About this file

This is a Data Item Description (DID) document that outlines the requirements for a Production Surge Plan (DI-MGMT-80969). The DID specifies how contractors must document their capability to rapidly accelerate and sustain production utilizing existing facilities and equipment during peacetime acquisition, without requiring war declaration or mobilization.

The Production Surge Plan must include: maximum sustainable production rates with monthly buildup schedules; lists of subcontracted and non-subcontracted items/components with nomenclature, part numbers, and leadtimes; lists of government contracts that could be surged with associated priorities; impact analysis on other contracts and commercial business; skilled labor requirements; strategic/critical materials and precious metals inventory needs; and production equipment/tooling requirements that could increase surge capability by at least 10%. The plan should address vertical planning with subcontractors/vendors, maintain rolling 6-month inventory, and identify substitute materials where possible. This DID supersedes DI-P-1634A and works in conjunction with Industrial Preparedness Planning requirements.

View the file

Other files

File Type Posted
DID-81995A CDM.pdf PDF
Special_Packaging_Instructions.pdf PDF
DID-80503 Package and Shipping Discrepancy.pdf PDF
DID-81838_CAV_AF.pdf PDF
Transportation_Data.pdf PDF
SOW.pdf PDF
DID-80441D GFP.pdf PDF
GFP.pdf PDF
CDRL v2.pdf PDF
Packaging_Req.pdf PDF
FA8118-25-R-0026.pdf PDF
CAV AF.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .