DID CDM Report.pdf
PDF 267 KB Posted
- Solicitation number
- FA811826R0002
About this file
This document is a Data Item Description (DID) for the Contract Depot Maintenance (CDM) Monthly Production Report, numbered DI-PSSS-81995A and approved on November 30, 2020. The report provides the government with detailed monthly maintenance production information, including maintenance figures, asset status, schedule performance, next month's production forecast, and unresolved problems. It is designed to be used on depot level maintenance contracts and replaces a previous version of the document.
The report requires comprehensive data across multiple blocks, covering item identification, contract details, received reparables, miscellaneous assets, production quantities, serviceables shipped, condemned items, and next month's production forecast. Specifically, the report must include cumulative and monthly quantities for items received, inducted, produced, shipped, and condemned, with a production summary required if there are discrepancies in production forecasts or anticipated production issues. The document includes a standardized table format for reporting these details and is prepared by the Production Management Specialist (PMS) and the contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA811826R0002 0002.pdf | ||
| FA811826R0002_0001.pdf | ||
| CDRLS.pdf | ||
| CAVAF Reporting Requirements.pdf | ||
| GFP Attachment.pdf | ||
| DID GP Report.pdf | ||
| DID TDP.pdf | ||
| Transportation Data.pdf | ||
| Wage Determination.pdf | ||
| Packaging Requirements.pdf | ||
| DID Production Surge Planpdf.pdf | ||
| Appendix A Overhaul.pdf | ||
| DID CAV AF Reporting.pdf | ||
| FA811826R0002.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: CONTRACT DEPOT MAINTENANCE (CDM) MONTHLY PRODUCTION REPORT
Number: DI-PSSS-81995A Approved Date: 20201130
AMSC Number: F10209 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: 70 (419 SCMS/GUBA) Project Number: PSSS-2020-012
Applicable Forms: N/A
Use/Relationship: The Contract Depot Maintenance (CDM) Monthly Production Report provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.
This Data Item Description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in the contract.
a. This DID may be used on any depot level maintenance contract.
b. This DID supersedes DI-PSSS-81995.
Requirements:
1. Reference documents. None.
2. Format. The CDM Monthly Production Report shall be in the Table I format below.
3. Content. The CDM Monthly Production Report shall include the following data, provided by the Production Management Specialist (PMS) and the Contractor, through the end of the month:
3.1 Part I: Blocks 1 through 4 of the report shall contain the following information provided by the PMS:
a. As of date: The day, month, and year (DDMMMYYYY) applicable to the report. Data shall be through the end of the month.
b. Block 1: PMS’s name, PMS’s code, PMS’s email address, and PMS’s phone number.
c. Block 2: Contractor name, the Department of Defense Activity Address Code (DoDAAC) assigned to the contractor for shipment of material, the contractor’s Commercial and Government Entity (CAGE) code, the contractor’s email address, and the contractor’s phone number.
d. Block 3: Contract number and Program (PRGM) or Weapon System (WS) supported.
e. Block 4: Government item manager’s or technical Point of Contact’s (PoC’s) name.
3.2 Blocks A through O of the report shall contain the following information:
a. Block A: Item identification, which shall include the Federal Supply Class (FSC) under A-1, and the National Item Identification Number (NIIN) of the item being reported under A-2.
b. Block B: Delivery/Call Order number. When the awarded contract is a delivery/call order type, this is the applicable order number. When an item is awarded on more than one order, the order number is repeated for each order until completed. If the current report completes the call, the word “completed” shall be added.
c. Block C: The contract line item number (CLIN), which shall be the CLIN assigned to the National Stock Number (NSN) in the contract.
DI-PSSS-81995A
d. Block D: Q uantity on contract or delivery order (DO)/call
e. Block E: Reparables received, which shall be the number of reparable items received for repair, and shall include the q uantity of reparables received during the report month under E-1 and the cumulative q uantity of reparables received from the start of the contract through the report month under E-2.
f. Block F: Miscellaneous (Misc.) assets received that are not part of the contract, in various condition codes, which shall include the q uantity received during the report month under F-1 and the cumulative total received from the start of the contract through the report month under F-2.
g. Block G: Reparables (REPS) on hand, which shall be the number of reparables on hand waiting for induction into repair.
h. Block H: Total number of reparables currently inducted (IND) into work.
i. Block I: Q uantity of reparables awaiting parts (AWP).
j . Block J : Q uantity (Q TY) produced (PROD), which shall include the q uantity that completed repair and was produced during the report month under J -1 and the cumulative total that completed repair and was produced from the start of the contract through the report month under J -2.
k. Block K : Serviceables (SERV ) on hand, which shall be the q uantity of serviceables on hand awaiting shipping action.
l. Block L: Serviceables shipped, which shall be the number of serviceables shipped from the repair facility, and shall include the number of serviceables shipped during the report month under L-1 and the cumulative number of serviceables shipped from the start of the contract under L-2.
m. Block M: Q TY condemned, which shall include the q uantity of reparables condemned during the report month under M-1 and the cumulative q uantity of reparables condemned from the start of the contract under M-2.
n. Block N: Misc. Shipped/Condemned Shipped, which shall include the misc. assets received in Block F that are not part of the contract, in various condition codes or condemned assets shipped during the report month under N-1 and the misc. or condemned assets shipped from the start of the contract through the report month under N-2.
o. Block O: Next Month Forecast PROD, which shall be the q uantity of items scheduled to be produced next month.
3.3 Part II, Production Summary. A Production Summary shall be included only if:
a. The previously reported production forecast was not shipped,
b. The current production forecast does not eq ual the contract scheduled q uantity, or
c. The Contractor anticipates a problem with production in the near future.