DHR_Talladega_Co_Metal_Roof_Inspection_with_Full_written_report_Dec_2025.docx
DOCX document 15 KB Posted
- Attached to
- DHR Talladega Co Roof inspection
- Solicitation number
- SRC0000026555
- Issued by
- Tuscaloosa County, Alabama
About this file
This is a scope of work document for a metal roof inspection project issued by the Department of Human Resources (DHR) Talladega County, Alabama. The project requires a comprehensive inspection of a metal roof at 1010 Ashland Highway, Talladega, AL, and the submission of a detailed written report with repair recommendations. The inspection must be completed and the written report submitted by January 3, 2025, at 4 p.m. The building is approximately 33,407 square feet, with an estimated inspection time of four hours. The contractor must coordinate the inspection schedule with Director Nicole Parker and/or Finance Officer Becky Carroll, who will identify specific areas of concern and leaks during the inspection.
The unit price must include all costs associated with the inspection, including travel, labor, report preparation, trip charges, supplies, materials, and equipment required to complete the inspection service. The contractor must provide their own ladder as the facility does not have adequate equipment to reach the roof. Payment terms are net 30, paid in arrears after service completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Quick_Quote_Standard_Boilerplate_updated_8-9-24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DHR Talladega Co. Metal Roof inspection – Inclusive of Full Written Report of Repair Recommendations Site Visit Recommended:
Address:
DHR Talladega Co.
1010 Ashland Highway Talladega, Al. 35160
POC:
Becky Carroll 256-761-6602, Finance Officer Nicole Parker- 256-761-6601 Director Main #- 256-761-6600
Work scope:
Unit price represents total costs of Metal Roof inspection and full written report.
Unit price shall include all costs, including travel, labor, report, trip charges, supplies, materials, equipment to complete the inspection service and submit complete inspection report with recommendations of repairs.
Contractor shall provide Full inspection of entire Metal roof per specification requirements. Contractor shall Provide complete written report of entire metal roof inspection and include recommendations of repairs throughout the entire roof, and specifically in arears communicated of actual leaks.
Contractor shall provide ladder. DHR does not have sufficient ladder to reach roof.
Building square footage is estimated 33,407 sq. ft.
Estimated (4) four hours to review entire roof for leak areas & problem areas.
Awarded Contractor shall coordinate and schedule roof inspection in advance with Director Nicole Parker and/ or Finance Officer, Becky Carroll prior to inspection. Contact information is above. Point of Contacts shall identify arears of leaks and other related concerns at inspection.
Awarded Contractor shall meet with Director, Nicole Parker and/ or Finance Officer, Becky Carroll after roof inspection to discuss assessment findings and recommendations.
Contractor shall then submit a Full written report of entire roof assessment and include findings and recommendations of repairs throughout the entire roof, and specifically in arears communicated of actual leaks.
Written Inspection Report shall be submitted no later than January 3, 2025, 4 p.m.
Payment Term: net 30 paid in arrears after completion of service.