This document is a Data Item Description (DID) for a First Article Qualification Test Plan and Procedures, numbered DI-NDTI-81307A, approved on 21 November 2006. The DID provides comprehensive instructions for contractors developing a test plan for first article qualification, specifying the required format and content. Key requirements include documenting the test purpose, applicable documents, description of units to be tested, detailed step-by-step test procedures, test equipment specifications, and inspection criteria that define minimum performance requirements for government acceptance. The document supersedes a previous version (DI-NDTI-81307) and is intended to establish standardized testing protocols for contractors to demonstrate product qualification.

View the file

Other files

File Type Posted
2335091_ITMDESC_REPORT.pdf PDF
3980527_CDRL1_REPORT.pdf PDF
3814457_QUALRQMT.pdf PDF
4136649_PKGRQMT_REPORT.pdf PDF
3844280_SMW_REPORT.pdf PDF
DID_3981508_ATTACH.pdf PDF
4136647_TRNSPDATA_REPORT.pdf PDF
FA812125R0027_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: First Article Qualification Test Plan and Procedures

Number: DI-NDTI-81307A Approval Date: 21 NOV 2006 AMSC Number: 7649 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/I522 Applicable Forms: N/A

Use/relationship:

To establish test procedures, test equipment, and the inspection criteria that will be used by the contractor for first article qualification.

This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID supercedes DI-NDTI-81307.

Requirements:

1. Reference documents. None.

2. Format:

The plan shall be in the contractor’s format.

3. Content:

This test plan shall include the following:

a. Purpose of test.

b. Applicable documents.

c. Description of units to be tested.

d. Test description to include the following:

(1) Step-by-step procedures which are to be followed by the operator when performing each test.

(2) Define readings to be taken, settings to be used, and description of the test equipment, including commercial identification.

DI-NDTI-81307A

(3) Drawings, schematics, photographs, etc, of noncommercial fixtures and testers necessary for test evaluation.

e. Inspection criteria that defines the minimum performance requirements that the unit under test must meet in order to be considered acceptable to the Government. This shall include, as a minimum, worst case prime power input, worst case signal level and timing inputs, and signal level and timing outputs.

4. END OF DI-NDTI-81307A