DI-MGMT-81928 -A002 Progress Rpt.pdf
PDF 59 KB Posted
- Attached to
- Dual Band Radar - VSR Data and Support Federal contract opportunity
- Solicitation number
- N6426724Q5006
About this file
This document provides a data item description for a contractor's progress and status report required under a federal contract. The report must include a cover sheet with identifying information, results from previously identified problem areas, significant changes to the contractor's organization or project milestones, problem areas affecting cost, schedule or technical elements, cost curves showing actual and projected costs throughout the contract, man-hours expended by task area, plans for the following reporting period, and the contractor's point of contact. Financial data in the report must include the contract value, funding to date, costs incurred during the reporting period, planned travel for the upcoming month, and actual monthly hours burned by each contractor. The report templates include tables for work completed by task, funding by contract line item number, and staffing by name, labor category, task area, and comments.
The related federal contract opportunity is a solicitation from the Department of the Navy Naval Sea Systems Command for dual band radar VSR data and support. No further details are provided on products, services, response dates, or other salient information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| CDRL A001_Redacted.pdf | ||
| CDRL A002_Redacted.pdf | ||
| SCA Wage Determination.pdf | ||
| DI-SESS-80776B - A001 TDP.pdf | ||
| Request for Quotations.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: CONTRACTOR’S PROGRESS AND STATUS REPORT
Number: DI-MGMT-81928 Approval Date: 20130701 AMSC Number: N9391 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: SH/PEO IWS F Applicable Forms: N/A
Use/Relationship: Contractor’s Progress, Status and Management Report provides the progress of work and the status of the Program and assigned task, report cost and informs management of existing or potential problem areas.
This Data Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
Requirements:
1. Format. The Contractor’s Progress and Status Report shall be in format similar to that of Figures 1, 2 and 3 of this DID.
2. Content. The report shall contain a cover sheet identifying the following:
a. Title of the Report
b. Contractor’s name and address
c. Contract Number
d. Date of report and period by the report
e. Data Item Number listed on the CDRL DD FORM 1423-1
2.1. Results positive or negative obtained related to previously identified problem areas, with conclusions and recommendations shall be identified.
2.2. Any significant changes to the contractor’s organization or method of operation, to the project management network, or to the milestones shall be included.
2.3. Problem areas affecting cost elements, technical or scheduling elements, with background and any recommendations for solutions beyond the scope of the contract shall also include the following items:
a. Funding Issues
(1) Shortfalls
(2) Overfunding
b. Task Area Issues
Source: http://assist.dla.mil -- Downloaded: 2023-06-15T14:16Z Check the source to verify that this is the current version before use.
DI-MGMT-81928
2.4. The report shall contain cost curves showing actual projected conditions throughout the contract and any cost incurred for the reporting period and total contractual expenditures as of the reporting date.
2.5. The report shall contain Man-hours expended for the reporting period and cumulatively for the contract for the following areas:
a. Trip(s) outside the local area, site visited and purpose.
b. Contract schedule status.
c. Plans for activities during the following reporting period.
d. Name and telephone number of signer of the report.
e. Appendixes for any necessary tables, references, photographs, illustrations, and charts.
2.6 The report shall contain all of the information specified in Figure 3, and shall identify Employee movement, color coded/highlighted in comments column.
2.7. The report shall contain also all of the information specified in Figures 1, 2, and 3.
2.8. The report shall identify the following:
a. Title i.e.: Professional Support Services for the Program Executive Office (PEO) Integrated Warfare System (IWS)
b. Contract Number
c. Latest Contract Modification (# and Date)
d. Period of Performance
e. Reporting Period
f. Contractor’s POC
g. Government PM
h. Government COR
2.5 Financial/Labor Data. The report shall contain all of the information contained to Figure 1 including:
a. Contract Value
b. Funded to date
c. Cost of work performed during period (period to be defined as CY)
d. Planned travel for the upcoming Calendar Month to include location, number of contractor personnel and purpose.
e. Actual: Monthly Hours Burned by each contractor/employee
f. Invoice Date/Amount/Number
3. End of DI-MGMT-81928.
DI-MGMT-81927
Task Sub-task Nr. Task Description Customer Name/Employee Labor or ODCs
(Fully Burdened) Value Funded to Date
Funding Required to End of CY
(Cost)
Funding Required to End of CY
(Fixed Fee)
Funding Required to End of CY
(Total) ACTUAL: Mthly Hours Burned Invoice Number Invoiced Amount Invoiced To Date
Red indicates costs have exceeded funding
Yellow indicates costs are close to exceeding funding.
1.1 1.1.1 NMCI, NAVSEA CIO and Enterprise primary coordinator Jane Doe Labor
ODCs
1.1.2 Assist in Strategic Planning John Smith Labor
ODCs
1.1.3 Portfolio Management. John Doe Labor
ODCs
3.1 3.1.1 ACTD Operations Specialist support John Doe Labor ODCs
Totals
Page 3 of 5 Pages
FINANCIAL/LABOR HOUR DATA BY TASK- FIGURE 1
WORK COMPLETED BY TASK
CLIN/SLIN ACRN PR Number Ref Doc/ACRN MOD Appropriation Subhead OBJ PARM RFM AAA TT PPA Project Unit Funded Expended Balance
Totals $ - $ - $
Totals $ - $ - $
Totals $ - $ - $
Totals $ - $ - $
Totals $ - $ - $
Totals $ - $ - $
Grand Totals $ - $ - $
Page 4 of 5 pages
WORK COMPLETED BY CLIN/SLIN - FIGURE 2
STAFFING PLAN - FIGURE 3
NAME/EMPLOYEE LABOR TASK AREA CONTRACTOR / COMPANY GOVERNMENT FTE HOURS COMMENT
CATEGORY SUPPORTED SUBCONTRACTOR NAME SITE
Page 5 of 5 pages
Task 1 -
Task 2 -
Task3 -IWS Technical - Provide Support to PEO IWS Advanced Technology
| DI-MGMT-81928 CONTRACTOR'S PROGRESS AND STATUS REPORT |
| a. Title i.e.: Professional Support Services for the Program Executive Office (PEO) Integrated Warfare System (IWS) |
| b. Contract Number |
| g. Government PM |
| h. Government COR |
| FIGURE 1. |
| Financial- Labor Hours |
| FIGURE 2 |
| Work Completed By |
| FIGURE 3. |
| Staffing Plan |
File details come from the government source that posted it. Updated .