applicable to discrete task requirements as delineated in the contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: CONTRACTOR’S SAFETY PLAN
Number: DI-SAFT-82080
AMSC Number: N9731
DTIC Applicable: No
Preparing Activity: SH
Applicable Forms: N/A
Approval Date: 20161004
Limitation: N/A
GIDEP Applicable: No
Project Number: SAFT-2016-015
Use/Relationship: This DID will be used to establish, document, implement and maintain requirements that are appropriated for the work to be accomplished to the requirements of 29 CFR
1915, Occupational Safety and Health Standards for Shipyard Employment.
(https://www.osha.gov).
This DID contains the format and content preparation instructions for the data product generated by the discrete task requirement as delineated in the contract.
Requirements:
Format. The report shall be in the contractor’s format.
Content. The report shall include the following information:
Method(s) of communicating potential hazards, prior to the start of any task, to contractor’s employees.
Hazards shall include emergency evacuation and muster policy, confined space, and energy control.
Method(s) of communicating potential hazards, prior to the start of any task, to subcontractors and other potentially affected personnel.
Hazards shall include emergency evacuation and muster policy, confined space, and energy control.
Process for performing a Job Safety Analysis/Job Hazard Analysis (JSA/JHA) for:
Processes and equipment new to the worksite.
Existing processes and equipment that have been involved in mishaps or near misses.
Process for identification, communication, abatement, and prevention of unsafe conditions and work practices.
Method(s) to account for employees and subcontractors working in isolated areas, e.g.
confined spaces.
Method(s) to ensure work areas and walkways are adequately illuminated.
Method(s) to establish and maintain good housekeeping practices.
Source: http://assist.dla.mil -- Downloaded: 2024-01-29T12:26Z Check the source to verify that this is the current version before use.
https://www.osha.gov/
DI-SAFT-82080
Method(s) to ensure that medical services and first aid are readily accessible.
Method(s) to provide adequate and readily accessible sanitation facilities.
Process for notifying the Quarterdeck and initiating emergency response.
End of DI-SAFT-82080