DI-MFMT-81219.pdf

PDF 44 KB Posted

Attached to
Photocentric LC Titan SLA Machine or Equivalent
Solicitation number
N0016726Q1055
Issued by

About this file

This is a Data Item Description (DID) form that specifies requirements for the Schedule of Structural Work Report, identified as DI-MGMT-81219. The document is approved for public release with unlimited distribution and is maintained by the Defense Logistics Agency (DLA).

The Schedule of Structural Work Report provides a complete list of estimated dates for performance of all related structural work. The report may be prepared in the contractor's format and must contain specific content requirements as outlined in either section 3.2 of MIL-A-8868 for airplanes or section 30.2 of Appendix C to MIL-M-8856 for missiles. The DID was approved on June 21, 1991, and is administered by the Office of Primary Responsibility at AS/AIR-5302. This DID supersedes the previous version DI-P-21461A and is referenced under AMSC Number N6654. The document was downloaded from the DLA ASSIST database on November 18, 2025, and contractors should verify the current version before use.

View the file

Other files

File Type Posted
CDRL A001 Installation Schedule.pdf PDF
N0016726Q1055 CSS.pdf PDF
CDRL A002 Work Milestones.pdf PDF
DI-MGMT-81786.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .